Z--Shore Protection Program, Shoreline Stabilization Project, Whiting ME

Awarded
W912WJ-08-B-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The U.S. Army Corps of Engineers is seeking a HUBZone Small Business for a shoreline stabilization project along State Route 191 in Whiting, Maine. The project involves installing a 500-foot stone slope revetment along Holmes Bay, featuring a non-woven geotextile fabric, granular fill, and stone armor protection. To restore intertidal habitat and provide a riparian buffer, the work includes burying the stone toe, reusing excavated marsh soils, and planting native coastal grasses and shrubs on the upper slope. Construction is expected to last approximately six months and must be performed from land during dry tidal cycles. To protect local wildlife and water quality, the contractor must implement a Sediment Erosion Control Plan and adhere to strict environmental moratoriums, specifically avoiding in-water silt producing activities from March 15 to June 15 and avoiding construction between August 15 and September 15. The estimated project cost is between $500,000 and $1,500,000 under NAICS code 237990.

General Info

Contract Value

$497,821.48

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Aug 5, 2008 to Aug 25, 2008. The notice title changed. Set-aside changed from Partial HBCU / MI to HUBZone Set Aside. The notice description changed.

Notice updated

Response deadline changed from Aug 25, 2008 to Aug 21, 2008. The notice title changed. Set-aside changed from HUBZone Set Aside to Partial HBCU / MI. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
ContactsNo contacts available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
ContactsNo contact information available

Full Description

Show more
With this announcement, the U.S. Army Corps of Engineers issues a pre-solicitation notice for the following project: Shoreline stabilization project is located along State Route 191 (Cutler Rd) in Whiting, ME. The project involves placement of a stone slope revetment along 500 feet of Holmes Bay, which will tie-in with an existing stone revetment. The new stone revetment plan consists of clearing and grubbing vegetation on the existing slope prior to the placement of a non-woven geotextile fabric, a 1 foot thick layer of granular fill and 2 feet of stone armor protection then be placed on top at a 1:3 slope. On the upper slope, 8 inches of topsoil soil be placed and the area will be seeded and planted with regional coastal plantings. The revetment would be approximately 500 linear feet and 20 feet high (elevation 20.0 North American Vertical Datum (NAVD)). The stone toe will be buried to approximate elevation 9.0 NAVD to accommodate restoration of intertidal habitat. The toe of the revetment will be constructed in 30-foot sections. Saltmarsh cordgrass growing within the 6,000 square foot revetment toe area, will be removed with the root mass intact and marsh soils excavated and stockpiled. These excavated materials will be reused during the backfill process as each section of the buried toe is completed. The upper area of the revetment, from elevation 20.0 feet NAVD to the top of the bank (variable elevation) will be planted with native coastal grasses and shrubs, such as speckled alder. Coastal plantings on the upper slope will replace lost riparian function and will provide an effective riparian buffer between the road and the marsh. Construction will be undertaken from land during the dry portion of the tidal cycle and is expected to take about six months to complete. Appropriate erosion control measures will be implemented throughout construction including (but not limited to) installation of a hanging silt curtain to minimize migration of fine materials during excavation and construction activities. Contractor will remove fine material collected behind erosion control structures prior to removal of these structures. Contractor required to submit a Sediment Erosion Control Plan for Corps approval prior to commencement of construction activities. These measures will assure minimal water quality impact to sensitive fish and benthic resources and provide a net gain of saltmarsh habitat. Construction vehicles should not be located in water throughout the duration of the project. The construction period for the stabilization project incorporates a moratorium on in-water silt producing activities from March 15 to June 15 for the protection of winter flounder and other Federally managed species. In addition, the Maine Department of Inland Fisheries and Wildlife indicated that scheduling construction outside of the August 15 to September 15 window would eliminate any adverse effects to shorebirds in the area. The estimated cost of this work is between $500,000 and $1,500,000. This solicitation is 100% Set-Aside for HUBZone Small Business concerns. The NAICS code for the work is 237990 with a small business size standard of $31 million. The solicitation shall be made available via the Internet (www.fbo.gov) on or about 3 July 2007. Registration instructions are available at this website. Amendments, if any, will be available at this Internet site. Neither telephonic, mailed, nor faxed requests for solicitation documents will be accepted. All responsible HUBZone Small Business concerns may submit a bid, which will be considered by the New England District.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a sealed bid project for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project located between Isle au Haut and Kimball Island, Maine. The scope of work involves the mechanical dredging of approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and isolated boulders from a 1,200-foot long channel. The objective is to achieve a depth of -7 feet Mean Lower Low Water (MLLW), with an allowable one-foot overdepth for a maximum dredging depth of -8 feet MLLW. All dredged materials are to be disposed of at the Flake Island Disposal Site, approximately 0.9 nautical miles northwest of the project site, to enhance juvenile lobster and cod habitats. This project is a total small business set-aside under NAICS 237990, with an estimated price range between 1,000,000 and 3,000,000 dollars. Performance is strictly limited to an environmental window between September 15 and April 1 to protect spawning shellfish and other benthic resources, with a mandatory performance period of 120 calendar days after the Notice to Proceed. Bidders must submit proposals via the Procurement Integrity Enterprise Environment (PIEE) and provide bid, performance, and payment bonds. The contract requires adherence to EM 385-1-1 safety standards and the implementation of a comprehensive Contractor Quality Control Plan utilizing a three-phase control system.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
Federal
Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission Boundaries
Solicitation # W912WJ27RA001
The U.S. Army Corps of Engineers New England District is establishing a Multiple Award Task Order Contract (MATOC) pool for Architect-Engineering services to support Hazardous, Toxic, and Radioactive Waste (HTRW) projects. The total value of the pool is up to $49,000,000.00, with awards anticipated for a minimum of three small businesses and up to three unrestricted contracts. Work will primarily be performed within the six New England states, New York, and New Jersey, but may extend to other areas within the North Atlantic Division mission area, including Pennsylvania, Delaware, Maryland, Virginia, West Virginia, and the District of Columbia. The scope of work includes CERCLA investigations, the development of Quality Assurance Project Plans, advanced risk assessments, remedial designs, and construction cost estimates using MII. All work must comply with the DERP statute, CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and applicable DoD and Army policies. The selection process is conducted under the Brooks Act, with primary evaluation factors focusing on experience in CERCLA investigations, handling emerging contaminants such as PFAS and 1,4 Dioxane, and the ability to meet state regulatory requirements in regions like Massachusetts, Connecticut, and New Jersey. Large firms are evaluated on their ability to execute $4 million per year, while small businesses are evaluated on a $1 million annual capacity. Secondary tiebreaker factors include geographic proximity to the mission area, the extent of small business participation for large firms, and the volume of DoD contract awards in the previous 12 months. Submissions must be made electronically via the PIEE Solicitation module by January 29, 2027, and must adhere to strict page limits of 65 pages for large firms and 50 pages for small businesses.
Engineering Services

POSTED

5 days ago

DEADLINE

in 3 months
View Details
NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS