Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on April 1, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--INSTALL SCOUR PROTECTION - VARIOUS BRIDGES

Awarded
NNK10321100RFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 15 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This contract, titled Install Scour Protection - Various Bridges under solicitation NNK10321100R, involves the installation of scour prevention barriers and the filling of designated channel bottoms. The primary technical scope focuses on the furnishing, fabrication, and placement of a polymeric marine mattress system featuring structural geogrid, braid, mechanical connection elements, and stone fill. Additionally, the project requires the installation of cables, cable trays, conduits, and fabricated structural supports, as well as the replacement of timber wales along the fender system. Environmental compliance is a critical component of the work, requiring the protection, monitoring, and observation of wildlife throughout construction. This includes the provision of a designated manatee observer and the necessary notification of relevant agencies regarding work within the waterway. All activities must be performed in accordance with the specified lines, grades, and dimensions outlined in the contract drawings.

General Info

Agency

N/A

Contract Value

$4,179,349

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

8 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: Mar 16, 2010. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice type changed from Presolicitation to Solicitation. Response deadline changed from Mar 16, 2010 to Mar 31, 2010.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project provides for filling indicated portions of the channel bottoms,complete underwater installation of the scour prevention barrier (marine mattress orrubble as indicated in the drawings), protection/monitoring/observing wildlife duringconstruction, providing a designated manatee observer, notifying indicated agencies, ofwork within the waterway, and all other work necessary to complete the installation ofthe scour prevention mat. The scope includes installation of the cable and associatedcable tray, conduits, and fabricated structural supports and replacement of timber walesalong the fender system due to cable installation. This section consists of furnishing apolymeric marine mattress (PMM) system with structural geogrid, braid, mechanicalconnection elements and stone fill, and providing a geogrid composite as specified hereinand shown on the contract drawings. The geogrid material for the mattress shall includesufficient quantities to form lifting hoops for the units. Fabricating, filling andplacing PMM units in accordance with this Section and in reasonably close conformity withthe lines, grades, and dimensions shown on the contract drawings.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS