Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Agriculture was posted on September 16, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Restoration of Hurricane-Damaged CCC Log Shelters at Ratcliff, Boykin Springs, and Double Lake Recreation Areas

Awarded
Federal
Submission Closed
Solicitation #
RFP_AG-447U-S-06-0105LI

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
This Design-Build Major Maintenance and Repair (M&R) project for US Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin, is a firm fixed-price task order issued under the NMACC III IDIQ. The project is estimated between $5 million and $10 million with a projected period of performance of 350 calendar days. The scope of work includes base requirements for remodeling the Sector Command Center, building envelope repairs, and HVAC reconfiguration, with optional work items for roof and boiler replacement at the Station/UPH Building. Technical requirements encompass architectural remodels of the first and second floors, electrical power and lighting updates, fire alarm system installation, and mechanical demolition and installation compliant with International Building and Plumbing Codes. The contract is awarded to the lowest total priced responsive offeror, with proposals due by December 17, 2026. Key administrative requirements include the submission of performance and payment bonds within ten business days of award and adherence to the Davis-Bacon Act wage determinations for the Milwaukee area. Due to the nature of the facility, contractors must comply with strict physical security and force protection programs, including valid security clearances for personnel handling classified information and restrictions on portable electronic devices in classified work spaces. All invoicing must be processed through the Invoice Processing Platform.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with composite modular materials and carpet tiles, fully renovating restrooms with new lavatories and vanities, and updating doors and life-safety components. Technical upgrades involve installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation equipment, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting interior surfaces and installing new signage throughout the facility. This solicitation, number 70LGLY27RSSB00001, is a total small business set-aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by December 2, 2026, and must be submitted electronically to the Contracting Officer. Award evaluation is based on price, past performance, and corporate relevant experience, with non-cost factors holding equal importance to price. The contractor is required to provide performance and payment bonds and must adhere to the Davis-Bacon Act and ADA accessibility guidelines.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope repairs, new roofing, exterior wall systems, and interior reconfiguration. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project involves site improvements such as paving, drainage upgrades, water and sanitary system repairs, and hazardous materials abatement. The estimated contract value is between $10 million and $25 million, with a completion period of 730 days. The project is divided into two primary line items: ELIN 0001 for building renovation and ELIN 0002 for the removal and replacement of paving. Proposals are due by December 2, 2026, and the award will be based on the lowest price. Bond requirements vary by proposal value, with those exceeding $150,000 requiring bid, payment, and performance bonds. Key personnel requirements include a stand-alone Quality Control Manager, while the Superintendent and Site Safety and Health Officer roles may be combined if the individual is qualified for both. The contract mandates compliance with ADA/ABA accessibility guidelines, OSHA safety requirements, and the Davis-Bacon Act. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, issued by NAVFAC Northwest ROICC Kitsap, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The scope of work involves addressing Risk Assessment Code Level 4 (RAC-4) deficiencies, specifically extending fire sprinklers to the loading dock platform, securing and monitoring sprinkler control valves in basement elevator pits, and installing missing backflow preventers on the north and south 6-inch diameter wet pipe sprinkler system risers. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials, labor, supervision, and performance testing for a complete and usable system. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm-Fixed-Price structure and an estimated magnitude between $1 million and $5 million. The period of performance is 440 days from the award of the task order. Award selection is based on price and MACC past performance. Key requirements include adherence to Unified Facilities Guide Specifications (UFGS), cybersecurity standards per UFC 4-010-06, and strict hazardous material labeling and disposal protocols. Proposals must be submitted via the PIEE portal, with a final deadline extended to December 16, 2026.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to have a construction magnitude between $10 million and $25 million. The scope involves a critical two-phase execution where the facility must remain operational and mission-capable between phases, requiring strict scheduling and multiple mobilization and demobilization cycles. Phase 1 encompasses all work not included in Phase 2, including the completion and approval of all design documents for both phases. Phase 2 focuses on the installation of new building equipment, including the replacement of a 40-ton bridge crane and the installation of a prefabricated paint booth in the High Bay area. Additional work includes demolition, HVAC, fire protection, electrical upgrades, and the construction of a 400 square foot addition for forklift battery charging. The contract is awarded based on price and MACC past performance. Key requirements include compliance with EM 385-1-1 safety standards, International Building Code, and various cybersecurity and CMMC Level 1 requirements. The contractor must utilize the Wide Area Workflow (WAWF) system for invoicing and provide electronic Davis-Bacon Act certified payrolls. Performance and payment bonds are required, and the project involves a multi-stage inspection process including preliminary, acceptance, and final inspections. Proposals are to be submitted via the PIEE portal, with the final deadline for submission specified as December 7, 2026, at 11:00 am local time.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of the 1963 LBJ Dorm at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is designated as a Small Business set-aside, including SBA certified VOSB, SDVOSB, WOSB, and HUBZone SB. The scope involves replacing a roof with persistent leaks, requiring the contractor to perform a visual inspection and adhere to national, state, and local building codes, as well as EPA and OSHA regulations. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM, and proposals must be submitted to Tammy Swallows by December 14, 2026. The contract is a single lump sum award based on best value, evaluated through a 100-point system focusing on price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include a valid Indiana Contractor's License, Davis-Bacon Act wage rate certification, and specific insurance coverages, including automobile liability and workers' compensation. Once a Notice to Proceed is issued, the contractor must provide a sequenced construction schedule within 10 days and begin work within 14 days. The project includes a one-year workmanship guarantee and a two-year manufacturer's product warranty, with payment terms set at Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is for a single lump sum contract to remove and replace damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with local, state, and federal building codes, while reusing existing push bars and closure systems. All work must adhere to current EPA and OSHA regulations, and the contractor must provide a one-year guarantee of workmanship and manufacturer product warranties. The contract is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is required on December 1, 2026, and proposals are due by December 11, 2026. Award will be based on best value, evaluated on a 100-point scale covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must provide a detailed cost breakdown, a timeline for substantial completion, proof of a valid Indiana Contractor's License, and a W9. Insurance requirements include automobile liability and workers' compensation, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30, and the contractor must start work within 14 days of proposal acceptance.
Atterbury Job Corps – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

This project involves the restoration of three hurricane-damaged Civilian Conservation Corps log shelters located at the Ratcliff, Boykin Springs, and Double Lake Recreation Areas within the Angelina, Davy Crockett, and Sam Houston National Forests. The scope of work includes the demolition and removal of damaged components to facilitate the repair and reconstruction of foundations, log walls, structural log trusses, log columns, and roof systems. Due to the nature of the structures, certain elements of the project require coordination with and approval from the Texas State Historic Preservation Office. The government estimates the cost of the project to be between 100,000 and 250,000 dollars, with one or more buildings potentially listed as optional items based on funding availability. This contract is open for full and open competition under NAICS code 236220. Qualified contractors must be registered in the Central Contractor Registry and the Online Representations and Certifications database. Additionally, the successful bidder is required to provide a bid bond as well as payment and performance bonds in accordance with FAR regulations.

General Info

Contract Value

$282,065.29

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

MS, USA

Set-Aside

NONE

Award Issued Date

Potential End Date

May 1, 2008

Documents

2
ZIP
ZIP

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 21 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 24, 2006 to Aug 28, 2006. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → National Forests In Mississippi
Contacts1 person available
OfficeJACKSON, MS, 39213, USA

Full Description

Show more
DESCRIPTION: This project consists of the restoration of three hurricane-damaged Civilian Conservation Corps (CCC) Log Shelters at Ratcliff, Boykin Springs and Double Lake Recreation Areas. The project includes, but is not limited to, the demolition and removal of existing components as necessary for the repair and reconstruction of existing damaged roof systems, log walls, foundations and structural log trusses and log columns. Some elements of the contract will require coordination with and approval by the Texas State Historic Preservation Office (SHPO). One or more of the buildings may be solicited as an Optional Item, with award being dependent upon the availability of funding. GOVERNMENT COST ESTIMATE: Between $100,000 and $250,000. LOCATION: Angelina, Davy Crockett, and Sam Houston National Forests, National Forests & Grasslands in Texas. SITE VISIT: The date, time and location of a formal site visit, if scheduled, will be in the solicitation that will post to this site. CONTRACTOR QUALIFICATIONS: Contractor must be registered in the Central Contractor Registry and must have completed a profile in the Online-Representations and Certifications database prior to award of a contract. Registration may be completed on the Internet at http://www.ccr.gov/. Vendors must also be registered in ORCA (Online Representations and Certifications) prior to contract award, and may accomplish this on the Internet at http://www.bpn.gov. You must be registered in CCR and have an MPIN number before you can begin ORCA registration. SET-ASIDE: None. This project will be issued subject to the Small Business Competitiveness Demonstration Program, and will be available for FULL AND OPEN COMPETITION. NAICS code is 236220. BONDING INFORMATION: Bid bond will be required (see solicitation for details); successful contractor will be required to furnish appropriate payment and performance bonds in accordance with FAR regulations prior to issuance of the Notice to Proceed. SOLICITATION DOCUMENTS: Solicitation AG-447U-S-06-0105LI and related documents will be issued via FedBizOpps as a Request for Proposals and will be available for downloading on or about July 25, 2006 at the website address: http://www.fedbizopps.gov/. All potential contractors and subcontractors should register on the FedBizOpps website as an Interested Vendor. The online Interested Vendors list will be the only such list maintained for this procurement.

More opportunities from Department Of Agriculture → National Forests In Mississippi

Same awarding agency

NAICS: 238210
Federal
Womble Work Center Fiber Optic Installation
Solicitation # 12445127Q0005
Solicitation 12445127Q0005 is a Request for Quote for the installation of a fiber optic connection at the Womble Work Center in Mount Ida, Arkansas, for the USDA Forest Service. The project involves installing approximately 1,300 linear feet of 8-strand outdoor fiber optic cable within a two-inch non-metallic conduit buried at a minimum depth of 18 inches, connecting the Ranger Office to the Work Center. The scope includes pulling the cable, installing pull boxes, and restoring disturbed areas with seed and mulch. This is a Total Small Business Set-Aside under NAICS code 238210, with an estimated contract value between $25,000 and $100,000. The contract will be awarded as a firm-fixed price BPA Call to the lowest price responsive and responsible bidder, following a Lowest Price Technically Acceptable (LPTA) evaluation. Performance is expected to be completed within 60 calendar days of the notice to proceed, with a general period of performance extending into early 2027. Key requirements include adherence to the Davis-Bacon Act for wage determinations, a one-year warranty period, and the submission of material submittals 15 days prior to work. All work must be performed between 8:00 AM and 4:30 PM, Monday through Friday, and must meet specific telecommunications and earthwork standards.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

15 days ago

DEADLINE

in 4 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS