This Solicitation opportunity from Illinois was posted on January 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
YR29-470-FREMONT-C3
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Fremont School District 79 is soliciting proposals to replace existing fiber connections between the Main Distribution Frame and four Intermediate Distribution Frame locations at Fremont Middle School. The project requires the installation of approximately 800 to 900 linear feet of 12-strand OM4 laser-optimized multimode fiber, including the provision and installation of rack-mount fiber patch panels and LC-Duplex components. Vendors are responsible for verifying all measurements during an optional site walkthrough and must provide a detailed cost breakdown that separates materials, unit pricing, and labor for the lower and main levels. Proposals must strictly delineate between E-rate eligible and ineligible products or services, including the specific eligibility percentage for each portion of the plan, to avoid rejection. This solicitation falls under Category 2 Internal Connections for cabling. Interested parties must submit their responses by February 6, 2026, ensuring all technical requirements outlined in the Fiber Statement of Work and provided floor plans are addressed.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 11 days
- Transformer Oil Testing ServicesOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Line Item 1: OM4 Laser-Optimized Multimode Fiber 12-Strand (6-pair) minimum for connectivity from each IDF (IDF1, IDF2, IDF3, and IDF4) to the MDF location with installation. Line Item 2: 1 - Rack-mount fiber patch panel/enclosures (1U or 2U) including the LC-Duplex and any additional necessary components with installation. Line Item 3: 12-strand OM4 fiber cable from the MDF to each of the four IDF locations. Terminate the fiber within a rack-mount fiber enclosure at both the MDF and each IDF location. Note: Any e-rate ineligible products, services or components bundled with eligible products or services must be listed separately from the eligible products or services; failure to do so can lead to rejection of the bid/quote. Vendor must provide eligibility percentage of portions of plans that are deemed ineligible.
Requested services (1 line item): - Category 2 — Internal Connections — Cabling
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260011718/135296/20865584-USAC_FCC_FORM_470_APPLICATION_260011718_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260011718/135296/20773566-Fiber_%20SOW.pdf
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
