This Solicitation opportunity from Michigan was posted on February 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Y29-Wagar MS - Cabling, Switches and APs
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Airport Commission School District in Carleton, Michigan, is soliciting bids for the Y29-Wagar MS project to implement structured cabling and network infrastructure. This new project manual and Form 470 replace all previous versions. The scope of work includes the installation of 77 Category 6A cable runs with an average length of 250 feet, two 48-port network switches equipped with SFP+ optics, and 15 wireless access points. The requested services encompass Category 2 internal connections and basic maintenance for the switches, wireless access points, and cabling, including all necessary software and licenses. Interested parties must follow the bidding instructions outlined in the project manual. The solicitation was posted on February 4, 2026, with a response deadline of March 4, 2026. Technical inquiries should be directed to Project Manager Elaine Hampstead of Clark Construction Company.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 11 days
- Transformer Oil Testing ServicesOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Structured Cabling (77) Category 6A cable runs (average length 250') Network Infrastructure (2) 48-port Network Switches with SFP+ Optics (15) Wireless Access Points Please refer to the project manual for all bidding instructions.
Requested services (10 line items): - Category 2 — Basic Maintenance Of Internal Connections — Switches - Category 2 — Basic Maintenance Of Internal Connections — Wireless Access Points - Category 2 — Internal Connections — Cabling - Category 2 — Internal Connections — Wireless Access Points And Necessary Software And Licenses - Category 2 — Internal Connections — Switches And Necessary Software And Licenses
State/local procurement requirements: Please refer to the project manual for all bidding instructions. For questions, please contact: Elaine Hampstead Project Manager Clark Construction Company c +13139206198
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260018928/130865/21075479-USAC_FCC_FORM_470_APPLICATION_260018928_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260018928/130865/21074695-Airport%20Schools%20%20Wagar%20MS%20CD%20Technology%20Drawings%202_3_2026.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260018928/130865/21074681-BP01A%20PROJECT%20MANUAL%20_Revised%20for%20ERate%20Low%20Votage.pdf
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
