This Solicitation opportunity from Department Of Defense was posted on January 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
YXTK 13-1806 Repair Electrical Distribution Lines, Feeder 5, Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a construction project at Ascension Auxiliary Airfield (AAAF) in the South Atlantic Ocean, focused on repairing and replacing the existing overhead electrical feeder system (Feeder 5). The work includes removal of existing overhead lines, poles, hardware, and electrical equipment, followed by installation of new overhead open wire and triplex circuits, new poles, hardware, and electrical components. Additionally, the project entails constructing underground duct banks and manholes to route the new distribution lines beneath roads, ensuring clearance for construction vehicles. The scope emphasizes compliance with current electrical standards, environmental regulations, and safety protocols, with detailed technical drawings and concrete mix designs provided for structural elements. The project is set to be completed within 660 calendar days after the Notice to Proceed, with the deadline for receipt of offers extended from November 6, 2025, to December 8, 2025, via an amendment. The solicitation is a firm fixed-price contract set aside exclusively for 8(a) small businesses under NAICS code 237130. It includes multiple detailed attachments such as bid forms, pricing schedules, technical specifications, safety and environmental standards, and logistics instructions. The procurement emphasizes strict packaging, marking, and transportation requirements for materials shipped from Patrick SFB, Florida, to Ascension Island, including handling hazardous materials and complying with USDA standards and UN restrictions. The contract also incorporates environmental compliance standards specific to Ascension Island, safety inspection procedures, and quality control measures, with inspection and acceptance to occur at the project site in Florida. Offerors are required to submit their proposals electronically, adhering to specified formats and submission deadlines, with the evaluation based solely on the lowest price among technically acceptable offers. The contract clauses and representations are incorporated via FAR and DFARS provisions, ensuring compliance with federal acquisition regulations.
General Info
Place of Performance
FL, SHNSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Amendment 4:
The purpose of this amendment is to (1) incorporate the Government's official responses to contractor-submitted questions, as Section J, Attachment 22, (2) add reference documents, specifically the Design Analysis Section J, Attachment 23 and the Geology Study Section J, Attachment 24, as part of the aforementioned Government responses, and (3) revise the bid opening method from a telephonic conference to a virtual meeting conducted via Microsoft Teams. The access details and procedures for the Microsoft Teams meeting are specified in Section L, Paragraph L-6.
Amendment 3:
The purpose of this Amendment is to change the required bid submission date and bid opening date to allow the Government additional time needed for responding to contractor submitted questions. Government responses to contractor questions will be provided in a subsequent amendment.
Amendment 2:
The purpose of this Amendment is to (1) Revise the required bid submission date as reflected in SF1442 Block 13a to 16 December, 2025, at 9:00 AM local time, (2) Update the USTRANSCOM airfare rate listed in Section C, Para 5.2 to reflect the FY26 rate of $3,238 (one-way), (3) Update Section J, Attachment 9, 2025-2026 Ascension Flight Schedule. Government responses to contractor questions will be provided in a subsequent amendment.
Amendment 1:
The purpose of this Amendment is to extend the deadline for offers due from 6 November 2025 to now reflect 8 December 2025. All other terms and conditions remain unchanged.
Construction. Contractor shall provide all labor, equipment, and materials to repair by replacement the existing overhead Feeder 5 with new overhead lines and poles. Project scope includes removal of overhead electrical distribution lines, poles, pole hardware, guy cables/anchors, and electrical equipment. Installation of new overhead open wire and triplex circuit including all poles, pole hardware, guy cables/anchors, and electrical equipment. Terminate and install new primary feeder wires and cable. Install new Load Break Switch, manholes, and underground duct bank near Hogan's Bypass. New underground duct banks and manholes will be installed to allow the new Feeder 5 distribution lines to travel underneath roads without providing a clearance issue for construction vehicles.
Location: Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean.
More opportunities from Department Of Defense → FA2521 45 Cons Pk
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS