Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on April 25, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rehabilitation of the Escapeways within the Lake Lynn Experimental Mine

Awarded
2008-B-06001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
6893
Solicitation # 49749
The Massachusetts Port Authority is soliciting proposals for the advance procurement, furnishing, and delivery of aviation electrical equipment for Logan International Airport in Boston, Massachusetts. The scope of work specifically requires the provision of L-868 Class IB stainless steel light bases (Size B, 12-inch diameter), as well as extensions, spacer rings, and 3/4-inch thick high-tensile machine steel flange rings with pavement dams. All equipment must comply with FAA Advisory Circulars 150/5345-53D and 150/5345-42K. Deliveries must be made to the Massport Central Stockroom no later than February 1, 2027, with a requirement for the supplier to provide at least seven calendar days of advance notice prior to shipment. Award selection is based on the best interest of the Authority, focusing on the responsiveness, capability, and responsibility of the proposer rather than solely on the lowest cost. As an Airport Improvement Program project, the contract is subject to extensive federal regulations, including Buy American preferences, Davis-Bacon wage requirements, and Civil Rights Title VI nondiscrimination assurances. Additionally, contractors must adhere to the Occupational Safety and Health Act of 1970, the Federal Fair Labor Standards Act, and specific prohibitions regarding certain telecommunications and video surveillance equipment. Proposers are required to submit unit pricing via Bid Express and provide necessary certifications regarding tax delinquency and felony convictions.
Massachusetts Port Authority - Goods & Services

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
SLED
Gonyea Playfield
Solicitation # 2026-MPW-244
The Gonyea Playfield project, solicitation number 2026-MPW-244, is a community park improvement initiative for Pierce County Parks and Recreation in Parkland, Washington. The scope of work includes the construction of an inclusive play area, a nature play area, basketball courts, a perimeter loop path, flexible lawn areas, and a comfort station. Additional requirements involve stormwater management, utility and right-of-way improvements, site furnishings, signage, and landscape enhancements. The project is estimated at 3,390,000 dollars for the base bid and 1,385,000 dollars for additive alternates, which include a picnic shelter, skate spot, roly poly, site irrigation/trees, and right-of-way work. The contract will be awarded to the responsible bidder with the lowest responsive bid. Bids were due by November 18, 2026, and must have been submitted via the OpenGov Procurement Portal with a 5 percent bid bond. The successful contractor is required to provide a 100 percent payment and performance bond. Performance timelines mandate substantial completion of all base and alternate bid work within 275 calendar days of the Notice to Proceed, with final completion and acceptance required within a total of 305 calendar days. Compliance requirements include adhering to Washington State prevailing wage laws and ensuring that at least 15 percent of labor hours are performed by apprentices. The contractor must follow strict safety and environmental protocols, including the Pierce County Hot Work Procedure, ADA requirements for walkways, and specific hazardous material handling and disposal procedures for asbestos, lead, PCBs, and mercury. Quality assurance is managed through a mandatory testing and inspection program, with the contractor providing three days' notice to the County before work is ready for inspection.
Parks and Recreation

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for Contract 9585, Project 13863, to perform channel improvements at Castle Creek in Warner Park, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening it from Sherman Avenue to Warner Lagoon. Key activities include the removal of concrete, native plant restoration, storm sewer improvements, and the potential removal, salvage, and reinstallation of existing bridges. The project is supported by a Pre-Disaster Flood Resilience Grant from the Wisconsin Department of Military Affairs totaling 1,842,719.55 dollars and requires compliance with permits from the US Army Corps of Engineers and the Wisconsin Department of Natural Resources. Bidders must be pre-qualified by the Board of Public Works, specifically in category 246 for Ecological Restoration if the prime contractor does not hold that qualification. The solicitation mandates a 12 percent Small Business Enterprise goal and requires a 5 percent bid bond. Proposals must include a lump sum bid and detailed unit prices submitted electronically via Bid Express by November 5, 2026. Award criteria are based on a best value determination, and the successful contractor must adhere to strict erosion control standards and a one-year guarantee for seeded areas. Construction is required to commence within seven calendar days of a written notice to proceed.
City of Madison

POSTED

about 15 hours ago

DEADLINE

in 1 day
NAICS: 237990
New
SLED
2027 Mass Trails Grants
Solicitation # BD-27-1020-DCRCU-DC250-135070
The 2027 MassTrails Grant Program, administered by the Massachusetts Department of Conservation and Recreation, provides capital funding for the planning, design, engineering, permitting, construction, and maintenance of recreational trails and shared-use pathways. Eligible applicants include municipalities, non-profit organizations, federally or state-recognized Native nations, and state and federal agencies. Funding is sourced from the Recreational Trails Program and Commonwealth Trails, with grant awards ranging from 5,000 dollars to 100,000 dollars for RTP projects and up to 500,000 dollars for high-priority regional shared-use path projects. All grants require a minimum local match of 20 percent. Applications must be submitted electronically by February 1, 2027, and include a detailed budget, project timeline, locus maps, and landowner permissions. Projects are evaluated based on their ability to connect communities, serve diverse and underserved populations, adhere to accessibility guidelines, utilize funds efficiently, demonstrate project readiness, incorporate safety measures, and provide high-quality recreational experiences. Awarded contracts typically span one to two years, requiring the full expenditure of costs and matches by the end date. Compliance requirements include adherence to the Standard Commonwealth of Massachusetts Terms and Conditions, the Americans with Disabilities Act, and Title VI of the 1964 Civil Rights Act. Federally funded projects must comply with the Build America, Buy America Act, though a waiver is available for projects not exceeding 500,000 dollars through August 16, 2028. Additionally, land acquisitions must follow the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970. Final funding approval is subject to review by the Secretary and the Governor, with RTP funds requiring further approval from the Federal Highway Administration.
Department of Conservation and Recreation

POSTED

about 15 hours ago

DEADLINE

in 3 months

AI Contract Overview

Show more

The Centers for Disease Control and Prevention awarded contract 2008-B-06001 for the rehabilitation of escapeways within the Lake Lynn Experimental Mine. The primary objective of this project is to enhance protection for personnel working underground by securing the mine roof and ribs. A central component of the work involves installing a 640-foot tunnel liner with backfill in an alternate escapeway to ensure permanent support and preserve the facility for future research purposes. To further ensure long-term viability and safety against roof falls, the project includes the installation of rock and cable bolts along with meshing across the roof and partially down the ribs and pillars. Additionally, shotcrete will be applied to necessary sections of both escapeways. This comprehensive structural reinforcement is designed to maintain the integrity of the mine regardless of future stability issues.

General Info

Agency

N/A

Contract Value

$2,970,850.82

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Darrin P BarberContract Specialist

Full Description

Show more
The Centers for Disease Control and Prevention (CDC) awarded a requirement for enhanced protection to the personnel working underground at the Lake Lynn Experimental Mine. This will be partially accomplished through the installation of a tunnel liner with backfill to the mine roof and ribs (walls). This tunnel liner will extend 640 ft into an alternate escapeway from just outside a portal. The tunnel liner will provide permanent support irrespective of future stability issues or developments and will meet the requirements of preserving the facility for future research needs. Enhanced personnel protection from roof falls and the long-term viability of the mine will also be accomplished through the installation of rock and cable bolts and meshing across the mine roof and partially down each rib/pillar (wall) and through the application of shotcrete in other needed sections of both escapeways.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS