Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on August 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Gambrill House Porches/Balcony Preservation, HPTC

Closed
140P2124R0051Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Renovate Inpatient Pharmacy Phase II Loma Linda
Solicitation # W912PL27RA004
Solicitation W912PL27RA004 is a Design Build Multiple Award Task Order Contract (DB MATOC) issued by the U.S. Army Corps of Engineers, Los Angeles District. The project requires a Design Build contractor to provide all labor, materials, and equipment for the 100% complete design and construction of renovations and repairs totaling approximately 10,000 square feet on the first floor of Building 1 at the Loma Linda VA Health Care System Hospital in California. The scope of work is divided into three primary areas: a 4,100 square foot inpatient pharmacy modernization, 500 square feet of locker room renovations, and 5,400 square feet of selective corridor upgrades. Key requirements include the management and execution of lead and asbestos abatement, comprehensive modernization of mechanical, electrical, fire sprinkler, and fire alarm systems, and strict adherence to USP 797, USP 800, and VA PG-18-12 pharmacy design standards. The period of performance is 15 months from the Notice to Proceed. The contractor must establish a quality control system complying with FAR 52.246-12 and provide a Cybersecurity Specialist for the installation and testing of required systems. The Department of Veterans Affairs and USACE serve as the sole Authority Having Jurisdiction for all building, fire, and life-safety approvals. Proposals must be submitted in PDF format exclusively through the Procurement Integrated Enterprise Environment (PIEE) solicitation module. While the acquisition strategy prioritizes service-disabled veteran-owned small businesses, the solicitation notes that funds are not presently available for the acquisition. Performance and payment bonds are required, and the project is subject to Davis-Bacon Act wage requirements.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 1 day
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation for DBE subcontractors managed by RT Contractor Corp for the Inland Empire Utilities Agency. The project is located in California, specifically within the Riverside or Los Angeles project areas, and falls under NAICS code 236220. The solicitation was posted on October 22, 2026, with a response deadline of November 4, 2026. To secure project financing and ensure bid responsiveness, contractors must strictly adhere to six Disadvantaged Business Enterprise Good Faith Effort requirements. Most critically, proof of public notice via a 30-day online publication and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency, must be submitted within the bid package. Failure to provide this documentation by the opening date will result in the bid being deemed non-responsive. Documentation for outreach efforts may be submitted up to three business days after the bid closing. Prime contractors are also required to flow these GFE requirements down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a multi-floor water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts. The project is required following a fire sprinkler discharge on June 13, 2026, and involves restoring dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, and the project must comply with NFPA-101 life safety codes, ADA standards, OSHA regulations, and EPA guidelines. The contract is a small business set-aside and will be awarded based on best value, with evaluation weights assigned as 60 percent for price, 20 percent for quality, 10 percent for past performance, and 10 percent for the proposed schedule. Bidders must submit a single lump sum contract bid on company letterhead, including a detailed cost breakdown for labor, materials, and equipment. Requirements for award include a valid Massachusetts contractor's license, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and certification of compliance with Davis-Bacon Act wage determinations. The contractor must provide a one-year guarantee of workmanship and a two-year manufacturer's warranty for any roofing work. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 25 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO

Set-Aside

SBA

Documents

21

140P2124R0051 Amendment 0001

PDF, High priority: read this first1 page · amendment
High

140P2124R0051 Amendment 0002

PDF, High priority: read this first41 pages · amendment
High

140P2124R0051 Amendment 0003

PDF, High priority: read this first1 page · amendment
High

140P2124R0051 - Cost Proposal: Rehabilitation of Exterior Porches at the Gambrill Mansion

XLSX, High priority: read this first6 pages · specifications
High

140P2124R0051 - Gambrill House Porch and Balcony Preservation

PDF, High priority: read this first39 pages · rfp
High

140P2124R0051 - Rehabilitation of Exterior Porches at the Gambrill Mansion Cost Proposal

XLSX, High priority: read this first4 pages · rfp
High

Attachment 3 - Drawings Gambrell House

PDF, High priority: read this firstspecifications
High

Gambrill House Porches & Balcony Preservation - Project Specifications (Rev 3)

PDF, High priority: read this first30 pages · specifications
High

Gambrill House Porches & Balcony Preservation SOW (06-25-2024)

PDF, High priority: read this first5 pages · sow
High

Gambrill House Porches & Balcony Preservation SOW (Rev 2)

PDF, High priority: read this first4 pages · sow
High

Gambrill House Three Porches & Balcony Preservation - Project Specifications

PDF, High priority: read this first31 pages · specifications
High

Gambrill House Three Porches & Balcony Preservation - Project Specifications (Rev 2)

PDF, High priority: read this first30 pages · specifications
High

Gambrill House Three Porches & Balcony Preservation - Project Specifications (Section 01330)

PDF, High priority: read this first30 pages · specifications
High

Gambrill House Three Porches & Balcony Preservation SOW (Rev 1)

PDF, High priority: read this first4 pages · sow
High

MD20240051 - Wage Determination for Frederick County, MD

PDF, High priority: read this first9 pages · wage-determination
High

Standard Form 24 - Bid Bond

PDF, High priority: read this first4 pages · bid-bond
High

Wage Determination MD20240051 - Frederick County, MD

PDF, High priority: read this first9 pages · wage-determination
High

Attachment 5 - Past Performance Questionnaire (Gambrill House)

PDF, Low prioritypast-performance
Low

Attachment 8: Limitations on Subcontracting Report Template

XLSX, Low priority2 pages · other
Low

Revised Past Performance Questionnaire

DOCX, Low priority5 pages · past-performance
Low

Attachment_9_Site_Visit_Parking_Map_0001.jpeg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Deadline changed

Response deadline changed from Aug 5, 2024 to Aug 13, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Washington Contracting Office
Contacts1 person available
OfficeLAKEWOOD, CO, 80225, USA
Office AddressLAKEWOOD, CO, 80225, USA

Full Description

Show more
Independently, and not as an agent of the Government, the Contractor shall provide all labor, materials, equipment and necessary for the repair and preservation of the front and side porches and balcony at the Gambrill House located at 4801A Urbana Pike, Frederick, MD.

More opportunities from Department Of The Interior → Washington Contracting Office

Same awarding agency

NAICS: 334310
Federal
Ruggedized Body-Worn Camera (BWC) Hardware SupplyThe contract entails the supply of ruggedized body-worn cameras equipped with LTE, Wi-Fi, and GPS capabilities, designed specifically for federal law enforcement applications and fully integrated with the Axon Evidence platform to ensure seamless data capture, storage, and management. These devices are built to withstand harsh field conditions, maintaining operational reliability in extreme environments while supporting real-time connectivity and precise location tracking for enhanced situational awareness and accountability. The hardware must meet stringent federal standards for durability, security, and interoperability with existing law enforcement infrastructure. The procurement is structured as a subcontract under the Department of the Interior, managed by the Washington Contracting Office, with no specific set-aside designation applied. The NAICS code 334310 indicates classification within the communications equipment manufacturing sector, underscoring the technical nature of the hardware being sourced. Though no detailed place of performance or point of contact is provided, the contract emphasizes compatibility with the Axon Evidence system, ensuring that all recorded data flows securely into a standardized digital evidence ecosystem compliant with federal retention and audit requirements. The posting date of June 29, 2026, signals a forward-looking acquisition timeline aligned with planned deployments across federal agencies.
Audio and Video Equipment Manufacturing

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 518210
Federal
FedRAMP High-Authorized Cloud Hosting ServicesThe contract entails the provision of secure cloud infrastructure on Microsoft Azure Government to host the Digital Evidence Management System, requiring full compliance with FedRAMP High, CJIS, and NIST 800-53 security standards. This infrastructure must support the storage, management, and retrieval of sensitive digital evidence while maintaining rigorous data protection, access controls, audit logging, and continuous monitoring to meet federal security requirements. The cloud environment will be configured to ensure data sovereignty, integrity, and availability within a government-certified environment, with no reliance on commercial cloud services lacking the necessary authorization levels. The contract is classified as a subcontract under NAICS code 518210, indicating it involves data processing, hosting, and related services, and is administered by the Washington Contracting Office under the Department of the Interior. It was posted on June 29, 2026, and the place of performance is not specified, suggesting the service may be delivered remotely through approved federal cloud zones. The absence of a solicitation number or point of contact implies this contract may be part of a broader framework or already awarded under an existing vehicle. Compliance with all mandated security controls is mandatory, and failure to maintain authorization levels could result in immediate termination or corrective action.
Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS