This Government Contract opportunity from Department Of Defense was posted on April 25, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Maintenance Dredging Projects at: U.S. Navy Submarine Base, Kings Bay, Camden County, Georgia (44 and 46-Foot Project) & Marine Corps Support Facility - Blount Island, Duval County, Florida (38-Foot Project)

Awarded
GROUP2-10-R-J005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves maintenance dredging projects at the U.S. Navy Submarine Base in Kings Bay, Georgia, and the Marine Corps Support Facility at Blount Island, Florida. The scope is divided into a Base requirement and six options. The Base work focuses on the Kings Bay Inner Channel (KBIC) from Station 25+000 to 48+175, dredging to depths of 44 and 46 feet, as well as maintenance at the Site Six Operating Area North to 39 feet. Options A through D provide additional maintenance dredging at the KBIC Explosives Handling Wharves, Site Six Operating Area South, Refit Wharves, and the Dry Dock Caisson Gate areas, with depths ranging from 45 to 47 feet. Option E covers the manufacturing of 200 field cut weir riser boards. Option F specifically addresses the Marine Corps Terminal, requiring dredging between Station 00+00 and 56+09.1 to a depth of 38 feet. While material from the KBIC projects is designated for the Big Crab Island Disposal Area, material from the Marine Corps Terminal will be placed in the Dayson Upland Disposal Area. Most dredging options incorporate two feet of allowable overdepth and include requirements for bird monitoring, with Option F adding turbidity and disposal monitoring. The projects are managed by the Department of Defense through the Jacksonville District.

General Info

Contract Value

$5,995,500

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
Project work consist a Base and six options. Options A through E pertain to Kings Bay Inner Channel (KBIC) whereas Option F pertains to Marine Corps Terminal (MCT) only. For the base and the five other dredging options, this contract incorporates two feet of allowable overdepth throughout. The Base work will be at KBIC only and consists of dredging material from KBIC Station 25+000 to Station 48+175 to a 44-foot and 46-foot required depths as identified in the drawings. Additionally, maintenance dredging at the KBIC Site Six Operating Area - North to a 39-foot required depth. Base work also includes bird monitoring, stand by time and field cut weir riser boards. The placement of dredged material will be Big Crab Island Disposal Area (D/A-C) as shown on the plans. Option A work consists of maintenance dredging at KBIC Explosives Handling Wharves (EHW) to a 47-foot required depth. Option A work also includes Bird Monitoring. Option B is maintenance dredging of the south area of the KBIC Site Six Operating Area to a 45-foot required depth. Option B work also includes Bird Monitoring. Option C consists of maintenance dredging of the KBIC Refit Wharves to a 46-foot required depth. Option C work also includes Bird Monitoring. Option D requires removal of shoal material at the KBIC Dry Dock Caisson Gate Sill and Dry Dock Concrete Caisson Gate Mooring Facility to a 46-foot required depth. Option D work also includes Bird Monitoring. Option E consists of manufacturing an additional two-hundred (200) field cut weir riser boards as requested by the Contracting Officer. Option F consists of maintenance dredging at MCT between Station 00+00 to 56+09.1 to a 38-foot required depth. Option F's dredged material will be placed in the Dayson Upland Disposal Area (D/A-D) located across the St. Johns River Back Channel from the Marine Corps Terminal. Option F work also includes bird monitoring, turbidity and disposal monitoring, and stand by time. Kings Bay Naval Submarine Base (Subase) is located near St. Mary's, Camden County, Georgia, or five miles north of the Georgia/Florida Border and 28 miles north of Jacksonville International Airport (JAX). Access to the Subase is approximately 22 nautical miles from the Atlantic Ocean through the confluence of the St. Mary's and Amelia Rivers at Cumberland Sound and along the Atlantic Intracoastal Waterway (AIWW). The channel connecting the inshore waterways to the Subase is known as Kings Bay Inner Channel (KBIC) and is approximately 8.6 nautical miles west of the mouth of the St. Mary's Entrance (River Stations 00+000 to 48+250). The Marine Corps Facility on Blount Island (USMC-BI) is located approximately 8.0 miles northeast of downtown Jacksonville, Florida and nine miles west of the mouth of the St. Johns River. Blount Island is bordered to the north by St. Johns River and Fulton Cutoff Channel to the south.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS