Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on August 12, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Mechanical Door Replacement VAMC Manchester 100% SDVOSB Set a Side

Awarded
VA24111RQ1170Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation is soliciting bids for a fee-for-service subcontract to provide panic hardware installation services for electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The project requires the contractor to bypass internal lock mechanisms and install Grade I commercial-grade panic bars, exterior trim, rim cylinders, strikes, and door closers at five specific locations: the Cafeteria, Men's Dorm, Women's Dorm, Recreation, and Vocational buildings. All installations must ensure doors open in the direction of exit travel under simple pressure and must comply with NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and the Americans with Disabilities Act. Performance verification requires a minimum of 10 consecutive cycle tests to ensure fail-safe operation. Eligible bidders must be licensed in the State of Idaho and provide a lump sum price for the project. This is a small business set-aside opportunity open to various SBA certifications, including VOSB, SDVOSB, WOSB, and HUBZone. Required submission documents include a bid sheet, a completed supplier packet with a W-9 and self-certification form, and three references, all due by December 1, 2026. The contract is subject to federal regulations, including the Davis-Bacon Act for prevailing wages, FAR clauses regarding the combating of trafficking in persons, and strict security requirements for protecting sensitive government information. Final award will be based on the best value as determined by MTC.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
Federal
Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection Services
Solicitation # FA446027Q0005
Solicitation FA446027Q0005 is a total small business set-aside for a non-personal services contract to provide comprehensive management, tools, supplies, equipment, parts, and labor for the maintenance, repair, and inspection of vertical transportation equipment at Little Rock Air Force Base, Arkansas. The scope of work specifically covers six traction elevators and eleven hydro/electric elevators, with potential requirements for escalators, wheelchair lifts, dock levelers, and dumbwaiters. The contractor must be licensed in Arkansas and adhere to ASME, NFPA, and OSHA standards, maintaining a 95 percent operational time goal through a written Maintenance Control Program. Service requirements include fire service inspections every 30 days, a 24-hour response time for routine calls, and a 2-hour in-person response for emergency calls. The contract is structured as a firm-fixed-price arrangement consisting of a base year starting December 1, 2026, followed by four option years and a final six-month extension ending May 31, 2032. Award will be made to the responsible offeror determined to be most advantageous to the government, based on a sequential evaluation of price and past performance, requiring at least two years of similar experience within the last four years. Contractors must comply with CMMC Level 1 and DFARS cybersecurity requirements, as well as Service Contract Act wage determinations for the local Arkansas region. All payment requests must be processed electronically via Wide Area WorkFlow.
FA4460 19 Cons Pka

POSTED

about 17 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
N099--JLM Roll Up Door Replacement
Solicitation # 36C25627Q0092
Solicitation 36C25627Q0092 is a combined synopsis and request for quote issued by the Department of Veterans Affairs for the replacement of a motorized roll-up door at the John L. McClellan Veterans Hospital. This is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238290. The project requires the contractor to provide all labor, tools, and equipment, including a scissor lift and forklift, to remove and dispose of the existing door and install one grey 7 by 9 foot motorized rolling steel rapid slat door with insulated slats and an obstruction safety device. The award will be a firm-fixed-price contract with a performance period of 30 days from the Notice to Proceed and includes a one-year warranty. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation process, focusing on technical capability, price reasonableness, and the completion of the VA Notice of Limitations on Subcontracting. Interested offerors must submit a three-volume quote package consisting of technical capabilities, a completed price schedule, and the required VAAR certification. Quotes must be emailed to Joseph Warren by 3:00 PM CST on November 18, 2026. A site visit is scheduled for November 6, 2026, at 10:00 AM, and all inquiries must be submitted by November 10, 2026. Performance will take place at the Central Arkansas Veterans Healthcare System in North Little Rock, Arkansas, and contractors must comply with all OSHA, ANSI, CAN, and UL standards.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 17 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
J039--561A4-25-500 Elevator Repair Building 6 and 53
Solicitation # 36C24226R0097
Solicitation 36C24226R0097 is a Request for Proposal issued by the Department of Veterans Affairs for the emergency upgrade and modernization of four elevators at the VA New Jersey Healthcare System Lyons Campus, specifically one passenger elevator in Building 6 and one service and two passenger elevators in Building 53. The scope of work requires the contractor to provide all labor, materials, and supervision to install non-proprietary, microprocessor-based control systems, new geared machines, ADA-compliant car operating panels with braille markings, and new hall fixtures. Performance constraints mandate that no single elevator be shut down for more than 13 weeks, and the contractor must maintain a 24/7 emergency answering service. This procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 238290. Award will be based on a comparative evaluation of technical capability, past performance, and price. Technical requirements include the prime contractor being a licensed elevator maintenance company with a full-time mechanic on staff, a clean safety record regarding OSHA and EPA violations, and the submission of a current Experience Modification Rate. Offerors must also provide a Buy America certificate and a Limitation of Subcontracting Certificate of Compliance. Following several extensions to address requests for information, the final deadline for proposal submission is 1:00 PM on Friday, November 20, 2026.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 17 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract requires a licensed contractor to remove and replace exterior mechanical room doors and frames at the VA Medical Center in Manchester, New Hampshire, specifically across Buildings 2, 3, 4, 5, 6, and 7. Because the existing structures date back to 1948 and contain lead-based paint, the contractor must provide comprehensive lead abatement services, including specialized disposal, worker safety plans, respiratory programs, and medical monitoring. The replacement materials must be steel insulated doors with a 90-minute fire rating, supplied primed for government painting. The project must be completed within 45 days of the notice to proceed, with work performed during regular weekday business hours to minimize disruption to medical center operations. The contractor is responsible for all labor, materials, permits, and the implementation of strict containment and cleaning protocols, including mandatory wipe sample clearance testing. Key administrative requirements include the submission of an Activity Hazard Analysis, proof of OSHA training for all staff, and coordination of all site activities with the COTR.

General Info

Agency

N/A

Contract Value

$62,532

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

VAMC Manchester;718 Smyth Road;Manchester, NH 03104 USA, NH, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
DEPARTMENT OF VETERAN AFFAIRS STATEMENT OF WORK MECHANICAL ROOM DOOR REPLACEMENT 1.0 INTRODUCTION The contractor shall provide all resources necessary to accomplish the deliverables described in the statement of work (SOW), except as may otherwise be specified. The contractor shall provide all the equipment, material and labor to remove and replace existing doors and frames as outlined. These doors and door frames are confirmed to contain lead based paint and will have to be removed and disposed of in compliance with all required local, state, and national regulations associated with the abatement and disposal of lead painted products. 2.0 BACKGROUND It is believed that all of these doors are original to the buildings construction date of 1948. The single doors are used for outside access to the basement mechanical rooms to Building #2 room M2, Building #3 room M3, Building #4 room M4, Building #5 room M5, and Building #6 room M6. Including the double doors located on the west side of Building #7 room G1. This is an exit door from the boiler plant. All of these doors are no longer weather tight and have windows and louvers that do not meet the VA's current security requirements. All of the door frames are mounted into masonry and\or concrete material. All doors have tested positive for lead paint. All work to remove, dispose, and replace these doors is to comply with Federal, State, local, VA, EPA, and OSHA requirements. Worker safety plans, respiratory programs, medical monitoring, and work plans are to be submitted for review and acceptance prior to the start of work on site 3.0 SCOPE Contractor shall provide lead abatement services and the removal and replacement of exterior doors as scheduled in amendment A. The replacement frames and doors will be steel insulated and have fire rating of 90 minutes. All rated door assemblies must be clearly labeled on the hinge side of the frame and installation certified. The doors will be supplied primed ready for painting; the government will paint all finished doors and frames. All work performed on the removal of lead based material and the installation of the new doors and frames shall be performed during regular working hours. The contractor must comply with all applicable NFPA, OSHA, EPA, and VA codes along with all Federal, State, and Local rules and regulations throughout the course of this project. It is recommended and expected that the prospective bidders visit the site to evaluate the existing installation to develop an accurate estimate for bidding and the development of an accurate work plan. There will be one opportunity to visit the site and review the existing conditions coordinated by the COTR. Task #1: The contractor will provide all the labor, material and supplies to complete this project. The contractor is responsible for all fees and permits necessary for the work of this project. The Contractor will provide timely submittals to the COTR per section 6.0 below. Upon approval of Notice to Proceed, the contractor will be allowed to start work on the removal and the replacement of the mechanical room doors on one building at a time, ensuring that the setup of the required containments, monitors, and signage is in place. Only one building will be worked on at a time, ensuring that all mechanical rooms will be secured at the end of each work shift. The sizes of all the identified areas to be repaired are approximated and may vary. All the areas to be repaired will require complete removal of all loose and damaged material. The areas will need to be properly prepared with back filling, and repair, etc. before installation of new doors. All site activity will have prior approval and be coordinated with the COTR including but not limited to the issuing of all ICRA's, ISLM's, Hot Work permits, approval, of all hazardous chemicals and MSDS, etc. to ensure the safety of all Medical Center employees, visitors, patients as well as all contractors. All work will be performed as to minimize the interference of the daily operation of the Medical Center. Task #2: Finish work will include the patching and painting of any surfaces that have been affected by the removal or installation of doors or frames. All work areas will be left clean, neat and safe at the end of each work day, this is mandatory; there will be no exceptions for the daily clean up requirement. All construction waste shall be appropriately stored. The Contractor shall arrange for all waste to be recycled or disposed of in accordance with all Federal, State, or local laws and regulations including the local VA GEMS Coordinator. 4.0 APPLICABLE REFERENCES AND DIRECTIVES 4.1 The provisions of all applicable NFPA, OSHA, EPA, and VA codes, Federal, State, and local regulations shall be followed throughout the course of this project. Applicable VA publications and design manuals are available to the successful bidder at www.va.gov/facmgt. 4.2 Specifications: 01 00 - General Conditions 4.3 Specifications: 01 33 - Shop Drawings 4.4 Specifications: 02 41 - Demolition 4.5 Specifications: 02 83 - Lead Based Paint Removal and Disposal 4.6 Specifications: 08 34 - Doors and Frames 4.7 Specifications: 09 91 - Painting 5.0 PERFORMANCE REQUIREMENTS There is no bulk storage on VA property; however there is some space for the parking of temporary storage trailers and dumpsters with permission applied for through the COTR. The contractor must supply their own storage trailers and dumpster. Contractor vehicles, including those of their employees, are to park in parking lot D or E. The only exception to this rule is that one vehicle carrying equipment of material which is for immediate use may temporarily park near the work site. All work must be scheduled with the COTR a minimum of two weeks in advance of all construction activities. Permission for this exception is required from the VA Police. Smoking is only allowed in designated location. VA personnel familiar with the facilities physical plant and structures will be available during the field investigations. The contractor will be required to provide competent traffic control persons at all times during any construction activity. This work must be completed with the least amount of disruption to the daily operation of the Medical Center and avoid any unnecessary inconvenience to patients, visitors and employees. Performance Period: The period of performance is forty five days (45) after the notice to proceed. Work at the government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO). Normal working hours are Monday thru Friday, 7 AM to 3:30 PM. Place of Performance: The work will be performed at the VA Medical Center located at 718 Smyth Road in Manchester New Hampshire on Buildings # 2, 3, 4, 5, 6, and 7. 6.0 Submittals The contractor will submit a project schedule and work plan including a procedure for the removal, handling and the proper disposal of all lead containing material by a company that in licensed in the State of New Hampshire as a lead Contractor. The VA will provide the third party oversight for the door and frame removal work. This does not relieve the contractor or its sub contractors from the responsibility to perform personal monitoring of their workers in performance of this work if required by regulations. Proof of licensure for the lead contractor and all their workers and supervisors who will be working on station is required to be submitted for review and acceptance prior to the start of work on station. Additionally, worker safety plans, respiratory programs, and medical monitoring, are to be submitted for review and acceptance prior to the start of work on site. Clearance testing (wipe samples) for the work area is required for the areas where the lead painted items are removed. Areas that do not pass wipe tests are to be re-cleaned prior to any retesting. Re-cleaning is to be at no cost to the government and is to be included in the contract price. If necessary, additional retesting after the initial and first retest will be at the cost of the contractor by a laboratory acceptable to VAMC. The laboratory proposed by the contractor shall be a participant in good standing in the National Lead Laboratory Accreditation Program (NLLAP). The Contractor shall complete and submit an Activity Hazard Analysis (AHA). A blank AHA form is available at http://www.swf.usace.army.mil/pubdata/safety/PDF/blank_AHA_Form.pdf. The Contractor shall also submit proof of completion of OSHA Construction training, 10 hour course for all workers assigned to the site and 30 hours for site supervisors. The contractor will also submit a work schedule for the review and approval of the Contracting Officer or COTR. The contractor will provide submittals for all material including doors, frames, door hardware that is Best Lock compatible, all chemicals including MSDS data sheets, for advance approval before any items are brought on the VA property. The Contractors schedule shall include a minimum two week review period for all submittals. END OF SCOPE

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS