This Government Contract opportunity from Department Of Defense was posted on July 17, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Lower Monumental Dam Unit 1 Rewind, Linkage, and Cavitation Repair, and Unit 2 Cavitation Repair

Awarded
W912EF-15-R-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bids for Phase 1 construction of Henry H. Bradby Park in Rushmere, Isle of Wight County, Virginia. The project involves the development of a 51.67-acre county-owned parcel, with approximately 6.63 acres of land disturbance and 45.038 acres remaining as undisturbed open space. The scope of work includes site preparation, clearing, demolition, grading, drainage, and the installation of erosion and sediment control and stormwater management facilities. Additionally, the contractor will construct parking trails, recreational facilities, site furnishings, and landscaping, all while adhering to the 2018 Virginia Statewide Building Code and the latest Virginia Stormwater Management Handbook. The project is funded via the National Park Service's Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with the Federal Civil Rights Act of 1964. Award will be granted to the lowest responsive and responsible bidder. The performance period requires substantial completion within 300 days of the notice to proceed, with final completion due 45 days thereafter. Financial requirements include a 5% retainage on construction projects and the provision of performance and payment bonds, with a specific bid bond required for bids exceeding 500,000 dollars. Bids must be submitted through the designated procurement portal by November 16, 2026.
Parks & Recreation

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 6 hours ago

DEADLINE

N/A

General Info

Contract Value

$16,050,541

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Lower Monumental Dam, 5520 Devils Canyon Road, KAHLOTUS, WA, 99335, USA

Set-Aside

NONE

Award Issued Date

Documents

12

15-R-0001_FIOs-Amend0002_1.pdf

PDF

15-R-0001_FIOs-Amend0002_2.pdf

PDF

15-R-0001_FIOs-Amend0002_3.pdf

PDF

15-R-0001_FIOs-Amend0002_4.pdf

PDF

15-R-0001_Plans_Amend1.pdf

PDF

15-R-0001_Plans.pdf

PDF

Amend_0001_W912EF-15-R-0001_incl_specs_LoMo_1_and_2.pdf

PDF

Amendment_0002_W912EF-15-R-0001.pdf

PDF

Amendment_0003_with_specs_W912EF-_15-R-0001_LoMo_1_and_2.pdf

PDF

Amendment_0004_W912EF-15-R-0001.pdf

PDF

RFP_W912EF-15-R-0001_with_specs_LoMo_1_and_2.pdf

PDF

Site_Visit_info_W912EF-15-R-0001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Feb 24, 2015 to Apr 16, 2015. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Apr 16, 2015 to May 4, 2015. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA
Contacts
Phyllis BuerstatteContract Specialist
Jani C LongContract Specialist

Full Description

Show more
Notice amended 10 March 2015 to provide Site Visit details as follows. The SITE VISIT will be held on 23 March 2015, beginning at 12:30pm, Pacific. Participants will meet at the guard station at the north gate on top of the dam. At 12:30pm, participants will be escorted in their vehicles down to the Visitor Center on the north end of the powerhouse. We will have a brief meeting with introductions, overview of the contract work, our schedule for the site visit, and a review of safety & clearance information for entry into the generator. The site visit will end by 4:00pm. There will be only one site visit offered. The unit will NOT be dewatered for the site visit. A top deck plate will be removed as will a top air shroud to allow access to the top of the rotor, rotor poles, end winding, circuit ring, and main leads. Access will also be available onto the lower bearing bracket and a shroud will be removed to allow participants to see the bottom end winding. Participants will also have access into the turbine pit, but no access to the scroll case or draft tube is available. There is a box with spare laminations that will be available so participants can look at the laminations, however they will not be removed from the box. There are boxes of spare stator bars of which a top and bottom bar has been removed and is available for inspection by the participants. Spare slot wedges are also available for inspection. The Government-Furnished Property (draft tube template, linkage parts, tools, and spare parts) will be available for inspection also. Offerors planning to attend must register for the site visit by sending an email to: contact@example.gov and contact@example.gov. Firms must register no later than the day before the site visit. Site visit attendees must provide the following information: 1) Solicitation Number; 2) Project Title; 3) Name(s) of individual(s) attending site visit; 4) Are all individuals U.S. Citizens? If not, please refer to the note below regarding access for foreign nationals; 5) Name of Company; 6) Phone Number of Company. Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having registered or without picture identification, that individual may not be allowed on the project. Participants of scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, "Personal Protective and Safety Equipment." It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation for going into the powerhouse and into the unit.. Failure to comply could result in denial of access to site visit location. The latest version of EM 385-1-1 is available online at: http://publications.usace.army.mil/publications/eng-manuals/EM_385-1-1_languages/EM_385-1-1_English_2008/toc.html Notice amended 17 February 2015. This notice amendment changes the anticipated solicitation release date, the site visit date, and the due date for receipt of proposals. Solicitation will be released to offerors on or about 10 March 2015. Site visit is scheduled for 23 March 2015. Proposals will be due on or about 04 May 2015. Foreign nationals wishing to attend the site visit should apply immediately, as it takes 2-4 weeks to obtain clearance. (See below.) Construction Project: LOWER MONUMENTAL UNIT 1 REWIND, LINKAGE, AND CAVITATION REPAIR AND UNIT 2 CAVITATION REPAIR This will be a firm fixed-price construction contract located at Lower Monumental Lock and Dam in Franklin County, Washington. Estimated construction magnitude is between $10,000,000 and $25,000,000. Performance and payment bonds (100%) will be required. Time for completion is expected to be 575 calendar days following the Contractor's receipt of Notice to Proceed (NTP) See solicitation for details. The solicitation is open to both large and small business concerns. The small business size standard for NAICS 237990 is no more than $36,500,000 in average annual receipts. DESCRIPTION OF WORK: The work described herein requires mobilization, pre-disassembly operational tests and measurements, hydraulic turbine generator unit disassembly, turbine runner disassembly, BLH internal component replacement and repair, generator rewind, unit runner and discharge ring cavitation repair, turbine runner reassembly, hydraulic turbine generator unit reassembly, reassembly operational tests and measurements, demobilization, and other optional provisions. The work of the linkage upgrade of Unit 1 at Lower Monumental is the complete disassembly of the turbine runner, the installation of Government-furnished BLH internal hub components, and reassembly of the turbine runner for Unit 1. The installation of Government-furnished BLH internal hub components will require final machining and clean up of existing turbine runner parts and new parts to operate as designed. The original manufacturer of the turbine is Baldwin-Lima-Hamilton (BLH) Corporation. The Kaplan turbine repair work includes furnishing and installing all required scaffolding and all required tools, lifting, and handling devices not otherwise furnished by the Government. Provide on-the-job qualified supervisor(s) completely familiar with the type of equipment involved to direct the disassembly, repair, and reassembly of the turbine runner as specified. Perform all work on the unit using skilled craftsmen who are familiar with the type of work and the equipment involved. This project involves cavitation repair on the turbines and discharge ring of Units 1 and 2 of Lower Monumental Lock and Dam. Requirements of this project shall include machine and weld repair, weld inspection and epoxy injection on the discharge ring and turbine. Unit 2 cavitation repair shall occur first, and be performed with the runner in place. Unit 1 shall be completed after Unit 2 is back in service, and can be performed with the unit disassembled. Generator repairs on Unit 1 include replacement of the stator core and winding and accessories, and supplying spare parts for Lower Monumental Generator Unit 1. Unit 1 rotor repairs include cleaning, inspecting and testing the rotor. At the option of the Government, work would include reinsulating rotor field leads and refurbishing all rotor poles. The turbines are Kaplan type manufactured by Baldwin-Lima-Hamilton (BLH) and the generators are manufactured by General Electric (GE). Request for Proposals No. W912EF-15-R-0001 will be posted to the FedBizOpps (FBO) website approximately 10 March 2015. A site visit is expected to be offered on or about 23 March 2015 . Proposals are expected to be due on or about 04 May 2015. See solicitation for details about the site visit and the proposal due date. When issued, the solicitation documents for this project will be available at https://www.fbo.gov Important Note Regarding Access for Foreign Nationals. It takes from 2-4 weeks to obtain clearance for foreign nationals to enter the project site. If your company wishes to have a foreign national participate in the site visit for this project, you are strongly encouraged to submit the required identification immediately. To request clearance for foreign nationals, submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph 9INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to contact@example.gov. Foreign nationals must have received clearance prior to being granted access to the project site. Important Note: The FBO Response Date listed elsewhere in this synopsis is for FBO archive purposes only. It may have no relationship to the actual proposal due date. The proposal due date and time will be contained in the solicitation and any solicitation amendments that are issued. No CDs or hard copies will be made available by the Government. Downloads are available only through the FBO website. Bidders are responsible for checking the FBO website frequently for any update(s) to the notice. The Government is not responsible for any loss of internet connectivity or for a bidder's inability to access the document posted on the referenced website. To obtain automatic notifications of updates to this solicitation, you must log in to www.fbo.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332312
New
Federal
Lower Monumental Diffuser Grating
Solicitation # W912EF27QA011
Solicitation W912EF27QA011 is a firm fixed price contract issued by the US Army Engineer District Walla Walla for the procurement of materials for the Lower Monumental Adult Collection Channel N Entrance Diffuser Grating. This total small business set-aside requires the supply and delivery of aluminum grating, structural steel I-beams and angles, various fasteners, and isolation kits to the Lower Monumental Lock and Dam in Kahlotus, Washington. All materials must be new and meet specific technical standards, including ASTM requirements for tensile strength and water absorption, and ACI standards for anchor design and testing. The delivery deadline is January 8, 2027, with the contractor responsible for all transportation costs under FOB Destination terms. The contract emphasizes strict adherence to quality control and marking standards, requiring items to be identified per MIL-STD-130 and shipments labeled according to MIL-STD-129. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Evaluation of offers will be conducted in accordance with DFARS Part 225 regarding Buy American compliance. Additionally, the contractor must comply with USACE EM 385-1-1 safety manuals and cybersecurity regulations under DFARS 252.204-7012. Inspection and acceptance will occur at the destination in Kahlotus, Washington.
Fabricated Structural Metal Manufacturing

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting offers for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at the Dworshak Dam. This small business set-aside project requires the contractor to provide all personnel, materials, equipment, and transportation to move the bulkheads from Dworshak Dam to a repair facility and back. The scope of work includes existing coating removal, weld inspection and repair according to AWS D1./D1.M standards, and the application of new coatings in compliance with SSPC SP 5/NACE No. 1 and Section 09 97 02.00 28 for hydraulic structures. The government provides the bulkheads as government furnished property, with each unit having an estimated value of 850,000 dollars. The project is structured in three phases, with each phase involving two top and two bottom bulkheads. Performance is scheduled between November 23, 2026, and July 5, 2027, with specific pickup and return windows for each phase. Deliveries and retrievals must be coordinated 15 days in advance and occur Monday through Thursday. Key requirements include a one-year warranty on the coating system, the submission of general inspection reports within five business days of each inspection, and the provision of manufacturer safety data sheets and CERL Lab certification for all paint materials. The contractor must also ensure all paint is stored and packaged according to strict safety and stability guidelines to prevent degradation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

3 days ago

DEADLINE

in about 3 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS