Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on September 11, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Response to Questions

Awarded
W912C3-06-B-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 8 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
Request for Qualifications for Trade Contractors for 158 Spring Street - ROOFING AND FLASHING ONLY
Solicitation # COC-RFQ-FY27-31162RF
The City of Cambridge is seeking prequalified Trade Contractors for roofing and flashing services as part of a comprehensive renovation of the former Kennedy-Longfellow School, a 101,590 square foot structure located at 158 Spring Street. This procurement is conducted under M.G.L. c.149A Construction Management at Risk, with the specific roofing and flashing trade estimated at 55,571.00 dollars. The overall project duration is approximately 12 months from the notice to proceed. The selection process consists of two phases, beginning with a prequalification phase where firms must submit a Statement of Qualifications (SOQ) via the City's e-Procurement Portal by November 12, 2026. To be eligible for the subsequent bidding phase, firms must achieve a minimum total score of 70 points, with specific minimums required in references and project capacity categories. Mandatory requirements include a valid DCAMM Sub-bidder Certificate of Eligibility, a commitment letter for payment and performance bonds at 110 percent of the estimated contract value, and a 10-hour OSHA-approved safety certification. Applicants must submit a comprehensive package including Trade RFQ Form 1 prior to the SOQ application, along with various schedules detailing business ownership, management personnel, five years of similar project experience, and a three-year workers compensation modifier history. Additional compliance mandates include adherence to the Cambridge Employment Plan, the Responsible Employer Plan, the Living Wage Ordinance, and Minority Business Enterprise programs. All submissions must be electronically filed, and any packages received after the deadline will be rejected.
Capital Buildings Projects

POSTED

about 15 hours ago

DEADLINE

in 13 days

General Info

Contract Value

$131,776

NAICS

238160 - Roofing Contractors

Place of Performance

ARCC Fort Buchanan Directorate of Contracting Bldg. 399, 218 Brooke Street, Fort Buchanan PR 00934-7000, PR

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Fort Buchanan (rc)
ContactsNo contacts available
OfficeFORT BUCHANAN, PR, 00934-4572, USA
Office AddressFORT BUCHANAN, PR, 00934-4572, USA
ContactsNo contact information available

Full Description

Show more
RESPONSE TO QUESTIONS  SOLI CITATION W912C3-06-B-0004 1. The work hours specified in the contract are M-F 6am to 12m. Is there any possibility of also working Saturdays and Sundays? Answer: The contractor can work on Saturdays and Sundays after proper coordination. 2. How many inches of lightweight are required for the new drainage slopes at their top elevations? Answer: Section 1.3.1.1. b  Contractor shall Modify roofing system to correct this situation (deficient roof drainage). i.e. the contractor shall determine the height needed to achieve the slope required for proper drainage. Construction specs seem to indicate the use of hot asphalt. Could you please specify whether it is hot or cold applied asphalt? Answer: Cold asphalt is a preferred alternative. 3. Given the climate conditions of PR, we are very sensitive and prone to sudden rainfall at any time during work hours. Even taking the necessary precautions, there is no way to avoid water in the metal deck from filtering down into the spaces. We could p rotect the equipment down below with polyethylene covers, but that still leaves open the possibility of damaged ceiling tiles. Should we add a provisional sum in case that these are affected or should that be dealt directly with the Contracting officer aft er the contract is awarded? Answer: Refer to paragraph 1.32 in the SOW. 4. According to Section 01110 part 1.11 all shop drawings will be submitted for approval after contract is awarded, before fabrication. Is this correct? Answer: Paragraph 1.11 states: after award of the contract, and before procurement of fabrication; submit to the Contracting Officer, all the shop drawings. 5. Can we have the make and model of the A/C that is to be lifted in order to determine the amount of weight, and necessary equipment to perform the work? Answer: A/C is a McQuay Package Unit, Model No.: LCA-360-HN2Y, 30 Tons

More opportunities from Department Of Defense → W6QM Micc-Fort Buchanan (rc)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS