Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on January 18, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--GAOA SFK DRY BLOOD DAM RECONSTRUCTION

Awarded
140L0622R0038Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The Bureau of Land Management has issued a firm-fixed-price contract for the reconstruction of the South Fork Dry Blood Dam located in Petroleum County, Montana. This total small business set-aside project, identified by solicitation number 140L0622R0038, has an estimated value between 1 million and 5 million dollars. The scope of work encompasses all labor, materials, equipment, and supervision necessary to repair the dam, including the dewatering of the reservoir and the excavation of the existing embankment to remove the primary spillway. Key construction tasks include reconstructing the dam embankment using compacted fill and lime amended fill, installing imported erosion protection and internal filter features, and constructing a precast concrete spillway riser, outlet conduit, and low-level inlet structure. Additional requirements involve building a grouted riprap stilling basin, improving the auxiliary spillway, and surfacing the dam crest with road gravel. The contractor is also responsible for constructing a temporary access road, replacing barb wire fencing and cattle guards, and reclaiming all disturbed areas. The project is governed by heavy construction prevailing wage rates for Montana and requires strict adherence to self-performance thresholds for subcontracting.

General Info

Contract Value

$1,570,570.75

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

9

Attachment 6: Limitations on Subcontracting Breakout (140L0622R0003)

XLSX, High priority: read this first5 pages · specifications
High

SF1442 Solicitation, Offer, and Award (Construction, Alteration, or Repair)

PDF, High priority: read this firstrfb
High

Solicitation 140L0622R0038 Amendment 0001

PDF, High priority: read this firstamendment
High

Solicitation 140L0622R0038 - South Fork Dry Blood Dam Reconstruction

PDF, High priority: read this firstrfp
High

South Fork Dry Blood Dam Reconstruction - Drawing Index and Specifications

PDF, High priority: read this firstspecifications
High

South Fork Dry Blood Dam Reconstruction - Price Schedule (140L0622R0038)

XLSX, High priority: read this first1 page · bid-schedule
High

South Fork Dry Blood Dam Reconstruction Technical Specifications

PDF, High priority: read this firstspecifications
High

Wage Determination MT20220077 - Heavy Construction (Montana)

PDF, High priority: read this firstwage-determination
High

Dry Blood Dam Reconstruction - Site Inspection Tour / Prebid Conference Record

DOC, Low priority6 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Aug 3, 2022 to Aug 5, 2022. The notice title changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Operations Center
Contacts1 person available
OfficeDENVER, CO, 80225, USA
Office AddressDENVER, CO, 80225, USA

Full Description

Show more
The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair South Fork Dry Blood Dam located in Petroleum County, approximately 14 miles north of Winnet, MT. The requirement entails the following significant tasks: 1. Dewater reservoir and construction area. 2. Excavate a portion of the existing dam embankment and foundation to remove the existing primary spillway. 3. Reconstruct the dam embankment, including: a. Placement of compacted fill from onsite borrow sources, b. Placement of compacted lime amended fill, c. Placement of imported erosion protection within excavated areas of the upstream face, d. Placement of erosion protection matting within excavated areas of the downstream face, e. Placement and compaction of imported sand and gravel for internal filter and drain features. 4. Construct a precast concrete spillway riser for a new principal spillway. 5. Construct concrete encased, precast reinforced concrete pipe outlet conduit. 6. Construct precast concrete low-level inlet structure. 7. Construct a grouted riprap stilling basin. 8. Place road gravel surfacing along the crest of the dam. 9. Construct a temporary construction access road from Valentine Rd. to the dam embankment crest, as necessary. 10. Construct improvements to the auxiliary spillway upstream and downstream of the dam centerline. 11. Remove existing barb wire fencing and cattle guards in the vicinity of the dam. 12. Install a cattle new cattle guard on Valentine Rd. and construct a new barb wire fence. 13. Reclaim all disturbed areas, including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding but does not include seeding.

More opportunities from Department Of The Interior → National Operations Center

Same awarding agency

NAICS: 531120
Federal
Milwaukee, WI BLM Warehouse Space
Solicitation # L26PL00026
The Department of the Interior, through the National Operations Center and Bureau of Land Management, is conducting market research to identify existing leased commercial warehouse and secured wareyard space in Milwaukee, Wisconsin. This sources-sought notice, referenced as L26PL00026, seeks expressions of interest for a property located within a specific delineated area encompassing Milwaukee, Greenfield, West Allis, St. Francis, Cudary, Brookfield, and New Berlin. The government requires a warehouse between 5,000 and 6,000 square feet featuring at least two 12x12 drive-in doors, along with a secured fenced wareyard between 39,000 and 45,000 square feet. Additional requirements include six parking spaces, 24/7/365 accessibility, and compliance with all federal, state, and local building and safety codes. Properties located in 100-year floodplains will not be considered. The proposed lease term is 20 years, consisting of a 15-year firm term with government termination rights thereafter upon 120 days written notice. The estimated desired occupancy date is December 1, 2027. Interested parties must submit their expressions of interest electronically to the primary point of contact by October 23, 2026. Submissions must include the building name and address, available square footage for both the warehouse and yard, floor and site plans, confirmation of parking, evidence of ownership, and estimated rental rates. The final transaction will utilize a government standard lease document.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

8 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS