This Government Contract opportunity from Department Of Veterans Affairs was posted on January 18, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--36C77623C0004 - EHRM Upgrade - Denver Faith Enterprises, Inc.

Awarded
36C77622B0051Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

Contract 36C77623C0004 was awarded by the Department of Veterans Affairs to Faith Enterprises, Inc. on January 11, 2023, for EHRM Upgrades in Denver. The total contract value is 6,495,195.00 dollars, categorized under NAICS code 236220 and set aside for Service-Disabled Veteran-Owned Small Businesses. The project is administered by the Program Contracting Activity Central located in Independence, Ohio. The scope of work involves comprehensive infrastructure improvements, including the replacement of heat pumps with fan coils, the installation of new 30-amp UPS systems and circuits, and significant electrical and HVAC upgrades. Key technical requirements include the installation of approximately 3,600 Cat6A horizontal cabling runs, the replacement of 48-port patch panels, and the integration of new humidity sensors into the existing JCI-Metasys Building Automation System. The project also includes specific security installations such as Axis panoramic cameras and Veridt Stealth Dual PACS, while removing previous requirements for facility-wide fiber upgrades and redundant fiber runs.

General Info

Contract Value

$4,909,195

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

OH, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

Award 36C77623C0004 - EHRM Upgrade - Denver Faith Enterprises, Inc.

DOCX, Low priority3 pages · award
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 22, 2022 to Aug 29, 2022. The notice description changed.

Notice updated

Response deadline changed from Aug 29, 2022 to Oct 14, 2022. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Set-aside added: SDVOSB Sole Source.

Notice updated

Set-aside removed. The notice description changed.

Notice updated

Response deadline changed from Oct 14, 2022 to Oct 17, 2022. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
Contacts1 person available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Jeannine L Larsen (ContractorJeannine Larsen

Full Description

Show more
5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 1 10 0004 9-16-2022 554-21-700 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 00076 Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders 36C77622B0051 X X X 1 X 1 The purpose of this amendment is to provide responses to technical questions, provide associated drawings, and site visit information . . All other terms and conditions remain the same Samantha Mihaila Contracting Officer Page 10 of 10 36C776-22-AP-1581 554-21-700 RMRVAMC EHRM Upgrades Const Pre-Bid RFI Answers and Addendum Items Addendum and Pre-bid RFI s (as submitted), with answers/additions in bold red. Additional Site Visit Information is listed on page 8. The following list of revised drawings is provided with explanation: 1-CBS-A1.0 Revision showing removing VCT, leveling floor, adding epoxy coating to the floor. 10-CBS-M1.4 Revised to show new BAS style humidistats and wiring to existing controllers. 10-CBS-M1.5 Revised to show new BAS style humidistats and wiring to existing controllers. 10-CBS-M1.6 Revised to show new BAS style humidistats and wiring to existing controllers. 10-CBS-M1.7 - Revised to show new BAS style humidistats and wiring to existing controllers. 2-RES-E1.1 Added keyed notes to plan that were missing. 10-CBS-E1.7 - removing static grid requirements. 2 A technical question came in regarding the ACT / grid removal Will the contractor be able to remove the ACT / grid during normal work hours so heat pump can be replaced during off hours or Will that work have to be done outside of normal hours in conjunction with the heat pump work. ACT/grid work may be performed during the day; however, ceiling opening is not allowed to be larger than 2 tiles (unless inside ICRA containment), therefore as ACT/grid is removed, the opening will have to be systematically closed with a plastic barrier/tape. This condition (grid/tile removed and replaced w/ plastic) is only allowed immediately before/after the mechanical work. - Need more direction on what customer wants to be done for secondary DMARC. Drawing number 01-CON E 1.3 What is the scope of work for upgrading the facilities fiber throughout the buildings to each IT closet? SOW states this is to be done but the prints provided indicate that most comm rooms only require PDU and grounding upgrade. Is there missing prints, was the work completed or was this taken out of the SOW on a later date? The following phrase shall be stricken from the second paragraph of 2.0 SOW: The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point - If equipment needs to be removed other than the existing PDU and UPS, is government, or contractor responsible for removal? RFI is unclear as to what potential equipment is being questioned. Contractor is responsible for removal or removal & replacement of the equipment and items as specified in the scope/drawings/specs (heat pumps with fan coils, ACT/grid removal/replacement, replace PDUs etc.). Any incidental work required to complete the specified work is included. - For the new 30-amp circuits. Is the requirement to install new 30-amp circuits with new conduit, then install new 30-amp UPS, cut over equipment to new 30-amp UPS from 20-amp UPS , and then demo old 20-amp circuits and conduit, or can a 20-amp UPS be taken down, demo 20-amp circuit, install new 30-amp circuit through existing conduit and install new 30-amp UPS and plug in equipment? - Just trying to understanding phasing requirements and if there can be selected down time for UPS while new circuit and new UPS are being installed utilizing existing conduits Contractor shall install A-side conduit, wiring and connections as specified for all locations. B-side re-use can be evaluated and negotiated on a case-by-case basis, post-award. - Question #1 - ROOM Q1-124 shows OCCUPANCY SENSOR, 180° CAMERA, DUAL FACTOR AUTHENTICATION PAC, are these to be included as the contractor scope? If so please provide system information, front end locations and POC for the specialty trades that maintain these system. Occupancy sensor can be omitted; camera and PACS are included. Basis of design for camera is Axis M4308-PLE Panoramic, and for PACS is Veridt Stealth Dual model PN 900W2036. Connection to be made within Q1-124. PACS software is Lenel OnGuard (HSPD-12 compliant). The video software is Milestone, which integrates with the OnGuard. Any new additions need to be compatible and incorporated with current system. Question #2 The new FCU s reflect the electrical circuit they are on. Can the VA provide the room number where each of the panels are located? 10-EQH13 is located in A1-203 10-EQH2 is located in A2-327A 10-EQH3 is located in A3-347A 10-EQH4 is located in A4-329 - Question #3 - SECTION 09 65 19 refer to Section 09 06 00, SCHEDULE FOR FINISHES for Color, Pattern and Texture for Resilient Tile Flooring and Accessories. Can the VA provide this specification or the basis of design for the flooring/cove base needed? Sheet # 1-CBS-A1.0 is reissued with Aug 31, 2022, date for new instructions for finishes. - Question #4 The electrical drawing has the following general note: AT ALL CABINETS WITH DOORS, PROVIDE A BONDING JUMPER BETWEEN CABINET & DOOR. The drawings do not indicate which cabinets have doors. Can the VA provide this information? There are 10 total cabinets that require bonding jumpers, all in telecom rooms in Bldg. A. - Question #5 Drawing sheet 2-RES E1.1 does not have specific notes for each room as the other sheets do. Can the VA provide these notes? Sheet # 2-RES-E1.1 is reissued with Aug 31,2022 date indicating keyed notes for each room - Question #6 Many of the drawing sheets has a General Note stating to see Detail 1 for equipment and wiring configuration on sheet 13-E1.1. I doesn t appear this sheet was provided. Can the VA provide this detail? Contractor to observe the General Note on existing plans sheets for Detail 1 on 13-E1.1 to reference information located on sheet 13-PVS-E1.1 (upper right of sheet) - Question #7 Just to confirm there is no horizontal cabling and or data outlets requirements for this project correct? This is not otherwise clearly specified; however, the following is REQUIRED: Horizontal cabling is required in Bldg10(CBS/Bldg.). All existing building data cabling to be replaced with Cat6A; 48-port patch-panels in telecom rooms to be replaced with Cat6A compatible (78 total). Additional drawings 10-TA-301 through 304 are provided for reference to give bidders an idea of building layout/function, however some ports have been added/reconfigured since these drawings. - Contractor can expect to provide approximately 3600 total runs. Cabling exits the telcom-room via fire rated penetration, generally runs via J-hook to/from cable tray spine and enters walls via existing conduit (conduit to remain. - No conduit installation/removal included in this scope) or power poles. Contractor to terminate all connections in/provide new stainless 2/4/6 port labeled stainless faceplates (picture below). Contractor required to test, label, and certify all cabling per VA naming convention (i.e., A1-345 D1-23/24). All replaced cabling to be demo ed (can be used to pull new) and disposed of by contractor. All work for this scope to be accomplished during regular business hours. Question #8 The HVAC notes state to EXISTING HEAT PUMP. RE-USE EXISTING DUCTING, POWER, CONTROLS, AND CONDENSATE PIPING AS POSSIBLE. Can the VA confirm that any modifications to extend power and/or communication (BMS) raceways in order to install the new FCUs is the responsibility of the contractor? Confirmed - Question #9 The HVAC demo notes say to re-use controls. The existing controllers on the existing HP s are obsolete, can the VA confirm we are to provide new controllers and if so are they to be The FCU s will be controlled by external Metasys controllers? If the existing controllers cannot be reused, replace with BACnet controller. Can be stand-alone / does not have to be programed into building automation system, as a follow-on project will convert the entire building controls. - Question #10 Reference Drawing 10-CBS M 0.1/ details 4 &5. The equipment schedule for the new FCUs appear to all be the same. Can the VA clarify which of the FCUs have 2-WAY PRESSURE INDEPENDENT CONTROL VALVE and which have 3-WAY PRESSURE INDEPENDENT CONTROL VALVE? There is no Detail 5 on this page. All FCU shall be 2-way per Detail 4. Detail 3 shall be ignored. - Question #11 Reference SOW document. - The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point Can the VA clarify the extent of fiber work required as there is no riser diagram that indicates a redundant fiber run throughout the facility as described in the SOW above? Per question above, this statement shall be stricken from the SOW - The SOW states to upgrade the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point , although the drawings do not reflect that. Can a drawing be made available to reflect what is stated in the drawings? - Per question above, this statement shall be stricken from the SOW VA issued Addendum item to SOW: #1 - Contractor to provide new Johnson Controls humidity sensor model NS-AHB7003-0, or equivalent with BacNet MSTP capabilities, and to install at every TR shown in Electrical Plans. New sensor to be added via network inside each room, integrated into existing BAS, commissioned by the Contractor, and added to front end operator graphics. At Contractor option, provide combination temp sensor/humidity sensor that will display both at sensor, and replace existing temperature sensor at each TR location shown on Electrical Plans. Add humidity sensors to all CBS building TR locations (total of 8), on new junction box, conduit connecting new humidity sensor to new fan coil, and integrate to existing controller. If existing CBS controller does not accept BacNet MSTP network, add sensor to existing universal or analog port on each controller, and add to existing graphics interface for that building. Contractor to provide BacNet capable network wiring from new humidistat and installed in CBS building to each new fan coil and include a 10 service loop for future installation if network is not being used initially. No new plans are issued for this added scope of work, except to clarify new locations inside CBS building TR. #2 See answer to Question #7 above regarding Horizontal Cabling. This requirement is not otherwise specified. Additional Questions The following questions are in regards to the Denver EHRM Infrastructure Upgrades: Reference Attachment 00 SOW EHRM 554-21-700 Paragraph 2.0 Statement of Work: The project shall include but is not limited to, upgrading the facilities fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide a new main fiber line coming into the building from the provider point, install additional IT outlets, install new electrical outlets throughout the facility, provide additional outlets in each IT closet, electrical UPS, Building Management System interfaces, assess for new and upgrades for existing HVAC and upgrade facility power distribution as required. Drawings do not show upgrading the facilities fiber throughout the building to each IT closet. Please provide drawings showing the new fiber pathways to each IT closet. Per question above, this statement shall be stricken from the SOW Per drawing 19 of 45 01-CON E 1.3 the redundant fiber line is existing please confirm the contractor is to disconnect the existing Demarc Device and re-run existing redundant fiber line to the new location of the relocated Demarc Device. The notes on 01-CON-E 1.3 that indicate Existing AT&T WAN Service Demarc Device relocated from/To GP-103A/CS-103 are stricken. These devices and the fiber connections do not require work under this contract. Please provide drawings showing the new main fiber line location and pathways through the buildings. Not Required. Please provide drawings showing the location and quantities of the additional IT outlets. Statement of work was prepared generically prior to the drawings. The drawings & specs and this addendum show/govern all required work. Please provide drawings showing the location and quantities of the new electrical outlets throughout the facility. Statement of work was prepared prior to the drawings. The drawings & specs and this addendum show/govern all required work Please provide the locations and quantities of the additional outlets in each IT closet. Statement of work was prepared prior to the drawings. The drawings & specs, and this addendum show/govern all required work Please provide detailed drawings showing the required facility power distribution upgrades. Statement of work was prepared prior to the drawings. The drawings & specs and this addendum show/govern all required work Please specify any required building management interfaces. See answers above. BAS is JCI-Metasys. Added scope requires humidity monitoring in every indicated telecom room connected and programmed into Metasys. HVAC controls scope for Building 10(A/CBS) indicated above. Please confirm the project drawings show the new upgrades for the existing facility HVAC. Confirmed Reference Attachment 00 SOW EHRM 554-21-700 Paragraph 3.0 General: VA reserves the right to reject a bid from a contractor who did not attend the pre-bid walkthrough. Will the VA consider issuing an additional site visit time and date to meet the SOW attendance requirement? An additional site visit will be held on September 21, 2022, 1:00 PM. The location is 1700 North Wheeling Street, Aurora, Co. 80045. Contractors shall meet at the north end of the main concourse outside of the patriot brew coffee shop. This is also outside of the concourse entry to Building K. Please provide the site visit sign-in sheet from August 3, 2022, 9AM. See below Will the VA be issuing an amendment with answers to contractor questions? See attached document: EHRM 554-21-700 - REV 1. See attached document: 10 -TA-301 - 304. End of Document

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 541611
New
Federal
Bronx EUL Development Opportunity Sources Sought
Solicitation # 36C77626Q0277
The Department of Veterans Affairs is seeking expressions of interest from qualified developers for an Enhanced-Use Lease opportunity at the James J. Peters VA Medical Center in the Bronx, New York. The project involves the redevelopment of an approximately 1.6-acre parcel to construct, finance, operate, and maintain a parking structure with at least 900 spaces to alleviate significant on-campus parking shortages. Under the terms of the potential lease, which can extend up to 99 years, the developer must provide free parking for Veterans and their families during standard weekday business hours. The government has clarified that due to land and density constraints, mixed-use developments including housing are not anticipated for this specific site. This Sources Sought Notice is intended for market research to determine the best acquisition strategy and is not a formal solicitation for proposals. The VA is particularly interested in the capabilities of Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses, specifically those capable of performing at least 51 percent of the development. Interested respondents must demonstrate a proven track record in real estate development, property management of parking facilities, and the ability to secure non-VA financing. Responses, including company business information, qualification summaries, and answers to a government questionnaire, are due by November 10, 2026.
Administrative Management and General Management Consulting Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
Federal
542-22-700 | EHRM Construct Infrastructure Upgrade | Coatesville, PA |
Solicitation # 36C77626Q0138
The Department of Veterans Affairs, Veterans Health Administration, is conducting market research via a Sources Sought Notice for the EHRM Infrastructure Upgrades Construction project at the Coatesville VA Medical Center in Pennsylvania. This project involves site preparation, demolition of existing structures, and the installation of critical telecommunications infrastructure, specifically plenum rated OM4 and OS2-10GB fiber and CAT 6A copper cabling. The scope requires all cables to be terminated, labeled, and documented, with an additional 20 percent capacity provided as specified in the project drawings. The anticipated procurement will be a competitive, firm-fixed-price contract using a design-bid-build approach, with solicitation expected in late December 2026. The magnitude of construction is estimated between 20 million and 50 million dollars, falling under NAICS code 236220. The estimated period of performance is 770 calendar days from the Notice to Proceed. The project is currently designated as a Service-Disabled Veteran-Owned Small Business set-aside. Interested respondents must submit a capabilities statement by October 26, 2026, including company details, a statement of interest, and a letter of intent regarding bonding capacity. Technical qualifications must demonstrate experience with projects of at least 20 million dollars in occupied medical facilities, including work with uninterrupted service lines, infection control, and off-hours execution. Additionally, the government is evaluating the use of Project Labor Agreements in accordance with FAR 22.5, requiring respondents to complete a PLA questionnaire.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Federal
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation # 36C77626B0011_1
Solicitation 36C77626B0011 is a sealed bid invitation for the Community Living Center (CLC) Phase III Minor Construction project at the West Texas VA Health Care System in Big Spring, Texas. This project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and involves the construction of a new 10-bed CLC Cottage (Building 28). The facility will be a single-story building of approximately 7,500 square feet featuring steel framing with a brick veneer. The estimated contract value ranges between 10 million and 20 million dollars, with a target cost limit of 12 million dollars. Award will be granted to the responsible bidder offering the most advantageous price for the base bid, with several deductive alternates available to reduce scope if the base bid exceeds available funding. The scope of work includes all labor, materials, and equipment for general construction and associated site work, including specific requirements for medical gas systems, resinous urethane flooring, and standardized brand-name systems for security cameras (Motorola Avigilon), physical access control (HID), and fire alarms (Siemens Desigo). Contractors must adhere to strict safety and quality protocols, including Pre-Construction Risk Assessments (PCRA) and VHA Infection Control Risk Assessments (ICRA). The project is subject to Davis-Bacon Act wage determinations for Howard County, Texas, and requires performance and payment bonds. Bids must be submitted electronically, and the final deadline for receipt of offers was extended to October 22, 2026.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS