Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Z--Missoula BLM Roads Fallen Tree and Debris Removal

Awarded
140L3626Q0027Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bureau of Land Management’s Montana State Office, under the Department of the Interior, is executing an emergency procurement for fallen tree and debris removal on federally owned roads in Missoula County, Western Montana, following a December 2025 atmospheric river event designated as Disaster MT 2026-1-BLM. This action is justified under FAR 6.103-2 due to unusual and compelling urgency, which necessitates immediate response to prevent further infrastructure degradation, ensure public and emergency access, and maintain eligibility for federal funding through the Emergency Relief for Federally Owned Roads program. The solicitation, identified as 140L3626Q0027 and posted on June 24, 2026, with a submission deadline of May 11, 2026, is structured as a fair opportunity process among pre-identified contractors, including NorthForge Contracting LLC, Hatt and Son Logging, Bull Creek Forestry, Park Logging, Westslope Forest Management, and Evergreen Forest Management, all evaluated for capability, immediate availability, geographic proximity, and suitability as a medium-sized operator. The award will be based on best value, considering technical merit and operational responsiveness over price alone, with no formal cost estimates or pricing details provided in the documentation. Performance will occur at various locations within the Missoula County district where emergency road repairs are needed, with inspection and acceptance conducted by government representatives at the site of completed work under the authority of the Contracting Officer, Jorge Alvarez, and the Contracting Officer’s Representative, Kathleen C. Marks. No formal contract clauses, packaging requirements, invoicing procedures, or detailed specifications are included in the provided material, as the document serves as a justification for emergency competition rather than a full contract. Offerors are required to have valid Unique Entity IDs, with NorthForge Contracting LLC identified as a Service-Disabled Veteran-Owned Small Business, potentially triggering additional reporting obligations. The work entails slope stabilization, drainage restoration, and removal of debris to reopen critical transportation routes, with performance timing tied to the urgency of the disaster response and federal funding deadlines. The contracting office is located in Billings, MT, and while the exact period of performance is undefined, completion must occur promptly to avoid loss of federal reimbursement and mitigate safety hazards.

General Info

Removal of fallen trees and debris on BLM roads in Missoula under solicitation 140L3626Q0027.

Agency

Department Of The Interior → Montana State OfficeView Agency

NAICS

115310 - Support Activities for ForestryView NAICS

Place of Performance

MT

Set-Aside

NONE

Documents

(1)

JOFOC_Fallen_Tree___Debris_Removal_Redacted_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Justification (J&A)

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Montana State Office
Contacts1 person available
OfficeBILLINGS, MT, 59101, USA
Organization / Agency
Department Of The Interior → Montana State Office
View Agency Profile
Office AddressBILLINGS, MT, 59101, USA

Full Description

Show more
Missoula BLM Roads Fallen Tree and Debris Removal

The Justification and Approval (J&A) authorizes and approves an execution to fair opportunity basis as shown in the Attachment.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
Florida Forest Service Statewide Wildfire Mitigation Services
Solicitation # ITB FFS 26 27 04
The Florida Department of Agriculture and Consumer Services, through the Florida Forest Service, is soliciting bids under ITB FFS 26 27 04 to establish fixed-rate Term Agreements for statewide wildfire mitigation services. The scope of work includes forestry mowing, mulching, chopping, vegetation grinding, tree removal, and land preparation services across various service levels. The Department intends to award up to ten agreements per service level within each FFS Region to responsive and responsible vendors offering the lowest initial term sub-total based on a maximum rate unit price per acre. The contract features an initial three-year term with the possibility of three one-year renewals and a single extension of up to six months. Selected contractors must adhere to strict performance standards, including mulching vegetation to two to three inches above ground level and ensuring no residue exceeds three feet in height. Operational requirements include the presence of a contractor foreman on-site to avoid financial penalties and the use of certified pile burners for on-site debris disposal via air curtain incinerators. Insurance mandates include general liability of one million dollars per occurrence, automobile liability of three hundred thousand dollars, and worker's compensation per Florida Statutes. Bids must be submitted in sealed packages by September 30, 2026, and include specific certifications regarding lobbying, debarment, and drug-free workplace programs. Payment is contingent upon annual legislative appropriation and is processed following a five-business-day inspection and approval period.
Department of Agriculture and Consumer Services

POSTED

about 22 hours ago

DEADLINE

in 18 days
View Details
NAICS: 115310
New
SLED
East Fork Scott River Forest Health Implementation Project
Solicitation # 2025-47-065
The East Fork Scott River Forest Health Implementation Project, managed by the Shasta Valley Resource Conservation District in Siskiyou County, California, focuses on improving forest health, enhancing wildlife habitat, and reducing the risk of severe wildfires within the Beaver Valley Headwaters Preserve. The project involves hazardous fuels and vegetation treatments across up to 397 acres, including an initial 263 acres and a subsequent amendment adding 134 acres on lands managed by The Wildlands Conservancy. Key deliverables include 186 acres of ridgeline shaded fuel breaks, 124 acres of shaded fuel breaks along Highway 3, 38 acres of pile burning, and the removal of invasive Dyer's Wood along roads. Implementation methods consist of non-commercial manual thinning, pruning, mastication, chipping, hand piling, and pile burning. The project is conducted under the California Environmental Quality Act (CEQA) and has been granted a Negative Declaration, indicating no significant environmental impacts. Strict operational standards are in place, including the exclusion of heavy equipment from specific watercourse buffers and the prohibition of vehicle operations during saturated soil conditions. Special protections are mandated for cultural resources and the California Condor, with specific noise and habitat disturbance buffers around occupied nests. Project oversight includes inspections of refueling areas and adherence to a Categorical Waiver of Waste Discharge Requirements to ensure water quality and erosion control. Primary points of contact for the project include District Manager Rod Dowse, Forester Dan Blessing, and Project Coordinator Renee Main.
Shasta Valley Resource Conservation District

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 115310
New
SLED
Caltrans District 4 Vegetation Management Program Corridor -Contract 3 Wildfire Adaptation Fuel Reduction Vegetation and TreeThe Caltrans District 4 Vegetation Management Program Corridor Contract 3 is a wildfire adaptation project focused on fuel reduction and tree removal across approximately 1,697.34 acres at 27 locations along the State Highway System in eight Bay Area counties, including Alameda, Contra Costa, Marin, Napa, Santa Clara, Solano, Sonoma, and San Mateo. The primary objective is to reduce wildfire ignition risk and establish shaded fuel breaks to ensure consistent roadway access for the public and emergency first responders. The scope of work includes clearing vegetation within 10 feet of the edge of pavement to bare soil, removing invasive and diseased vegetation, reducing ladder fuels in native shrublands, and removing trees under 10 inches DBH while prioritizing the preservation of larger trees. These activities will be executed using manual, mechanical, and herbicide treatments. The project operates under a statutory CEQA exemption based on Governor Newsom's wildfire State of Emergency Proclamation and must adhere to the Statewide Fuels Reduction Environmental Protection Plan. On-the-ground activities are required to commence by October 15, 2026, with a performance period of up to two years. All work must be performed by or under the direction of a qualified responsible party, such as a registered professional forester or certified arborist. Compliance will be monitored through on-site inspections by various state agencies, including the State Water Board and CAL FIRE, to verify the implementation of best management practices.
Caltrans, District 4 - Bay Area/Oakland

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 115310
New
SLED
Fall 2026 Herbicide Release
Solicitation # RFP-2025-0147
Tuolumne County is soliciting proposals under RFP-2025-0147 for qualified contractors to perform chemical herbicide release on approximately 973 acres within the Rim Fire burn scar in the Stanislaus National Forest. The project aims to support the growth of seedlings planted in 2025 and 2026 by reducing competing vegetation. All work must be completed by October 31, 2026, or upon the first significant rain event or senescence of deciduous vegetation. The project is managed by the County with program administration and project oversight provided by the subcontracted Yosemite River's Alliance. Eligible contractors must possess a California Agriculture Pest Control Operator License with Category E Forest, a Pest Control Business License, and registration as a Farm Labor Contractor with the US Department of Labor. Requirements include at least three years of experience in forested environments, a clean bankruptcy record for the past five years, and the ability to provide a foreman fluent in English. The award will be based on best value, weighted 40 percent on reasonable cost and 30 percent on qualifications and experience. Operational standards mandate strict adherence to the Rim Fire Restoration and Reforestation Record of Decisions, including specific herbicide mixing ratios, nozzle pressure of 15 psi, and the use of factory-sealed containers no larger than 2.5 gallons. Contractors are responsible for all spill clean-up costs and must follow comprehensive fire prevention and spill reporting procedures. Performance is monitored through BMP implementation checklists and periodic inspections by the County or Forest Service. Proposals are due by September 23, 2026, and must be submitted in PDF format.
County Administration Office

POSTED

1 day ago

DEADLINE

in 11 days
View Details

More opportunities from Department Of The Interior → Montana State Office

Same awarding agency

NAICS: 238160
New
Federal
Z--MISSOULA FIELD OFFICE RENOVATION
Solicitation # 140L3626Q0048
The Department of the Interior, Bureau of Land Management (BLM) Montana State Office is soliciting quotes for a single-award, firm fixed price construction contract to renovate the Missoula Field Office Administrative Building in Missoula County, Montana. The project scope includes repairing sections of the clay tile roof, replacing the existing gutter system with 0.32 gauge aluminum k-style gutters, repairing or replacing moisture-damaged fascia and soffits, painting the building exterior including stucco repairs, and replacing the interior carpet. The estimated contract magnitude is between 250,000 and 350,000 dollars. This procurement is a total set-aside for small business concerns under NAICS code 238160. The contract requires performance to begin within 10 calendar days of the notice to proceed and be completed within 449 calendar days, with a general performance window extending through December 31, 2027. Award will be based on best value, with prior demonstrated experience weighted as significantly more important than price. Selected contractors must comply with prevailing wage determinations for Missoula County and provide a safety and quality control plan within 10 days of award. All payment requests must be processed electronically through the Invoice Processing Platform. The government emphasizes the importance of site visits to verify approximate quantities and local conditions before bidding.
Roofing Contractors

POSTED

4 days ago

DEADLINE

in 3 days
View Details
NAICS: 237110
Federal
Drainage System RestorationThe contract titled Drainage System Restoration pertains to the clear, repair, and reconstruction of culverts, ditches, and stormwater conveyance systems that have been damaged by debris and flooding. This work is essential to restore proper drainage function and mitigate future flooding risks in affected areas. The contract is classified as a subcontract under the NAICS code 237110, which corresponds to Water and Sewer Line and Related Structures Construction, indicating the specialized civil infrastructure nature of the tasks. The contracting agency is the Montana State Office under the Department of the Interior, suggesting the project is situated on federally managed lands or infrastructure. Although the solicitation number and detailed point of contact are not provided, the posted date of June 24, 2026, indicates this opportunity is in the planning or pre-award phase, and work will likely commence after contract award. The place of performance is not specified by city or state, but the involvement of the Montana State Office implies that all work will occur within the state of Montana. The absence of a set-aside designation suggests the subcontract is open to any qualified contractor without specific size or socioeconomic preferences. The task requires technical expertise in erosion control, hydraulic engineering, and heavy civil construction to effectively restore stormwater systems to their functional capacity.
Water and Sewer Line and Related Structures Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237990
Federal
Emergency Slope Stabilization and RepairThe contract titled Emergency Slope Stabilization and Repair seeks to address damage to road embankments and slopes caused by fire-induced erosion and storm runoff, focusing on immediate stabilization and long-term repair efforts to restore structural integrity and prevent further degradation. Work will involve assessments of affected areas, installation of erosion control measures, regrading of destabilized slopes, and implementation of vegetation or geosynthetic solutions to reinforce the terrain and minimize future vulnerability to weather events. The effort is urgent and tied to the preservation of critical transportation infrastructure within a region impacted by recent environmental disturbances. This subcontract falls under the NAICS code 237990 for other heavy and civil engineering construction and is administered by the Montana State Office under the Department of the Interior. The contract was posted on June 24, 2026, and is intended for performance in an unspecified location within Montana, with no defined place of performance details provided. There is no set-aside classification specified, and no point of contact information is listed, indicating that interested parties must follow the provided SAM.gov link for further submission guidelines and requirements. The work demands technical expertise in earthworks, slope stabilization, and erosion control under challenging post-fire environmental conditions.
Other Heavy and Civil Engineering Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS