YR29-470-BLOOM-C3-Wiring
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Bloom High School District 206 is soliciting proposals for the installation of Cat6 plenum rated copper cabling across four locations in Chicago Heights, Illinois. The project includes approximately 49 new cable runs totaling roughly 4,585 estimated feet distributed among the Alternative High School, Bloom Township High School, the Industrial Education Annex, and Trail High School. Vendors are required to provide a complete solution including all necessary hardware such as patch panels, conduit, data poles, and patch cords, ensuring all installations are supported by J-hooks and properly fire stopped. Proposals must include a detailed line item pricing breakdown for materials and labor, as well as a separate listing for any E-rate ineligible components. All cabling must be tested using a Fluke DSX 8000 or equivalent, and vendors must provide a manufacturer warranty of at least 20 years along with the test results. An optional vendor walkthrough is scheduled for January 5, 2026, and the final deadline for responses is January 16, 2026.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 11 days
- Transformer Oil Testing ServicesOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
- +/- 3 new cable run for a total of 200 estimated feet at Alternative High School, located at 100 W. 10th Street, Chicago Heights, IL 60411.
- +/-28 new cable runs for a total of 3,050 estimated feet at Bloom Township High School, located at 101 W. 10th St. Chicago Heights, IL 60411.
- +/-6 new cable runs for a total of 750 estimated feet at Bloom Township High School, located at the Industrial Education Annex at Bloom High School, located at 101 W. 10th St. Chicago Heights, IL 60411.
- +/-12 new cable runs for a total of 565 estimated feet at Trail High School, located at 22331 Cottage Grove Ave. Chicago Heights, IL 60411.
Additional requirements: 1. There is an optional vendor walk through at 2pm on Monday, January 5, 2026 at 100 W. 10th Street in Chicago Heights, Illinois. Vendors may visit the work areas to properly measure the cable lengths needed. Include patch cables, tie wraps, jacks, raceway, patch panels, etc. for a complete and functioning cable solution for each run. Note: Any e-rate ineligible products, services or components bundled with eligible products or services must be listed separately from the eligible products or services; failure to do so can lead to rejection of the bid/quote. Vendors must provide an eligibility percentage of portions of plans that are deemed ineligible. Proposer's response must include hardware and any applicable warranty requirements. 2. Vendors should provide a line item pricing breakdown of material and labor labor per line item as identified by Room in the, "2026-2027 Erate Cable Runs". Bidders' proposals should be identified by line item. Vendors should also include a breakout of the Bill of materials for cable.
Cabling Requirements 1. Install new Cat6 plenum rated copper cables. The new Cat6 cables will be installed from a gang box attached to the computer desk, data pole or nearby wall to the designated IDF where they will be terminated on a patch panel. Existing gang boxes, data poles , wire molding and open patch panels may be reused, Vendor to install new if none exists or if existing cannot be reused. 2. The Cat6 cabling will be supported above the drop ceiling with J-hooks. All walls will be sleeved with conduit stubs and fire stopped. All locations will be terminated in a gang box or data pole. 3. Vendor will provide all materials needed to complete the cabling installation, including but not limited to, patch panels, conduit, data poles, gang boxes, hooks, patch cords, cables and connectors. 4. Vendor will provide and install two new Cat6 patch cords per new cable drop. In the IDF, one end of the patch cable should be plugged into the patch panel, District staff will connect the patch cable to the switch. At the user location, one end of the patch cable should be plugged into the gang box, District staff will connect the patch cable to the device. 5. All cable must be tested using a Fluke DSX 8000 or similar and manufacturer warranty of at least 20 years should be provided including a cable test results. Floor plans are included along with a summary spreadsheet, labeled as "2026-2027 Erate Cable Runs" as a supplemental document for Bidders to download.
Requested services (2 line items): - Category 2 — Internal Connections — Cabling
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260007148/135505/20757597-USAC_FCC_FORM_470_APPLICATION_260007148_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260007148/135505/20754337-2026%202027%20Erate%20Cable%20Runs.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260007148/135505/20754338-Bloom%20Twp%20HS%20D206%20%20IDFs.pdf