Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from General Services Administration was posted on March 20, 2003. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Replace grating along window wells one xterior of building.

Closed
3PPE-BID-03-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

about 22 hours ago

DEADLINE

in 22 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids for the Corpyard Phase II project to structurally anchor 14 existing shipping containers at 4300 West Capitol Avenue. The scope of work requires a licensed contractor to provide all labor, materials, and specialized tooling to secure the containers to a cement-treated asphalt surface. Key technical requirements include drilling and hole cleaning, the installation of Bolthold asphalt substrate, securing ASTMA36 plates with epoxied steel rods, and performing AWS welding to the container framing. To prevent corrosion, all welded and anchored areas must receive a zinc-rich cold galvanizing rust-inhibiting coating. The project must be executed according to PSE stamped drawings and structural calculations, with final acceptance contingent upon inspection by the City's Building department and the project engineer. This solicitation, identified as ITB 26-091, has an estimated project value of 35,000 dollars. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, with the contract award scheduled for December 2, 2026. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory requirements include compliance with California prevailing wage laws, registration with the California State Department of Industrial Relations, and the provision of a 10 percent bid security. The successful contractor must also provide performance and payment bonds equal to 100 percent of the contract price and maintain comprehensive insurance coverage, including XCU hazards and general liability, naming the City as an additional insured.
Capital Projects - Construction

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This project involves the replacement of metal bar grating and supporting steel angles at the U.S. Custom House in Philadelphia, Pennsylvania. The contractor is responsible for fabricating and installing new grating and supporting angles according to NAAMM and ASTM standards, including the installation of stainless steel anchors and the application of specific industrial paint systems in black. The scope includes providing temporary covers for areaways during construction to maintain ventilation and public safety, as well as submitting a separate proposal for sealing off a decommissioned ash lift elevator on 2nd Street. Work must be performed during normal business hours, Monday through Friday, with the contractor providing a detailed installation schedule and managing all site cleanup. Due to the government facility location, all personnel must undergo background suitability checks and obtain proper security clearances and identification badges prior to starting work. Bids must be comprehensive, covering all labor and materials, and must include Material Safety Data Sheets and a detailed project timeline.

General Info

Replace metal grating and steel angles at Philadelphia U.S. Custom House per standards.

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

U.S. Customs House200 Chestnut Street Philadelphia, PA Note: The correct Phone# and Fax# for Edna Dandy is P#215-861-3400 &, PA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R3 Philadelphia Field Office
Contacts1 person available
OfficePHILADELPHIA, PA, 19106, USA
Office AddressPHILADELPHIA, PA, 19106, USA
Contacts
Edna J. DandyProcurement Technician

Full Description

Show more
SCOPE OF WORKMid-Atlantic Region: PBS-Philatlantic Realty Services District 100 Penn Square E. - Room 613: Philadelphia, PA. 19107-3396 I. PROJECT IDENTIFICATION A. IDENTIFICATION Project Title: Metal Bar Grating Replacement Building: U. S. Custom House Location: 200 Chestnut Street Philadelphia, PA. 19106 Building Number: PA0144ZZ Project Number: RPA-00000 B. OVERVIEW AND SCOPE Replace existing bar grating at areaways, within the building's perimeter, indicated on Drawings. Replace existing supporting steel angles. Provide new anchor studs and nuts to support steel angles. Fabricate all components in the shop. Immediately upon removal of the existing grating, temporarily cover the existing areaways with approved grating or other similar approved material assemblage that has openings to permit continued building ventilation while protecting the public and preventing access to the areaways. Obtain approval of shop drawings and catalog cuts for all components prior to fabrication. Dimensions shown on Drawings are approximate. As part of this work the contractor will submit a proposal for the ash lift elevator on 2nd street. The elevator is no longer in use and can be sealed off. The contractor will submit a detailed description of how they will accomplish this. II. PROFESSIONAL SERVICES A. REPLACEMENT AND RELATED WORK In accordance with Specification Section 05500 - Replace existing metal bar grating, supporting angles and anchor bolts at locations shown on Drawings. Remove or cut existing anchor bolts flush with wall surface. Fill holes where anchors are removed with non-shrink grout. Provide new steel grating and supporting steel angles at the same locations as existing. Verify dimensions indicated on Drawings prior to fabrication. New grating and installation shall conform to National Association of Architectural Metal Manufacturers Metal Bar Grating Manual (ANSI/NAAMM MGB 531-93), Type R-18-7 (1-1/4 x 3/16). Attach each grating panel to supporting ASTM-A36 steel angles with new steel saddle clips, bolts, tamper-resistant nuts and washers at each corner of panel. Provide - in diameter, stainless steel, chemical or expansion anchors, nuts and washers at 2-0 o/c. in vertical leg of supporting angle. Do not install anchors in existing holes. Thoroughly clean drilled holes prior to installation of anchors. Anchors shall be capable of resisting a shear force of 1200 pounds with a safety factor of 4 as determined by testing per ASTM-E488 conducted by a qualified independent testing agency. Expansion anchors shall meet Federal Specification FFS-325. Chemical anchors shall conform to ASTM-C881. Conduct 1,000 pound pullout tests on two anchors selected by the Contracting Officer. Failure of either or both anchors will result in a requirement to test all anchors. Any anchor that fails the - pull-out test will be required to be replaced at an adjacent location. Provide 2-0 wide access grates with three steel hinges and hasp at locations indicated on the plan. Where irregularities in the existing wall prevents flush mounting of steel angles, fill spaces between angles and wall with non-shrink grout. Submit for Contracting Officer approval product information for grating, saddle clips, angles, and paint. Submit shop drawings for approval showing layout and configuration of new grating and angles. B. PAINTING Prepare metals, after fabrication to receive shop coatings in full accordance with manufacturer's recommendations and with SSPC-SP6, - Commercial Blast Cleaning, requirements. Paint all metals in shop using one of the following paint systems: 1. Tnemec Co. Inc. - 90E92 Tnemec-Zinc with minimum thickness of 3.0 dry mils, with a topcoat of - Series 66 Hi-Build Epoxoline with minimum thickness of 5.0 mils. 2. Ameron - Dimetcote 3 with minimum thickness of 3.0 dry mils, with a topcoat of - Americoat 66 with minimum thickness of 5.0 dry mils. 3. Carboline Co. - Carbozine # 11 minimum thickness of 3.0 dry mils, with a topcoat of - 190B Hi-Build Epoxy with minimum thickness of 5.0 dry mils. The color of the topcoat shall be black as approved by the Contracting Officer. Submit color samples for Contracting Officer selection of color and gloss. Repair all damaged painted surfaces after installation of new grating. III. ADDITIONAL REQUIREMENTS AND CRITERIA A. HOURS OF WORK All work will be completed during normal building operating hours. Normal operating hours defined as Monday through Friday, 7:00 A.M. to 5:00 P.M., except for Federal Holidays. Before starting project, the Contractor shall submit an installation schedule for the Project Manager/COR's approval. During the project, the Project Manager/COR reserves the right to adjust the installation schedule for the convenience of the Government. General: All work will be completed during normal building hours Contractor will also perform any necessary clean up to maintain a safe passage way. This includes but not limited too, removing any debris, & sweeping any area affected by their work. Contractor is responsible to provide any cleaning equipment that is deemed necessary to clean work area. A list of the areas where the work needs to be completed is attached, the measurements are approximate, and are not recommended to be used for your estimate. A walk through will be conducted on March 31st, 2003 at 10:00am, at that time the contractors should take their own measurements. Contractors can also set up times for other site visits if necessary. Security Measures: SECURITY CHECKS: If your contract requires that contractor employees will be on site at a government facility on a recurring basis, or for an ongoing period of time, background suitability checks are required as specified in this section. If contractor's employees will be working at the government facility on a short term (1 day, intermittent or non-recurring) basis and for whom a government-approved escort can be provided, background suitability checks are not required. Verify this requirement with the Contracting Officer. Note: an approved escort shall be a government employee assigned by the responsible contracting office. FPS will not furnish escorts. I. SECURITY REQUIREMENTS II. CLEARANCE OF PERSONNEL (1) Submission of Forms. Unless otherwise specified, to obtain clearances for personnel, the contractor shall submit to the COR, no later than fourteen (14) days prior to the starting date of the contract, one (1) completed forms FD?258, "Fingerprinting Charts", and one (1) GSA Form 176, "Statement of Personal History, for those officers of the firm, who for any reason, may visit the work site during the period of this contract and for all employees who will require access to the building in performance of the contract work. These forms shall be submitted for replacement employees fourteen (14) days before entrance on duty. The Government shall furnish necessary forms. NOTE: Initial security clearance checks may take longer than 14 days. Plan accordingly. (2) Unsuitable Employees. If the Contracting Officer receives an unsuitable report on any employee after processing of these forms, or if the COR finds a prospective employee to be unsuitable or unfit for his assigned duties, the contractor shall be advised immediately by the Contracting Officer that such employee cannot continue to work or to be assigned to work under the contract. The contractor must then take action to remove the employee from the GSA contract. (3) Criteria for Eligibility. The principal factors used in the adjudication process in determining whether a person's conduct would be expected to interfere with the ability of the applicant(s) to function in the position, or if the applicant's past conduct was such that the safety of Federal employees and/or visitors to delegated an/or GSA-controlled facilities would be in jeopardy, are outlined below: (a) Any type of misconduct or negligence in prior employment which would have an effect on the quality of security and protection provided to customer agencies, or prior conduct which would interfere with and/or prevent a Federal agency from carrying out its operational responsibilities; (b) The following crimes are acts, which could disqualify prospective or regular employees: - Abuse or neglect of a child or other dependent person entrusted to their care - Child molestation - Forcible or statutory rape - Possession and sale of narcotics and/or dangerous drugs - Arson - Murder - Kidnapping - Robbery - Burglary - Larceny - Theft - Aggravated assault - Buying, receiving or possessing stolen property - Embezzlement, forgery, counterfeiting - Fraud - Under ATF Standards, any felony (for guards only who are required to carry firearms). - Falsifying a personal history application (4) Prior Clearance. Employee clearances obtained through this process are valid for a period of five (5) years. When such prior clearances are due to expire within the performance period of the contract, contractors are responsible for timely resubmission of all information necessary to apply for a new clearance. (5) Government Control. The Government shall have and exercise full and complete control over granting, denying, withholding or terminating clearances for employees. The Government may, as it deems appropriate, authorize and grant temporary clearance to employees of the contractor. However, the granting of a temporary clearance to any such employees shall not be considered as assurance that full clearance will follow as a result of condition thereof, and the granting of either temporary or full clearance shall in no way prevent, preclude or bar the withdrawal or termination of any such clearance by the Government. III. IDENTIFICATION/BUILDING PASS (1) Issuance of Passes. The contractor shall see that every new employee has a GSA/contractor identification/building pass before the employee enters on duty. GSA personnel, designated by the COR, shall furnish and fill out these passes using GSA Form 15, "Building Pass". The contractor and the COR, or the designated representative of each, shall sign each pass issued. All passes must contain an expiration date. (2) Contractor's Responsibilities. The contractor shall see that all employees carry their passes with them during hours and show them upon request. The COR or other GSA personnel designated by him shall periodically verify passes of contractor employees with their personal identification. The contractor shall also see that all passes are returned to the COR as his employees are dismissed or terminated, and when the contract expires. (3) Photo Identification. The contractor shall make his employees available for photo identification badges, when required by the Government, on a schedule to be worked out with the COR. The badges will be made by the Government after a favorable security report has been received on the contractor employees. GSA personnel will take the picture and furnish the equipment and material to make the identification badges. Contractor employees shall sign each badge at the time of photographing. The contractor shall issue the badges to the employees each day as they report for work and shall collect the badges at the end of the work shift before the employees leave the building. The contractor shall see that all badges are returned to the COR when employees are dismissed or terminated. The contractor will notify the COR when the employee badges are lost. It will be the responsibility of the contractor to pay for replacement badges at the rate of $2 per badge. NOTE: The use of the photo?identification badges will be at the option of the Government and may be used in lieu of the GSA Form 15, "Building Pass", as described in Paragraph B.(1) above. Submission of Bids: As part of the bid the contractor will supply the information as requested below: A) Cost will include all labor, supervision and materials to complete work. B) Contractor will include all Material Safety Data Sheets (MSDS) for any materials to be used. If there is a change in the materials to be used, between the dates the bids are due and the start of work, the contractor is responsible to furnish to GSA, new MSDS, three (3) working days prior to start date. This will have no effect on the completion date. C) Contractor will submit a detailed schedule for the work. Schedule will include at a minimum start & completion dates, dates, times, and location of work to be accomplished. Custom House Grating Dimensions 1) 143 X 561/2 1A) Access gate 29 X 39 2) 806 X 741/2 2A) Access gate 29 X 39 2B) Curved window guard 60 X 14 2C) Curved window guard 60 X 10 2D) Curved window guard 60 X 7 2F) Curved window guard 60 X 3 3) 658 X 731/2 4A) Access gate 29 X 39 4B&C) Each section 33 X 48 4) 143 X 561/2 5A) Access gate 29 X 39 6) 144 X 60 7,8,9,10) Each section is approximately 72 X 48 7A,8A,9A,10A) Are access gates approximately 24 X 48

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS