Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from General Services Administration was posted on January 25, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Anchorage Federal Building First Impressions Project, Anchorage Alaska

Closed
GS-10P-06-LT-C-3001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$1,061,335.6

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Federal Building, USCT, 222 W 7th Ave., Anchorage AK 99513, WA

Set-Aside

SBA

Award Issued Date

Documents

1

20060125140737.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R10 Construction Acquisitions Branch
Contacts2 people available
OfficeTacoma, WA, 98401, USA
Office AddressTacoma, WA, 98401, USA
Contacts
Judith E TomlinsonContracting Officer
Wayne L BenjaminContracting Officer

Full Description

Show more
This is a First Impression Project to improve public spaces in the Anchorage Federal Building and U.S. Courthouse. The Coffee Shop and Scullery alteration includes demolition and construction of new coffee shop and remodeled scullery with new kitchen equipment, and all associated HVAC, mechanical, fire suppression, and electrical work. Options include remodel of mini cache, removal and replacement of glass pivot doors, provide building signage, remodel cafeteria/atrium, removal and replacement of hospitality furnishings. The contractor shall limit his use of the building premises to the work indicated, so as to allow for continued Government occupancy and use of adjacent areas. SELECTION PROCESS: This procurement is issued pursuant to the Small Business Competitive Demonstration Program. Award will be a firm fixed price contract and the procurement method will be a negotiated request for proposal process. The successful offeror will be the technically acceptable firm offering the lowest request for proposal price. The following criteria will be utilized as evaluation factors for award. 1. Prime contractor or subcontractor shall have demonstrated successful completion of alteration and renovation projects in occupied office buildings. Provide documentation to demonstrate successful projects. 2. Provide proposed strategies geared to prime contractor's responsibility to coordinate with tenants all work in order to meet requirements and to be able to execute the project scope of work with a minimum of tenant disruption. 3. Provide documentation to demonstrate contractor's past performance: Offerors shall provide the following information for current contracts, or contracts completed in the past five years (no less than two and no more than four contracts) that are similar to the subject contract (scope of work and dollar value): a. Name of the Customer/Company with whom the contract was held. b. Name and phone number of the primary contact with company. c. Brief description of contract. d. Contract value (total). 4. Provide names, resume, previous contracts, and references of proposed installation team. Include proposed project manager, superintendent, and primary installers. a. Name of employee. b. Resume. c. Names and telephone numbers of three (minimum) to five (maximum) project references. 5. List key personnel, titles, and organizational structure. Technical Proposals shall be evaluated on an ACCEPTABLE or NOT-ACCEPTABLE basis only. Price is considered equally important to the Technical Evaluation Factors. For those proposals which have been deemed technically acceptable, price will become the deciding factor upon which award will be made. Accordingly, award will be made to the offeror whose proposal is determined to be technically acceptable and at the lowest price. The estimated magnitude of this project is between five hundred thousand dollars ($500,000.00) and one million dollars ($1,000,000.00). The approximate duration of the contract is 180 calendar days. The NAICS code for this procurement is 236220. This procurement is 100% SMALL BUSINESS SET-ASIDE. For the purposes of this procurement, a concern is considered a small business if its average annual receipts are $28.5 million or less. The contractor's personnel will be required to obtain security clearances prior to working on this project. The physical protection of Federal employees, the visiting public, and facilities has always been a priority for General Services Administration (GSA). GSA and other Government agencies are reviewing GSA's construction and security criteria to find ways to prevent future occurrences of terrorism. Dissemination of Sensitive but Unclassified (SBU) building information shall only be made upon determination that the recipient is authorized to receive it. Therefore, authorized non-Government users shall provide valid identification to receive SBU building information (request for proposal solicitation). Provide valid identification to the attention of Judith Tomlinson, Contracting Officer, General Services Administration, Design and Construction Contracting Branch (10PCC), 400 15th Street SW, Auburn, WA 98001-6599 no later than December 5, 2005. Offerors must comply with the following requirements excerpted from PBS Order PBS 3490.1: Purpose. This GSA order sets forth PBS's policy on the dissemination of sensitive but unclassified (SBU) paper and electronic building information of GSA controlled space, including owned, leased, or delegated Federal facilities. A major concern of GSA and the Federal Government is the safety and security of people and facilities under the charge and control of GSA. This order outlines the PBS security procedures needed to reduce the risk that the material will be used for dangerous or illegal purposes. Valid identification shall be the following: A copy of a valid business license (if required by the jurisdiction where the business is incorporated or where the job is located). The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. If a business license is not required by the jurisdiction, the information shall be provided and certified; and Verification of a valid D-U-N-S Number against the company name listed on the business license or certification. Verification may be obtained through http://www.fpdc.gov, or by calling Dun & Bradstreet at 703-807-5078 to set up an account; and A Valid Tax ID Number of the company requesting the information [validation procedures being determined]; and A signed certification from the authorized user acknowledging the requirement to safeguard the SBU building information. The certification shall include the definitions of - reasonable care as defined under this order. Please use for purpose of certification the final two pages of this synopsis. Document is entitled "Document Security Notice for Prospective Bidders/Offerors." A Valid State driver's license shall be required of person(s) picking up SBU documents. Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. Reasonable care is defined as: (a) Limiting reproduction and/or dissemination of covered materials only to persons/parties related to the required work or otherwise authorized to receive such information; (b) Making every possible effort that is reasonable and prudent to prevent unauthorized disclosure of this information; (c) Destroying documents no longer needed after completion of the work. Destruction shall be done by burning or shredding hardcopy, and/or degaussing CDs, deleting and removing files from the electronic recycling bins, and defragmenting the computer hard drives. Unsuccessful bidders/offerors shall make every reasonable and prudent effort to destroy or render useless all information/documentation received during the solicitation and/or appeals process upon contract award and completion of any appeals process; (d) Performing due diligence to assure that all those who were in turn given SBU building information in the course of the work (such as subcontractors or suppliers) also adhere to these disposal requirements; (e) The awardee continuing the efforts required above throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the awardee; (f) Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Plans and specs (solicitation) will be available on or about December 13, 2005. Offerors desiring copies of the Request for Proposal Solicitation MUST DO SO IN WRITING and be received by GSA before Request for Proposal documents will be mailed. Requests may be made: (1) via email to Judith Tomlinson: judy.tomlinson@gsa.gov or (2) by fax to her attention at fax no. (253) 931-7395. Submit request for copy of solicitation by December 5, 2005. Include valid identification in order to receive plans and specs. No phone requests accepted. Refer to Solicitation Number GS-10P-06-LT-C-3001 and Project Title (Anchorage Federal Building First Impressions Project, Anchorage Alaska) when ordering. Please be sure to include if you are a Prime, Sub or Plans Room. Authorized non-Government users shall provide valid identification to receive SBU building information (request for proposal solicitation). Project is open to small business. The response due date is ON OR ABOUT January 31, 2006 (The solicitation will define due date and time for your proposal). *****Contractors doing business with GSA are required to be registered in the Central Contractor Registration (CCR) Database prior to award of contract. Go to the following website for more information: https://www.ccr.dlis.dla.mil/ccr/scripts/index.html Click on - new to begin your registration process. General Services AdministrationNorthwest Arctic RegionPortfolio Procurement, 10PDC400 - 15th Street South WestAuburn, WA 98001-6599 Request for: DOCUMENT SECURITY NOTICE TO PROSPECTIVE BIDDERS/OFFERORS This solicitation includes Sensitive But Unclassified (SBU) building information. SBU documents provided under this solicitation are intended for use by authorized users only. In support of this requirement, GSA requires bidders/offerors to exercise reasonable care when handling documents relating to SBU building information per the solicitation. Reasonable care is defined as: (a) Limiting reproduction and/or dissemination of covered materials only to persons/parties related to the required work or otherwise authorized to receive such information; (b) Making every possible effort that is reasonable and prudent to prevent unauthorized disclosure of this information; (c) Destroying documents no longer needed after completion of the work. Destruction shall be done by burning or shredding hardcopy, and/or degaussing CDs, deleting and removing files from the electronic recycling bins, and defragmenting the computer hard drives. Unsuccessful bidders/offerors shall make every reasonable and prudent effort to destroy or render useless all information/documentation received during the solicitation and/or appeals process upon contract award and completion of any appeals process; (d) Performing due diligence to assure that all those who were in turn given SBU building information in the course of the work (such as subcontractors or suppliers) also adhere to these disposal requirements; (e) The awardee continuing the efforts required above throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the awardee; (f) Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Note: It is the responsibility of the person or firm disseminating the information to assure that the recipient is an authorized user and to keep records of recipients. Authorized users shall provide identification as set forth below: Valid identification for non-Government users. Authorized non-Government users shall provide valid identification to receive SBU building information. The identification shall be presented and verified for each dissemination. Valid identification shall be all items (a) through (c), below, and including item (d), as necessary. (a) A copy of a valid business license or other documentation granted by the state or local jurisdiction to conduct business. The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. If a business license is not required by the jurisdiction, the information shall be provided and certified; and (b) Verification of a valid D-U-N-S Number against the company name listed on the business license or certification. Verification may be obtained through http://www.fpdc.gov, or by calling Dun & Bradstreet at 703-807-5078 to set up an account; and (c) A Valid Tax ID Number of the company requesting the information [validation procedures being determined]; and, as necessary, (d) A Valid State driver's license shall be required of person(s) picking up SBU documents. Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. SBU documents will not be released to any individual or firm who has not, either previously or at the time of pickup, supplied the required documentation as outlined in paragraphs (a) through (c), above. 2. Retaining and destroying documents. The efforts required above shall continue throughout the entire term of the contract and for whatever specific time thereafter as may be necessary. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work.). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CD's, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software. 3. Term of Effectiveness. The efforts required above shall continue throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the Government. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. 4. Written agreement of disposal. For all contracts using SBU building information, the contractor shall provide a written statement that he and his subcontractors have properly disposed of the SBU building documents, with the exception of contractor's record copy, at the time of Release of Claims to obtain final payment. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CD's, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software. The recipient acknowledges the requirement to use reasonable care, as outlined above, to safeguard the documents and, if not awarded, the contract (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to destroy or render useless all SBU information received during the solicitation. I agree that I will abide by this agreement and will only disseminate Sensitive But Unclassified (SBU) building information to other authorized user under the conditions set forth above. ____________________________________ __________________________ Signature Date ______________________________ _______________________________ Title Company Name (Attach copy of business License to request.) ______________________________ _______________________________ Telephone Street Address ______________________________ _______________________________ Federal ID Number (Tax ID) City, State, Zip ______________________________ _______________________________ DUNS Number email address FAX this completed document to the attention of the contracting officer, (253) 931-7395. CONTRACTOR DOCUMENT DISPOSAL NOTICE (To be completed and submitted upon close of solicitation, at the time of Release of Claims, or when the need no longer exists for documents) I certify that all documents, hard copy and/or electronic, received by me and/or my subcontractors, with the exception of my record copy, have been properly disposed of using the methods as described in item 4 above. Any record copies of documents will be safeguarded against unauthorized use for the term of retention. _________________________________ ___________________________ Signature Date ****************************************************************************************************************************************** GSA USE ONLY BELOW ****************************************************************************************************************************************** VERIFIED: YES NO COMMENTS: ____________________________________________________ CO Initials ___________ ________________________________________________________________________

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS