This Government Contract opportunity was posted on September 27, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Repair Elk River Dam

Awarded
FA9101-07-B-0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the Pennsauken Community Pool Improvements project, solicitation number 2026-BID-15. The scope of work involves the rehabilitation, construction, and general improvement of the community pool, including site clearing, reinforced concrete flooring and wall construction, sandblasting the pool interior, and the installation of shade structures and electrical conduits. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction and comply with the Americans with Disabilities Act of 1990. The contract will be awarded to the lowest qualified responsible bidder. Bids must be submitted electronically via the OpenGov Procurement Portal. Per Addendum #01, the submission deadline is November 10, 2026, at 10:30 AM, and submissions must include a signed Acknowledgment of Receipt of Changes. Required documentation includes a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, and a Public Works Contractor Registration Certificate. The contract period is one year, with a possible one-year extension. Awarded contractors must comply with the New Jersey Prevailing Wage Act, mandatory affirmative action language, and provide a two-year maintenance bond. Payment is processed through the Township's governing body meeting cycle, contingent upon the submission of certified payrolls and itemized invoices.
Procurement

POSTED

about 11 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by Volusia County, Florida, to restore beach access at Seaview Avenue in Daytona Beach following destruction by Hurricane Ian. The project scope includes the demolition of damaged infrastructure and the construction of a new reinforced and unreinforced concrete vehicular ramp, a pedestrian sidewalk, curbing, and a composite sheet pile bulkhead with a concrete cap. The estimated construction cost is 1,213,413.00 dollars, with bids due electronically by November 5, 2026. Award will be granted to the lowest responsive and responsible bidder based on price, verified references, and demonstrated experience with similar projects. The project is subject to strict regulatory and technical requirements, including a Florida Department of Environmental Protection coastal construction permit that mandates specific protections for turtle nesting and lighting restrictions. Contractors must comply with FDOT traffic control standards, OSHA safety regulations, and federal provisions including the Davis-Bacon Act and E-Verify. Required deliverables include a payment and performance bond, comprehensive insurance coverage, and an as-built survey. Contract administration involves a 30-day payment cycle for undisputed invoices and a specific sales tax exemption procedure for materials. The County maintains the right to inspect all finished work, providing the contractor 20 days to remedy any punch list items before final acceptance.
Coastal

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the repair of the Elk River Dam at Arnold Air Force Base in Tennessee, structured into three distinct phases. The first phase focuses on painting Gate 1 along with related tasks. The second phase entails installing a new sluice gate bulkhead, rehabilitating the existing sluice gates, hoists, bonnets, embedded frames, and replacing hydraulic pumps, piping, and electrical controls. The third phase includes replacing the tainter gate motors, controllers, control system, gate chains, sprockets, and various electrical equipment. Each phase has a performance period of 180 calendar days, which may run either sequentially or concurrently. The total estimated contract value ranges from $1 million to $5 million, reflecting the comprehensive nature of the repairs needed to restore proper function and longevity to the dam's infrastructure. The solicitation, identified by number FA9101-07-B-0006, was posted in July 2007 with a NAICS code of 237990. For further information or clarifications, the point of contact is Alan N. Fudge, reachable by phone or email. The work location is at Arnold AFB, but specific address details are not provided.

General Info

Elk River Dam repair at Arnold AFB in three phases with $1-5 million budget.

Agency

N/A

Contract Value

$1,874,230

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A

Full Description

Show more
Repair Elk River Dam at Arnold AFB, TN--The work shall be accomplished in three phases. Phase I consists of painting Gate 1 of the dam and associated work. Phase 2 consists of providing a new sluice gate bulkhead and rehabbing the existing sluice gates, sluice gate hoists, bonnets, and embedded frames as well as replacing existing hydraulic pumps, piping, and electrical controls. Phase 3 will consist of replacing existing tainter gate motors, controllers, control system, gate chains and sprockets, and various electrical equipment. The performance period will be 180 calendar days for each phase, which may or may not run concurrently. The total estimated magnitude of work for all three phases is between $1,000,000 and $5,000,000.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS