Z2LZ--Design Build to Install Parking Shades and Parking Lot Reconfiguration Project 593-26-306
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Department of Veterans Affairs is conducting market research through a Sources Sought Notice for a design-build project to install parking lot shades and reconfigure parking areas at the VA Medical Center in North Las Vegas, Nevada. The project, identified by number 593-26-306 and solicitation number 36C26126R0055, targets the installation of shade structures to protect Veterans and staff from extreme heat while improving pedestrian safety through reconfigured walkways, striped crosswalks, speed tables, LED RRFB signage, and lighting for nighttime use. All designs must comply with VA Master Specifications, the International Building Code, NFPA standards, OSHA, and ADA/ABAAS accessibility requirements, and must match the existing campus aesthetic without incorporating photovoltaic modules. The design-build contractor will be responsible for full architectural and engineering services, including development of design submittals at 35%, 65%, 95%, and 100% stages, construction specifications, engineering calculations, and cost estimates broken out by individual parking lot using VA estimating standards. The project is subject to a total performance period of approximately 515 to 555 calendar days, with design and preconstruction estimated at 120 days from the Notice to Proceed, followed by 320 to 340 days of construction after VA acceptance of the 65% design, and a 45-day closeout phase for as-builts and warranties. Responses to this notice are not proposals and are not binding on the government; they serve solely for market research to determine industry capability, business size classifications, and potential small business set-asides under NAICS code 236220 with a $45 million small business size standard. Offerors must be registered in SAM with a current Online Representations and Certifications Application and must provide their UEI or CAGE number. SDVOSB and VOSB firms must have their status verified by the VA and listed in the SBA’s Dynamic Small Business Search. The government is seeking brief capability statements detailing relevant past performance within the last five years, socio-economic status certifications, response to questions regarding the schedule and bonding, and any feedback on the draft statement of work. All submissions must be received by June 2, 2026, at 1:00 p.m. PDT and sent to the contracting officer. No contract will be awarded based on this notice; a formal solic
General Info
Agency
NAICS
Place of Performance
Department of Veteran Affairs VA Integrated Service Network (VISN) 5, N. Las Vegas, NV, 89086, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Design Build (DB) Contractor shall provide all Architect Engineer (A/E) design services, labor, materials, equipment, supplies, investigations, and professional supervision necessary to develop and deliver the complete design. The Contractor shall also furnish all required construction period services in support of this contract. Design must meet Veterans Affairs Design Guides and Design Criteria and Veterans Affairs Master Specifications at the technical information library TIL (www.cfm.va.gov/TIL). Design must follow all current applicable codes, including:
International Building Code (I.B.C) National Fire Protection Association (N.F.P.A) Occupational Safety and Health Administration (O.S.H.A)
Contractor shall provide all the equipment, labor, materials, tools and supplies required for construction of the project in accordance with the drawings and specifications including Davis Bacon Wage Rate.
The Design Build contractor will be responsible for providing a complete set of construction specifications along with design drawings and engineer calculations for this project.
Estimated Schedule for Design Build & Construction Time (reference SOW Section 3):
Overall PoP (Parallel Design & Construction) Design & Preconstruction (to 65%): Target ~120 calendar days from Design NTP, including BOD/SUE/Geotech, QCP, and 35%/65% workshops. Construction (separate NTP; parallel start): Target ~320 340 calendar days from Construction NTP (issued after VA acceptance of 65%). Final Design (95%/100% IFC): Complete by ~Design NTP + 210 days, supporting early fabrication/field work. Closeout: ~45 calendar days for as builts, O&M, warranties, etc. Total PoP (Design NTP Final Acceptance): ~515 555 calendar days (~17 18.5 months), to be confirmed at 35% based on AE findings, utility conditions, and hospital operations.
(END OF OPPORTUNITY DESCRIPTION)
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Veterans Affairs → 261-NETWORK Contract Office 21 (36C261)
Same awarding agency
