Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 7, 2004. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z-- IRON CREEK CULVERT REPLACEMENT

Awarded
R6-10-04-75Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
SLED
Water Treatment Plant Maintenance Package ‘A’ Degasifier Package (Project No. 25-4261A)
Solicitation # IFB-395-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-395-26-JM (Project No. 25-4261A) for the Water Treatment Plant Maintenance Package A Degasifier Package. The project involves the replacement of packing media in three degasifiers (units 2, 3, and 4) at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work includes power washing vessel interiors, replacing media support grids and differential pressure gauges, vessel disinfection, and resealing access doors. To maintain continuous plant operations, work must be performed on one unit at a time. The project requires a prime contractor holding an active Florida General Contractor license, a project manager with at least five years of experience in similar projects, and a factory-trained service technician for field performance testing. The contract follows a strict timeline with substantial completion required within 180 calendar days and final project closeout within 210 calendar days from the Notice to Proceed. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the contract price. Award will be granted to the lowest responsive and responsible bidder. Key financial terms include a City Contingency Allowance of 86,000 dollars, with mobilization and demobilization capped at 5 percent and 2 percent of the cost, respectively. The final bid submission deadline was extended to November 18, 2026, at 3:00 PM via the OpenGov e-Procurement Portal.
Public Utilities

POSTED

about 16 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Iron Creek Culvert Replacement project, managed by the Rogue River-Siskiyou National Forest under the Department of Agriculture, involves the removal of an existing culvert and the installation of a new bottomless structural steel-plate arch on concrete footings. Located within the Gold Beach Ranger District, the scope of work includes clearing, excavation, backfill, disposal, and the re-establishment of the road prism. Because the primary objective is to improve fish passage, the contract mandates special requirements for streambed material and related stream work. The estimated price range for this project is between 100,000 and 250,000 dollars, with a strict performance period of 60 calendar days. Bidders are required to provide a bid bond, and the successful awardee must provide performance and payment bonds at 100 percent each. Additionally, the prospective contractor must be registered in the Central Contractor Registration database prior to the award.

General Info

Contract Value

$219,901.63

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

OR

Set-Aside

NONE

Award Issued Date

Documents

1

20040414191541.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rogue River-Siskiyou National Forest
Contacts1 person available
OfficeMEDFORD, OR, 97504, USA
Office AddressMEDFORD, OR, 97504, USA
Contacts
Maggie L. GiulianiContract Specialist

Full Description

Show more
This project involves removal of an existing culvert and replacement with a new structural steel-plate arch (bottomless) on concrete footings and all components related to this work (clearing, excavation, backfill, streambed material, disposal, re-establishing road prism, etc.). This work is primarily for fish passage and has special requirements for streambed material and other stream work. The project is located on the Gold Beach Ranger District of the Rogue River-Siskiyou National Forest.Price Range is between $100,000 and $250,000. Solicitation will be available for download from FedBizOpps on or about April 12, 2004. Bid bond required. Performance and payment bonds (100 percent each) will be required after award. Contract time is 60 calendar days. Note: prospective awardee shall be registered in the Central Contractor Registration (CCR) data base prior to award. Information on registration may be obtained via the internet at: http://www.ccr.gov or by calling +1 (555) 000-0000

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS