Z--McCullah Mining Without a Permit (MWP) reclamation

Active
S07PS00156Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves reclamation work on an existing haul road located off Capuchin Creek Road near the intersection with Whistle Creek Road in Campbell County, Tennessee. The scope of work includes mobilizing labor, equipment, and materials, preparing the site with necessary sediment controls, and constructing an access route to the main roadway. The project entails reclaiming over 1,110 linear feet of roadway, installing a 30-inch HDPE pipe along Capuchin Creek Road, reshaping existing ditches and the roadway, and placing more than 800 feet of rock-lined and erosion-control matted ditches. Additional tasks include installing waterbars every 50 feet on the road, planting wetland vegetation in an abandoned pit area, revegetating all disturbed areas, and applying gravel to the driveway, followed by demobilization. The project budget is estimated between $35,000 and $50,000. Solicitation for the work was planned for release around August 7, 2007, with submissions due by September 6, 2007. The contract is identified under solicitation number S07PS00156, managed by the Department of the Interior’s Headquarters Office in Washington, DC. This work aims to address environmental concerns related to mining activities without a permit, focusing on road reclamation and erosion control to restore affected land areas.

General Info

Reclaim haul road in Campbell County with erosion control, ditch reshaping, pipe installation, revegetation.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

DC

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Headquarters Office
ContactsNo contacts available
OfficeWASHINGTON, DC, 20240, USA
Office AddressWASHINGTON, DC, 20240, USA
ContactsNo contact information available

Full Description

Show more
The project site is located off Capuchin Creek Road near the intersection of Whistle Creek Road, in Campbell County, TN. The project involves reclaiming of an existing haul road and placement of drainage controls. The work performed under this effort consists of the following: mobilization of the Contractors men, equipment and materials; preparation of site and placement of sediment controls; construction of access route from driveway up to main part of roadway; reconstruction/reclamation of over 1110 linear feet of a roadway; placement of a 30 inch HDPE pipe in Capuchin Creek Road; reshape existing ditches and road; installation of over 800 feet of rock lined and erosion control matted ditches; placement of waterbars every 50 feet of road; planting wetland vegetation in an abandoned pit area; revegetation of all disturbed areas; placement of driveway gravel, and; demobilization. The estimated cost of this project is $35,000 to $50,000. Solicitatioin will be issue on or about August 7, 2007 with a due date of September 6, 2007.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS