Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

York Creek Vineyards LLC Olive Orchard Conversion

Forecast
P25-00012-ECPAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The York Creek Vineyards LLC Olive Orchard Conversion project, managed by Napa County Planning, Building and Environmental Services, involves the conversion of approximately 27.7 gross acres (21.4 net acres) of existing olive and fruit orchards and gardens into a vineyard. Located at 3601 Langtry Road within the York Creek Drainage of the Napa River Watershed, the project requires the removal of non-native grassland and existing trees, grading, and the installation of vineyards. The scope includes earthmoving activities and the implementation of an Agricultural Erosion Control Plan approved on November 24, 2025, in accordance with Napa County Code Chapter 18.108. The project is situated on moderate to steeply sloped terrain, with slopes ranging from 14% to 36%. All activities must remain within the footprint of existing agricultural uses as of June 16, 1993. To ensure environmental compliance, the project is exempt under CEQA Section 15301 Class 1 and must avoid impacts on cultural resources, native bees, northern spotted owls, and nesting birds and raptors. The lead agency contact for this effort is Planner III Pamela Arifian.

General Info

York Creek Vineyards converts 27.7 acres of orchards into vineyards in Napa County.

Agency

California → Napa County

Place of Performance

Langtry Rd and Spring Mountain Road, CA, 94574

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
PAMELA F ARIFIANPlanner III

Full Description

Show more
Conversion to vineyard of approximately 27.7 gross acres (21.4 net acres), including earthmoving activities and installation and maintenance of erosion control measures, of moderate to steeply sloped (slopes range from 14% to 36%, including 6.3 non-contiguous areas on slopes over 30%; all contiguous areas with slopes over 30% are less than one (1) acre) of existing olive and fruit orchards and garden.

Similar Contracts

Same NAICS industry code

NAICS: 115112
SLED
AS27-125 Iron Fire Chaining Private and TLA 2026
Solicitation # AS27-125
The State of Utah Division of Wildlife Resources is soliciting bids for the Iron Fire Chaining Private and TLA 2026 project to provide wildfire rehabilitation services in the Tintic Valley area of Tooele County. The project consists of single pass chaining across approximately 1,699 acres to assist in restoration efforts. Participation is strictly limited to pre-qualified contractors who must provide all necessary labor, supervision, and equipment, including two steel tracked crawler tractors with a minimum drawbar horsepower rating greater than 200 and an on-site arc/acetylene welder. The government will provide at least one 240-foot Ely style anchor chain. Work must be performed on the contour at a maximum speed of 4 mph with lateral spacing not exceeding 100 feet, and is prohibited on slopes greater than 35 percent or in soil with moisture exceeding 15 percent. The contract will be awarded to the lowest cost responsive and responsible pre-qualified vendor based on a per-acre price. All work is expected to be completed by December 18, 2026, with a weather-related extension possible until April 30, 2027. Payment will be issued as a single lump sum upon final inspection of the completed acreage. Contractors must maintain commercial general liability insurance of 1 million dollars per occurrence and 3 million dollars aggregate, as well as statutory workers compensation. Additionally, vendors must certify compliance with Utah Code regarding anti-boycott actions, forced labor restrictions, and E-Verify employment status verification. Performance will be evaluated based on quality of service, timeliness, and contract management to determine future eligibility for the rangeland pre-qualification list.
Utah

POSTED

7 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS