Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on September 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Webster Dam Spillway Radial Gates Repair

Closed
140R6026R0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 6 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

Solicitation 140R6026R0016 is a firm-fixed-price construction contract issued by the Bureau of Reclamation's Great Plains Regional Office for the rehabilitation of three spillway radial gates and the associated gallery at Webster Dam in Rooks County, Kansas. This total small business set-aside project, with an estimated magnitude between 5 million and 10 million dollars, focuses on the removal and disposal of existing coatings and the application of a new three-coat system to exterior gates and gallery surfaces. Additionally, the scope includes the refurbishment of spillway radial gate hoists, specifically the replacement of wire ropes, sockets, and grease lines, as well as the replacement of radial gate side seals. The period of performance is scheduled from November 1, 2026, to October 31, 2027. The procurement is conducted under FAR Part 15, with award based on the most advantageous proposal. Evaluation factors include a technical plan, company experience, and past performance, which collectively carry significantly more weight than price. Mandatory requirements for the selected contractor include providing performance and payment bonds for 100 percent of the contract price, a bid guarantee of 20 percent of the bid price or 3 million dollars, and a site-specific safety plan adhering to OSHA and Reclamation standards. Payment will be processed electronically through the Invoice Processing Platform with a 10 percent retainage. Technical execution must follow strict quality standards, including SSPC PA2 for dry film thickness and ASTM D4541 for adhesion testing, with all gate operations restricted to Government personnel.

General Info

Rehabilitation of Webster Dam spillway gates, $5-10M, small business set-aside, 355-day contract.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

KS, 67669, USA

Set-Aside

SBA

Documents

13

01 14 20 Radial Gate Operation (Revised)

PDF, High priority: read this first3 pages · sow
High

Amendment 0001 - Solicitation 140R6026R0016

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 Q&A - Solicitation 140R6026R0016

PDF, High priority: read this first6 pages · amendment
High

Amendment 0002 to Solicitation 140R6026R0016

PDF, High priority: read this first2 pages · amendment
High

Amendment 0003 - Solicitation 140R6026R0016

PDF, High priority: read this firstamendment
High

Amendment 3 - Section K FAR 52.219-1 - Solicitation 140R6026R0016

PDF, High priority: read this firstamendment
High

RFP 140R6026R0016 Webster Dam Spillway Radial Gates Repair

PDF, High priority: read this first100 pages · rfp
High

Section J Attachment 3 Specifications 7-7-26

PDF, High priority: read this first201 pages · specifications
High

Solicitation 140R6026R0016 pre-proposal site visit agenda and sign-in sheet

PDF, High priority: read this first5 pages · rfp
High

Solicitation 140R6026R0016 Webster Dam Spillway Radial Gates Repair IFB

PDF, High priority: read this first3 pages · ifb
High

Webster Dam Section 41 22 31 – Refurbishment of Spillway Radial Gate Hoists

PDF, High priority: read this first10 pages · sow
High

Webster Dam Spillway Radial Gates Repair - Section 09 96 20 Coatings (Revised)

PDF, High priority: read this first14 pages · sow
High

Section J Attachment 4 Drawings for Radial Gate Seals 468-D-124

PDF, Low prioritydrawings
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

special-notice

Notice updated

Notice type changed from Special Notice to Solicitation. Response deadline changed from Aug 10, 2026 to Aug 27, 2026. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Aug 27, 2026 to Sep 10, 2026. The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Great Plains Regional Office
Contacts1 person available
OfficeBILLINGS, MT, 59101, USA
Office AddressBILLINGS, MT, 59101, USA

Full Description

Show more
Webster Dam, Spillway Radial Gates Repair, Webster Unit, Solomon Division, Pick-Sloan Missouri Basin Program, Kansas

More opportunities from Department Of The Interior → Great Plains Regional Office

Same awarding agency

NAICS: 333111
Federal
37--DK Boom Spray Rig for Flat-Bed Truck
Solicitation # 140RR027Q0005
Solicitation 140RR027Q0005 is a Firm Fixed Price, Total Small Business Set-aside contract issued by the Department of the Interior, Bureau of Reclamation, Missouri Basin Regional Office. The project requires the supply and installation of a new skid-mounted boom spray rig tender system for the North Dakota Field Office in Elgin, ND, to be used for noxious weed mitigation in the Lake Tschida area. The scope of work includes the purchase of a new herbicide-resistant system and the removal and disposal of an existing 31-year-old system from a Government-Furnished Property 2011 Dodge Ram 3500 flatbed truck. All components must be herbicide chemical resistant, and the final delivery must be completely ready for field operations. The contract is categorized under NAICS code 333111 for Farm Machinery and Equipment Manufacturing. While initial fabrication and installation may occur outside a 300-mile radius of Elgin, ND, provided the contractor manages all transportation of the government vehicle, all future servicing and maintenance must be performable within that 300-mile radius. Award will be based on the Lowest Price Technically Acceptable (LPTA) criteria, with technical acceptability determined by adherence to the Statement of Work. Following Amendment 0001, the response deadline is November 13, 2026, at 1500 MST. Payment will be processed electronically through the U.S. Department of the Treasury’s Invoice Processing Platform.
Farm Machinery and Equipment Manufacturing

POSTED

14 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS