Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 5, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Maintenance Dredging, 32-Foot Project, Alafia River Entrance Channel and Turning Basin, Tampa Harbor, Hillsborough County, Florida

Awarded
W912EP-07-B-0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 14 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by the County of Volusia to reconstruct a beach access ramp in a residential section of Daytona Beach that was destroyed by Hurricane Ian in 2022. The project scope includes the demolition of storm-damaged infrastructure and the installation of a reinforced concrete vehicular ramp, a pedestrian sidewalk, a concrete cap, and composite sheet pile seawall panels and retaining walls. Additional site improvements include FDOT Type D curbing, an on-beach shower, pavement markings, signage, and full site restoration. The estimated construction cost is 1,213,413.00 dollars, with a total contract performance period of 150 days following the Notice to Proceed. Bids are due electronically via the OpenGov Procurement portal by November 5, 2026, at 3:01 pm, and will be awarded to the single lowest responsive and responsible respondent. The contractor must comply with various regulatory requirements, including permits from the FDEP, USACE, and U.S. Fish and Wildlife Service, as well as the Habitat Conservation Plan for the Protection of Sea Turtles. Mandatory requirements include the provision of payment and performance bonds, comprehensive insurance coverage, and adherence to federal contract provisions such as the Davis-Bacon Act and Equal Employment Opportunity standards. Payments are generally made within 30 days of receipt of an undisputed invoice, with specific sales tax exemption procedures in place for materials.
Coastal

POSTED

about 16 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This procurement, identified by solicitation number W912EP-07-B-0019, is a 100 percent small business set-aside for maintenance dredging of the Alafia River Entrance Channel and Turning Basin in Tampa Harbor, Florida. The project involves removing approximately 280,000 cubic yards of shoals to reach required depths of 33 to 34 feet, with an additional one foot of allowable overdepth. All dredged material must be transported to a designated disposal area located roughly 0.7 miles from the site. The scope of work also includes the permanent closure of two existing weir structures and the implementation of a temporary return water system that adheres to environmental regulations and specific dike height restrictions. This project is being processed as a sealed bid procedure with an estimated construction magnitude between 1 million and 5 million dollars. The contract is managed by the Department of Defense through the Jacksonville District office.

General Info

Contract Value

$2,231,538

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
FedBizOpps Numbered Note 1, 100% Set-Aside for Small Business applies to this procurement. This advertisement was originally synopsized under solicitation number W912EP-07-R-0016. Correct solicitation solicitation number is W912EP-07-B-0019. This procurement will be process as a Sealed Bid Procedure. The project work will consist of removing shoals along the Alafia River from Station 0+00 to Station 156+00 to a required depth of 33 feet plus 1 foot allowable overdepth and from Station 156+00 to St ation 181+13.22 to a required depth of 34 feet plus 1 foot allowable depth. Total amount of material to be dredged is approximately 280,000 cubic yards. All dredged material will be placed in the designated disposal area at D/A-C located an average of ap proximately .7 miles from the project site. Two existing weir structures are to be permanently closed off. The Contractor will be required to devise and provide a temporary return water system for use during this project that meets the environmental requ irements and prevents water from being impounded any higher than within 2 feet fo the lowest point on the existing dike. Magnitude of construction is between $1,000,000 and $5,000,000. All responsible small business concerns may submit a bid.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS