Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

YOSEMITE AVE PAVEMENT IMPROVEMENT PROJECT

Closed
20260618008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Construction On State Highway In Santa Cruz County From 0.5 Mile North Of Larkin Valley Road Undercrossing To Laguna Road
Solicitation # 05-1J9624
Solicitation 05-1J9624 is a unit price construction contract issued by the California Department of Transportation for work on State Highway in Santa Cruz County. The project scope involves various locations from State Park Drive to Laguna Road, with primary objectives to modify existing drainage, replace lighting systems, and install Traffic Management Systems. The estimated project cost is 6,800,000 dollars, and the work must be completed within 300 working days. Job site activities are required to start within 55 days of contract approval, though early starts are possible with specific authorizations. Notably, work in culverts or drainage channels at designated locations is restricted to the period between June 1 and October 31. The contract is governed by the 2025 Standard Specifications and Special Provisions, which include requirements for environmental product declarations for concrete and hot mix asphalt, and the electronic submittal of certified payroll records via LCPtracker Pro. Award is based on the total bid, with a strict requirement to meet the Small Business Enterprise participation goal to avoid being deemed nonresponsive. Certified SBE bidders may receive a bid comparison reduction of up to 5 percent. Contractors must adhere to prevailing wage rates, conduct daily safety inspections per 8 CA Code of Regs, and ensure ADA compliance through pre- and post-construction surveys. Payment administration is managed through the Department's prompt payment monitoring system, requiring subcontractors to be paid within 7 days of progress payments.
California Department Of Transportation Division Of Engineering Services Office Engineer

POSTED

about 13 hours ago

DEADLINE

in about 1 month

General Info

Place of Performance

Manteca, CA, 95337, USA

Set-Aside

NONE

Documents

7

CIP 26039 Yosemite Ave Improvement Project Q&A No. 2

PDF, High priority: read this first3 pages · q-and-a
High

CIP No. 26039 Yosemite Ave Improvement Project Questions & Answers No. 3

PDF, High priority: read this first1 page · q-and-a
High

Yosemite Ave Improvement Project - Bid Set Plans

PDF, High priority: read this first23 pages · specifications
High

Yosemite Avenue Improvement Project Addendum 1

PDF, High priority: read this first118 pages · amendment
High

Yosemite Avenue Improvement Project Addendum 2

PDF, High priority: read this first9 pages · amendment
High

Yosemite Ave Pavement Improvement Project Bid Set Specifications

PDF, High priority: read this first314 pages · bidding-package
High

CIP No. 26039 Yosemite Ave Improvement Project Q&A No. 1

PDF, Medium priority1 page · q-and-a
Medium

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Manteca
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Manteca
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #CIP NO. 26039 STPL 5242(042): The project involves the rehabilitation of the existing roadway surface along Yosemite Avenue from the western City limit to Willow Street. The scope of work includes furnishing all labor, materials, and equipment for the addition of new Class III bike lanes, placement of new asphalt concrete overlay, pavement grinding, rubber cape seal application, dig-out repairs, installation of ADA curb ramps, crack sealing, striping, and traffic control. This also includes site preparation, monument preservation, residential/business notification, furnishing and installing a Water Pollution Control Plan (WPCP), and lead compliance. Work also covers adjusting existing utility frames and covers to grade, replacing loop detectors, installing fire hydrant markers, and various thermoplastic traffic striping and pavement markings, as well as green paint bike lanes and red/yellow curb painting, and sign installation/removal.

More opportunities from California → City of Manteca

Same awarding agency

NAICS: 541330
New
SLED
Wastewater Quality Control Facility Dilution Study And Thermal Plan Exception Analysis Report
Solicitation # 20261001008
The City of Manteca is soliciting professional engineering services to conduct a Dilution Study and Thermal Plan Exception Analysis Report for its Wastewater Quality Control Facility in Manteca, California. The primary objectives of this project are to support the revision of water-quality based effluent limits for ammonia and dieldrin within the National Pollutant Discharge Elimination System and to evaluate compliance with the State’s Water Quality Control Plan for Control of Temperature. The selected consultant will develop the technical, regulatory, and biological justifications necessary to seek a Thermal Plan exception for discharges into the San Joaquin River and identify cost-effective compliance alternatives if an exception is denied. Key deliverables include the final analysis report, a technical memorandum summarizing findings, and a potential compliance strategy memorandum. The contract will be awarded as an Actual Cost with a Not to Exceed Amount agreement, with the City negotiating the final scope and fee with the top-ranked firm. Selection is based on a 100-point evaluation focusing equally on project management, project understanding, project approach, and experience. Proposers must provide a California-registered Professional Engineer to stamp all reports and maintain significant insurance coverages, including 2 million dollars for Commercial General Liability and Professional Liability. Additionally, the consultant must comply with California prevailing wage requirements and provide detailed financial disclosures, such as SEC Form 10-K or 10-Q, as part of the proposal package. Proposals are due by October 16, 2026, and must be limited to 15 pages, excluding appendices and cover letters.
Engineering Services

POSTED

4 days ago

DEADLINE

in 10 days
View Details
NAICS: 541330
New
SLED
Professional Engineering Services for WQCF Dilution Study & Thermal Plan Exception Analysis Report
Solicitation # RFP-2026-0002
The City of Manteca is soliciting proposals for professional engineering services to conduct a Dilution Study and Thermal Plan Exception Analysis Report for its Wastewater Quality Control Facility. The primary objectives of this project are to support the revision of water-quality based effluent limits within the National Pollutant Discharge Elimination System, determine revised ammonia and dieldrin effluent limits under the State Implementation Policy, and evaluate compliance with the State Water Quality Control Plan for Control of Temperature. The selected consultant will be responsible for data collection, modeling, and the preparation of a technical memorandum and final report, while identifying cost-efficient compliance alternatives if a thermal plan exception is not granted. Proposals are due by October 15, 2026, at 5:00 PM PST, with requests for clarification accepted until October 9, 2026. The City will award the contract based on a weighted evaluation of project management, project understanding, project approach, and experience, each accounting for 25 percent of the total score. The resulting agreement is expected to be an Actual Cost with a Not to Exceed Amount contract, with final scope and fees negotiated with the top-ranked firm. Requirements for the selected consultant include adherence to California Prevailing Wage laws, strict quality assurance and quality control procedures, and the provision of financial disclosures such as SEC Form 10-K or 10-Q.
Engineering Services

POSTED

5 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS