This Government Contract opportunity was posted on January 23, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

10--Emergency Levee Repairs, PL84-99, City of Cascade Local Flood Protection Project

Awarded
W912EK-09-R-0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Lewis Park Improvements
Solicitation # 2026-IFB-222
The City of Pittsburgh Department of Public Works is soliciting bids for solicitation number 2026-IFB-222 to perform general construction improvements at Lewis Park in Hazelwood. The scope of work includes the construction of two basketball courts, a playground area, a pavilion, and greenspace, as well as associated demolition, earthwork, utility connections, and site restoration. Bids must be submitted electronically via the OpenGov Procurement Platform by November 16, 2026, at 2:00 pm, following a mandatory pre-bid meeting on November 2, 2026. The contract will be awarded to the lowest responsive and responsible bidder on a lump sum basis. Key requirements for bidders include the submission of a completed Schedule of Values, a W-9 form, and an Equal Opportunity Review Commission Participation Form demonstrating commitment to specific socioeconomic goals, including 18 percent MBE, 7 percent WBE, 5 percent VOSB, and 3 percent LGBTQIA+ participation. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price within ten calendar days of the award. All work must comply with Pennsylvania Prevailing Wage rates, ADA standards, and federal safety regulations. Payment will be made through monthly progress invoices, with the City endeavoring to provide payment within 45 days of approval. Final acceptance is contingent upon a pre-final inspection and the completion of a deficiency punch-list within 30 calendar days.
Public Works

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 237990
New
SLED
Guadalupe Light Rail Vehicle Wash Improvements
Solicitation # IFB C25134F
The Santa Clara Valley Transportation Authority is soliciting bids for the Guadalupe Light Rail Vehicle Wash Improvements project, identified as Contract C25134F. The scope of work involves the complete removal and replacement of the existing light rail vehicle wash system at Building F of the Guadalupe Division with a new hybrid drive-through and gantry wash system designed for 88.5-foot-long vehicles. The project encompasses comprehensive civil, trackwork, electrical, and plumbing improvements, including the installation of a prefabricated canopy, a new concrete slab, a wastewater collection trench, and a water reclamation system featuring reverse osmosis and softening capabilities. Work will be performed within an active rail yard, requiring strict adherence to safety and operational procedures to ensure the continuing function of the light rail system. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price, with an engineer's estimate ranging between 4.5 million and 5.5 million dollars. Bidders must be pre-qualified and submit their proposals electronically via the OpenGov portal by the final deadline of November 13, 2026. Key requirements include the provision of bid security equal to 5 percent of the total base bid price, as well as performance and payment bonds for public works. Because the project is federally funded, it is subject to Federal Transit Administration clauses, including Buy America requirements for steel and rolling stock over 150,000 dollars, prevailing wage rates, and mandatory registration with the California Department of Industrial Relations.
Construction Contracts

POSTED

about 6 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Butte Slough Outfall Gates Repairs, Sacramento River State Plan Flood Control Facilities
Solicitation # 26-10
Solicitation 26-10, Contract C51700, is issued by the California Natural Resources Agency, Department of Water Resources, for repairs to the Butte Slough outlet structure located at the confluence with the Sacramento River in Colusa and Sutter Counties. The scope of work includes selective demolition, the installation of steel piles and piers, and the replacement of the inlet catwalk. The contractor is responsible for installing seven Department-furnished slide gates and seven electrical actuators. Key operational requirements include managing in-water work, implementing dewatering and fish rescue plans, and adhering to a project-specific spill prevention, containment, and cleanup plan. The contract will be awarded to the lowest responsible bidder, with specific preferences available for certified small businesses, California companies, and Disabled Veteran Business Enterprises. Bidders must provide bid security via cash, check, or bond, and the successful awardee must furnish performance and payment bonds equal to the total bid amount. Compliance with various environmental permits is mandatory, including the Clean Water Act Sections 401 and 404 and the CDFW Lake and Streambed Alteration Agreement. Additionally, the contractor must employ a CDFW-approved Designated Biologist to oversee environmental compliance and conduct mandatory on-site education for all personnel. Bids must be submitted in sealed envelopes to the California Natural Resources Agency Headquarters in Sacramento by 2:00 P.M. on December 2, 2026.
California Natural Resources Agency, Department of Water Resources

POSTED

about 7 hours ago

DEADLINE

in 30 days

General Info

Agency

N/A

Contract Value

$138,748.84

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work involves 1. Construction of a rock fill haul road and working platform in the river along the eroded levee toe. 2. Shaping the river bank and existing levee slope as necessary. 3. Placing riprap on the river bank and levee slope including some reuse of the material from the working platform into the levee riprap layer. The estimated price range of the project is $25,000 to $100,000. The solicitation documents will be posted to www.fbo.gov on or about December 08, 2008. For site inspection please contact Ms. Barbara Lester, Area Engineer, Central Area Office, 5235 Grand Avenue, Davenport, IA 52807, telephone number 563/386-0572. Collect calls are not accepted.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS