Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of The Interior was posted on May 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--2024 PHILLIPS RESERVOIRS REPAIR

Closed
140L3624B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 2 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

TAINT RESERVOIR PALEFACE RESERVOIR, Malta, MT, USA

Set-Aside

SBA

Documents

1

2024 Phillips Reservoirs Repair Pre-Solicitation Notice

DOCX, Low prioritypresolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Montana State Office
Contacts1 person available
OfficeBILLINGS, MT, 59101, USA
Office AddressBILLINGS, MT, 59101, USA

Full Description

Show more
The Department of Interior, Bureau of Land Management (BLM), Montana State Office intends to solicit sealed bids for construction activities associated with the repair of the Wapati Reservoir dam embankment and for construction activities associated with the repair of spillway and dam embankments for the Taint Reservoir, Paleface Reservoir, and Whiteface Reservoir. The 2024 Phillips Reservoirs Repair project contains four existing reservoirs that need repair work to avoid future failure. All four reservoirs are located in South Phillips County approximately 60 miles south of Malta, Montana. BLM will issue Solicitation Number 140L3624B0001 via https://sam.gov/content/opportunities, at the link provided in this notice. The principal components of the work to be performed include, but are not limited to: - TAINT RESERVOIR o The spillway for this reservoir is severely headcut, with failure expected if not repaired. Repair work consists of spillway reconstruction and dam embankment repair. Remove existing culvert at primary spillway and replace with new. Knock down and contour spillway headcutting and line with permanent erosion control. Build riprap headwall at each end of culvert and riprap stilling basin at outflow. Construct new auxiliary spillway and dike and riprap area of discharge. Build up the upstream face and crest of dam embankment and extend dam embankment to new auxiliary spillway dike. Replace topsoil, spread compost, and reseed new dikes and new spillways. - PALEFACE RESERVOIR o The spillway for this reservoir is severely headcut, with failure expected if not repaired. Repair work consists of construction of new spillway, closing off the existing spillway, and dam embankment repair. Excavate new spillway to the left of the existing dam embankment. Line new spillway with permanent erosion control. Remove culvert at existing primary spillway. Build a new dike to plug the existing spillway. Knock down headcutting at existing spillway and fill to match existing downstream slope of the adjacent dam embankment. Build up the upstream face and crest of dam embankment. Riprap base of new spillway. Replace topsoil, spread compost, and reseed new dike and new spillway. - WHITEFACE RESERVOIR o The spillway and secondary spillway for this reservoir have severe and large-scale headcutting. Repair work consists of repairing and rebuilding the existing primary and auxiliary spillways, and dam embankment repair. Fortify each end of the existing primary spillway culvert with riprap headwalls. Knock down headcutting and contour the area below the culvert discharge. Build a riprap stilling basin and line the contoured downstream with permanent erosion control. Knock down and contour the headcutting below at the auxiliary spillway and line with permanent erosion control. Build up the upstream face and crest of the embankment dam. Build up the crest of the auxiliary spillway with a flow control dike. Replace topsoil, spread compost, and reseed all contoured spillway surfaces and new dike. - WAPATI RESERVOIR o The dam embankment for this reservoir has a large slide on its downstream face and severe wave action erosion on its upstream face. This is dam embankment is in imminent failure. Repair work consists of repairing a large slide in the downstream face of the dam embankment and upstream dam embankment repair. Excavate the full extent of the slide below and beyond the slide plane on all sides to completely remove the slide area. Rebuild the dam embankment. Install permanent erosion control on the upstream face of the rebuilt dam embankment. Replace topsoil, spread compost and reseed the crest and downstream face of the dam embankment. Pursuant to Part 14 and Part 36 of the Federal Acquisition Regulations, BLM intends to issue an Invitation for Bids (IFB) on or around May 22, 2024. The estimated price range of this acquisition is between $250,000 and $500,000. BLM anticipates issuing the IFB under the total small business set-aside program. The applicable North American Industry Classification System (NAICS) Code is 237990 and the associated Small Business Size Standard is $45.0 Million. Reservoir water levels can vary in accordance with local seasonal conditions. Furthermore, several of the reservoirs to be repaired in this project have severe spillway head cuts. Consequently, the Government strongly urges offerors to inspect the sites to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award. An organized site visit is currently planned for Wednesday, June 5, 2024, at 10:00 am local time. Section L, Clause 52.236-27 - Alternate I will have the detailed information for the site visit. A single contract award will be made to the responsible offeror that submits the lowest priced, responsive bid in accordance with the Federal Acquisition Regulations. A firm-fixed priced contract is contemplated. Sealed bids will be due on or around June 27, 2024, at BLM's Malta Field Office, 501 South 2nd St East, Malta, Montana. The successful contractor will be required to commence work within 10 calendar days after the date the Contractor receives the notice to proceed and complete the entire work ready for use within 100 calendar days. The time stated for completion shall include final cleanup of the premises. For further information about the requirement, offerors should contact Christine Mundt at contact@example.gov or at +1 (555) 000-0000. All prospective contractors must be registered in the System for Award Management (SAM) to be eligible for award. If you have not updated SAM since October of 2020, you are advised to update early to be sure you are in compliance with the expanded Section 889 prohibitions on not using certain covered technology products. The successful contractor shall electronically submit all payment requests for the anticipated contract through the U.S. Department of the Treasury's Invoice Processing Platform (IPP). If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the Contracting Officer with its offer.

More opportunities from Department Of The Interior → Montana State Office

Same awarding agency

NAICS: 237110
Federal
Drainage System RestorationThe contract titled Drainage System Restoration pertains to the clear, repair, and reconstruction of culverts, ditches, and stormwater conveyance systems that have been damaged by debris and flooding. This work is essential to restore proper drainage function and mitigate future flooding risks in affected areas. The contract is classified as a subcontract under the NAICS code 237110, which corresponds to Water and Sewer Line and Related Structures Construction, indicating the specialized civil infrastructure nature of the tasks. The contracting agency is the Montana State Office under the Department of the Interior, suggesting the project is situated on federally managed lands or infrastructure. Although the solicitation number and detailed point of contact are not provided, the posted date of June 24, 2026, indicates this opportunity is in the planning or pre-award phase, and work will likely commence after contract award. The place of performance is not specified by city or state, but the involvement of the Montana State Office implies that all work will occur within the state of Montana. The absence of a set-aside designation suggests the subcontract is open to any qualified contractor without specific size or socioeconomic preferences. The task requires technical expertise in erosion control, hydraulic engineering, and heavy civil construction to effectively restore stormwater systems to their functional capacity.
Water and Sewer Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
Emergency Slope Stabilization and RepairThe contract titled Emergency Slope Stabilization and Repair seeks to address damage to road embankments and slopes caused by fire-induced erosion and storm runoff, focusing on immediate stabilization and long-term repair efforts to restore structural integrity and prevent further degradation. Work will involve assessments of affected areas, installation of erosion control measures, regrading of destabilized slopes, and implementation of vegetation or geosynthetic solutions to reinforce the terrain and minimize future vulnerability to weather events. The effort is urgent and tied to the preservation of critical transportation infrastructure within a region impacted by recent environmental disturbances. This subcontract falls under the NAICS code 237990 for other heavy and civil engineering construction and is administered by the Montana State Office under the Department of the Interior. The contract was posted on June 24, 2026, and is intended for performance in an unspecified location within Montana, with no defined place of performance details provided. There is no set-aside classification specified, and no point of contact information is listed, indicating that interested parties must follow the provided SAM.gov link for further submission guidelines and requirements. The work demands technical expertise in earthworks, slope stabilization, and erosion control under challenging post-fire environmental conditions.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS