Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from General Services Administration was posted on April 20, 2005. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Replacement of seven overhead roll up doors.

Closed
3PPE-05-BID-002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia, with potential associated upgrades to Buildings 261 and 263. The scope of work includes comprehensive interior finishes such as replacing corridor and classroom flooring with LVP and carpet tiles, repainting walls to a level 4 finish, and updating signage. Technical upgrades involve renovating restrooms with new vanities and lavatories, installing raised flooring with integrated electrical distribution in classrooms, and replacing variable air volume systems and lighting controls. The project is a Firm Fixed Price contract with a performance period of 425 calendar days, scheduled from January 11, 2027, to March 11, 2028. Award will be determined using a best suited then negotiate methodology, evaluating past performance from the last five years, corporate relevant experience, and price fairness. Offerors must provide payment and performance bonds, and a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the facility's nature, personnel must undergo background checks, including FBI fingerprinting and DHS non-disclosure agreements, and comply with strict security and safety protocols. Proposals must be submitted by November 18, 2026, and include a detailed cost breakdown via Exhibit A, signed Standard Form 1442, and required past performance questionnaires.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements involve reconfiguration, new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements including paving, drainage upgrades, and hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. The award will be based on the lowest price. Key administrative requirements include compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds. Invoicing is conducted monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30 and must be certified by a Quality Control Manager.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 24 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under the Recharge Master Plan Update. The solicitation is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The response deadline for this opportunity is November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to comprehensive Good Faith Effort (GFE) requirements that expand upon State Water Resources Control Board standards. Critical mandates include providing proof of online solicitation postings for 30 consecutive calendar days and a print newspaper posting for at least one day prior to the bid opening. Additionally, bidders must submit evidence of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA) within their bid package. While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, all other GFE certifications must be completed before the bid opening.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Bidding is open to various small business designations and covers a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, and plumbing. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive bid documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, following a fire sprinkler discharge. The project requires the full restoration of the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring and rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory pre-bid site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of compliance with the latest Wage Rate decisions. Administrative requirements include Net 30 payment terms and a one-year guarantee of workmanship upon substantial completion. The contract is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. The project is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting, along with the temporary removal and re-installation of HVAC equipment. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method description covering project phasing and occupied-building protection, and itemized pricing by room and trade. Financial requirements include providing payment and performance bonding for the full project value, as well as general liability insurance with a minimum of 1 million dollars per occurrence and 3 million dollars general aggregate, all due within ten days of award. The contractor is responsible for all testing of restored mechanical, plumbing, electrical, and life-safety systems, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. Performance is scheduled to occur between February 1, 2024, and March 31, 2024.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. The infrastructure scope covers primary and secondary electrical distribution, telecommunications, outside lighting, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and access necessary documentation.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in about 15 hours

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

U.S. Custom House2nd & Chestnut Street Philadelphia, Pa 19106, PA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R3 Philadelphia Field Office
Contacts2 people available
OfficePHILADELPHIA, PA, 19106, USA
Office AddressPHILADELPHIA, PA, 19106, USA
Contacts
Karen M. SimsSup. Realty Services Specialist
Alan M PeekConstruction Representative

Full Description

Show more
Custom House Roll-up Door SOW General: The contractor shall provide all labor, material, and supervision and equipment necessary to: Replacement of seven overhead roll up doors, located at the loading dock of the U.S. Custom House at 200 Chestnut St., Phila. PA 19106. Contractor will furnish and install new steel roll up doors, on the seven loading dock doors, including wiring for operation, and all painting of metal or concrete surfaces as applicable. Project will be constructed under a general construction contract. Description of work: The project consists of removing seven existing steel roll-up doors at the loading dock of the building, and installing new roll-up doors, matching existing doors in size and style. All doors are located on the south side of the building, and are standard type roll-up doors, with steel slats, steel side rails and chain driven overhead motors. All parts, components and attachments of existing doors are to be removed. All electrical wiring, and devices shall be removed up to and including the safety disconnect. All doors shall be equipped with sensing devices to prevent and doors from closing on vehicles or pedestrian traffic. All doors must be capable of being opened manually in the event of mechanical failure, or loss of power. All materials and equipment to be used as part of this work will need to be readily available so as to prevent any stoppage of work. All work shall be performed on consecutive days from beginning through completion, excluding holidays and weekends. Contractor shall work with all federal agencies who will be using the garage door, in area where work in being conducted. All electrical controls, disconnects, and junction boxes are to be located inside the loading dock areas. All areas must be secured at end of business day. Dock doors must be removed and new installed, in order to close building. Doors need not be operational in one day, but must be secured. Doors not operational in one day must be operational before another door is non-operational. Use of Premises & Hours of Work: Limits - Confine construction operations to the loading dock area. The contractor shall limit his use of the premises to the work indicated, so as to allow for Government occupancy and use. Confine operations at the site to the areas permitted under the contract. Portions of the site beyond areas on which work is indicated are not to be disturbed. Conform to site rules and regulations affecting the work while engaged in project construction. Contractor cannot use the existing building. Repair and all damage caused by construction operations to Government and other property. Exercise extreme care and take all necessary measures throughout the progress of the work to avoid damage to existing buildings or grounds, or work performed by others. In the event of any such damage, he shall repair and make good such damage, as directed, to the satisfaction of the contracting officer. Take all precautions necessary to protect the building, site, and occupants during the construction period. Difficulties of working in an existing operational building center are recognized; however, the contractor must cooperate to keep noise and other interference's to a minimum. Housekeeping shall be such to assure no disruption of the Government's operations. All work shall be completed during normal working hours. Normal working hours are defined as Monday through Friday, 6:00 A.M. to 6:00 P.M., except Federal Holidays. Before starting project, the contractor shall submit an installation schedule for the COR's approval. During the project, the COR reserves the right to adjust the installation schedule, for the convenience of the government. Owner will occupy site and existing building during the entire construction period. Cooperate with the owner during construction operations to minimize conflicts and facilitated owner usage. Perform the work so as not to interfere with owner operations. Project management and coordination: Coordinate construction operations included in various sections of the specifications to ensure efficient and orderly installation of each part of the work. Coordinate construction operations, included in different sections that depend on each other for proper installation, connection, and operation. 1. Schedule construction operation in sequence required to obtain the best results where installation of one part of the work depends on installation of other components, before or after its own installation. 2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair. 3. Make adequate provisions to accommodate items scheduled for later installation. Schedule a pre-construction conference before starting construction, at a time convenient to owner, but no later than 15 days after notice to proceed. Hold conference at project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments. Discussions shall include but are not limited to: a. Tentative construction schedule. b. Phasing. c. Critical work sequencing. d. Designation of responsible personnel. e. Distribution of the contract documents f. Submittal procedures g. Use of the premises. h. Responsibility for temporary facilities and controls i. Parking availability j. Work, and storage areas k. Equipment deliveries and priorities l. First aid m. Security n. Progress cleaning Submit two printed copies of initial schedule, one a reproducible print and one a blue-or black-line print, large enough to show entire schedule for entire construction period. Submit two copies of any and all field reports at time of discovery of differing site conditions. Include a detailed description of the differing site conditions, together with recommendations for changing the contract documents. Product Requirements: Provide products that comply with the contract documents, that are undamaged and unless otherwise indicated, that are new at time of installation. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect. Instruct owner's personnel in operation, adjustment, and maintenance of products, equipment and systems. Electrical: Work will include the all necessary electrical wiring, including switching and controls for a complete installation. Contractor shall also be responsible to remove existing security devices, and reinstall them to new door, as same location. Contractor will be responsible to assure that this system is in operation when door becomes operational. Four roll-up doors are operated by door switches, and remote switching. Contractor will replace all conduit and wire at doors, up to and including the service disconnect. Contractor will also replace the remote switches but not the conduit and wire for their operation. Contractor shall label each door and corresponding door switch. Three roll-up doors are operated by door switches, only. Contractor will replace all conduit and wire at doors, up to and including the service disconnect. All service disconnects shall be fused type. Workmanship: All work shall be coordinated and scheduled with the Contracting Officer (CO.) or his/her representatives. The CO. or his/her representatives have the right to reject any unsatisfactory or unsuitable materials, or workmanship. Any damage caused by the contractor to the building, any of its contents or tenants shall be the responsibility of the contractor to correct in a timely manner. All work shall be accomplished in accordance with the best practices of the trade. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Contracting officer will either proceed with inspection of notify contractor of unfulfilled requirements. Contracting officer will prepare a final certificate for payment after inspection or will notify contractor of construction that must be completed or corrected before certificate will be issued. Request re-inspection when the work identified in previous inspections as incomplete is completed or corrected. All roll up doors shall be checked for proper operation prior to final inspection by the CO or his or her representatives. Inspections maybe performed by the CO or his/her representatives at any time during installation. Final inspection will be made to assure proper operation, by the CO or his/her representative before final acceptance and payment will be granted. Warranty: Contractor shall submit written warranties of request of contracting officer for designated portions of the work where commencement of warranties other than date of substantial completion is indicated. Organize warranty documents into an orderly sequence. Bind warranties into vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8 x 11 inch documents. The contractor shall furnish a one-year warranty on each door. Debris Removal/Cleaning: All debris generated during the implementation of the contract shall be the removed from the work site and disposed of on a daily basis. All debris shall be removed form the Government property at the expense of the contractor. The work area shall be cleaned on a daily basis. If contractor decides to bring in a dumpster to be used for debris removal, the dumpster size shall not exceed 20 cubic yards (70'x96'x16). Contractor shall be at site at time of delivery to accept dumpster and set dumpster in area, as instructed by GSA. Contractor shall also notify GSA Project Manager 24 hours before dumpster is to be delivered. Contractor shall provide name of dumpster company, time dumpster is to be delivered, and duration time dumpster will be on site. Provide final cleaning, conducting cleaning and waste removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. Complete the following cleaning operations before requesting inspection for certification of substaan8tial completion for entire project of for a portion of project: - Clean project site, yard, and grounds in areas disturbed by construction activities, including landscape developments areas, of rubbish, waste material, litter, and other foreign substances. - Sweep paved areas broom clean. Remove spills, stains and other foreign deposits. - Rake grounds that are neither planted nor paved to a smooth, even textured surface. - Remove construction equipment and surplus material from project site. - Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains. - Remove debris and surface dust from limited access spaces. - Removed labels that are not permanent. - Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired of restored. Health and Safety: All work shall comply with the applicable requirements of 29CFR 1910/1926 and 40CFR 761. All work shall comply with applicable state and municipal health and safety requirements. Where there is a conflict between applicable regulations, the most stringent will apply. The contractor shall provide all necessary safety equipment and ensure that such equipment and safety procedures are adequated for the job being performed and utilized properly. Start date and completion date: Start date for project shall be within 45 days from Notice to proceed. Completion date is 120 days from start date. Pre-bid meeting will be held on May 12th, 2005 @ 10:00 am Meeting will be held in the GSA Field Office in the: U.S. Custom House 200 Chestnut St. Suite 222 Phila. PA 19106 Bids can be sent to: William J. Green FOB 600 Arch St. Suite 4200 Attn: Karen Sims Phila. PA 19106 Bids are due: May 26th, 2005 @ 2:00 pm Direct inquires to Alan Peek @ +1 (555) 000-0000

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS