Yolo 80 Corridor Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Yolo 80 Corridor Improvements Project, managed by Caltrans District 3 in West Sacramento, California, involves the installation of critical signage and tolling infrastructure along Interstate 80 within the Yolo Causeway corridor. Under Permit No. 20085 and in accordance with California Code of Regulations, the project includes the installation of ten fiber optic conduits using PVC Schedule 80 pipes, which will be surface-mounted to existing barriers or buried up to three feet deep, with transverse crossings completed via directional drilling. Additionally, the project entails the installation of one toll reader and two overhead sign structures. One sign structure will be supported by a 60-inch diameter cast in drilled hole pile foundation within a median barrier, while another existing structure near the Unit No. 02 East Levee will be replaced with a new eastbound truss structure supported by two large diameter piles. The Central Valley Flood Protection Board approved the project on September 25, 2026, following a determination that the work will not have a significant environmental effect within the Board's permitting jurisdiction. This determination was supported by an Environmental Impact Report prepared by the lead agency, and no additional mitigation or monitoring plans were required. The project is categorized as a forecast and is coordinated through key personnel at Caltrans and the Central Valley Flood Protection Board to ensure compliance with flood control plans and environmental standards.

General Info

Caltrans project installing signage, tolling infrastructure, and fiber optic conduits along Interstate 80.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

Place of Performance

West Sacramento, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts3 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Angela R Nguyen-TanSenior Environmental Scientist
Jason McComber408 Permitting Liaison

Full Description

Show more
Approval of Permit No. 20085, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install ten (10) fiber optic conduits, two (2) overhead sign structures, one (1) toll reader, and remove one (1) existing overhead sign structure along Interstate 80 within the Yolo Causeway corridor. Fiber optic conduits consisting of 2-inch and 3-inch diameter polyvinyl chloride (PVC) Schedule 80 pipes will be surface-mounted to existing bridge rails, median barriers, bike path barriers, and concrete barriers, and installed below grade within roadway fill sections where necessary, at depths up to approximately three feet below ground surface. All bridge mounted conduits will be above the bridge low chord. Transverse conduit crossings beneath the roadway and medians are also included and will be installed using directional drilling methods. One (1) overhead sign structure supported on a 60-inch-diameter, 24-foot-long cast in drilled hole (CIDH) pile foundation will be installed within a median barrier located in the Yolo Bypass fill section. The existing overhead sign structure near the Unit No. 02 East Levee will be removed and replaced with a new overhead truss sign structure facing eastbound traffic. The existing piles will be removed to approximately three feet below ground surface, with the remaining pile portions abandoned in place. The new structure will be supported on CDIH pile foundations consisting of one 60-inch-diameter, 42-foot-long pile and one 72-inch-diameter, 29-foot-long pile, within the landside slope of the Unit No. 02 East Levee embankment.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support including storm water pollution prevention and quality control. This solicitation is open to qualified small businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and secure bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Certified DBE, MBE, WBE, or OBE firms must provide certification from an approved agency prior to the bid opening. Quotes are due by November 18, 2025, and should be submitted through the Building Connected system. Interested parties may contact Lead Estimator Ken Johnston for further details regarding the project schedule and requirements.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS