Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 17, 2004. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

10--Z-FY05 Maintenance Dredging, 46-Foot Project, Entrance Channel (CUT-1N), Kings Bay, Georgia and Fernandina Harbor, Florida, Nassau County, Florida

Awarded
W912EP-04-B-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 14 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This unrestricted procurement involves the removal of approximately 970,000 cubic yards of material from Entrance Channel Cut-1N to maintain a 46-foot project depth. The scope of work is divided into three primary disposal tasks: 205,000 cubic yards for beach placement at Fernandina Beach, 20,000 cubic yards for nearshore disposal at D/A-N, and 745,000 cubic yards for ocean disposal at D/A-O. The project requires the use of Coast Guard certified hopper dredges, with dredging operations strictly limited to the window between December 15 and February 28. Additional requirements include turbidity monitoring and the trawling and relocation of sea turtles and other endangered species. The total performance period is 100 calendar days, which includes a 30-day mobilization phase. The estimated construction magnitude is valued between 5 million and 10 million dollars. Eligible bidders must be registered in the Central Contractor Registration and comply with NAICS code 237990. While the procurement is unrestricted, a price preference is available for qualified HUBZone small business concerns.

General Info

Contract Value

$2,438,239

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
Project work consists of removing shoals along the Entrance Channel Cut-1N. The contract will require the removal of approximately 205,000 cubic yards of material from Cut-1N between Station 100+00 and Station 220+00 with beach placement at the desi gnated beach disposal area located along the beach at the north end of Fernandina Beach (approximately 4 miles from the project site). The contract will also require the removal of approximately 20,000 cubic yards of material from Cut-1N between Station 2 20+00 and Station 230+00 (north half of channel) with placement in the designated nearshore disposal area, D/A-N, located approximately 7 miles from the project site. Finally, the contract will require the removal of approximately 745,000 cubic yards of m aterial from Cut-1N between Station 220+00 and Station 230+00 (south half of channel) and Station 230+00 and Station 340+00 with placement in the designated ocean disposal area, D/A-O, located approximately 12 miles from the project site. Total quantity o f material to be dredged is approximately 970,000 cubic yards. This work is restricted to coast guard certified hopper dredges in accordance with the Safety Management Action Plan (SMAP). In addition, hopper dredges will only be allowed to work during the period of 15 December through 28 February. Work also includes sea turtle trawling and relocation, turbidity monitoring, and endangered species monitoring. Total Performance Period is 100 calendar day s which includes 30 days mobilization. Magnitude of construction is between $5,000,000.00 and $10,000,000.00. The solicitation will be issued on or about August 26, 2004 and bids will be due on or about October 21, 2004. The solicitation will be posted on our website, and can be downloaded from http://ebs1.saj.usace.army.mil/ebs/AdvertisedSolicitations.asp Any interested bidders must register electronically. If you are not registered, the United States government is not responsible for providing you w ith notifications of any changes to this solicitation. The registration form is located at https://ebs1.saj.usace.army.mil/ebs/AdvertisedSolicitations.asp. THIS ACQUISITION IS AN UNRESTRICTED PROCUREMENT. All responsible sources may submit a bid which w ill be considered. There will be a price preference for identified HUBZone small business concerns that comply with the requirements of the solicitation as stipulated in FAR 19.1307. Note: Contracting information for the Jacksonville District is now ava ilable at our web site: http://www.saj.usace.army.mil/ (Select Contracts/Business Opportunities). You must be registered in the Central Contractor Registration in order to be eligible to receive an award from this solicitation. Call +1 (555) 000-0000 for m ore information or visit the CCR website at http://www.ccr.gov. NAICS Code 237990, size standard $17 million.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS