Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Spring

Closed
36C77626B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract solicitation numbered 36C77626B0001 issued by the Department of Veterans Affairs (VA) pertains to the construction of the EHRM Tier 2 Data Center at the West Texas VA Health Care System in Big Spring, Texas. This is a firm-fixed-price (FFP) design-bid-build project set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under NAICS code 236220 (Commercial and Institutional Building Construction). The estimated construction value is between $5 million and $10 million, with a mandatory performance period of approximately 224 calendar days after award. The work involves renovating vacated space to comply with Electronic Health Record Modernization (EHRM) infrastructure upgrades, including detailed architectural, structural, mechanical, electrical, plumbing, fire protection, and telecommunications installation as described in comprehensive bid resubmission specifications and drawings. The solicitation includes performance and payment bond requirements, a mandatory pre-bid site visit, and requires compliance with a range of construction quality control, safety, and commissioning standards consistent with VA and industry best practices. The selection will be made on a Lowest Price Technically Acceptable (LPTA) basis, requiring bidders to be fully responsive to the solicitation terms and responsible under FAR standards. Critical compliance includes adherence to subcontracting limitations that restrict payments to non-certified subcontractors to no more than 85% of the contract value, with mandatory certifications submitted as part of the offer. The contract mandates a Construction Quality Control (CQC) system managed by qualified personnel onsite at all times, with specialized discipline experts as needed. Construction operations are restricted to normal working hours with any overtime requiring prior approval. The solicitation also emphasizes VA-specific security protocols for personnel site access. Administrative provisions require use of web-based project management tools to coordinate communications, submittals, and documentation. Submission of all proposals must be electronic, in searchable PDF format, by the stated deadlines. Amendments to the solicitation have extended the bid due date to January 8, 2026. Inspection and acceptance will be performed on site per applicable FAR and ASTM standards, ensuring completed work meets all contractual, safety, and technical requirements prior to final government acceptance.

General Info

VA seeks SDVOSB firm for $5-10M fixed-price EHRM data center renovation in Texas, 224 days.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Big Spring, TX, 79720, USA

Set-Aside

SDVOSBC

Documents

35

Addendum 01 - Asbestos and Lead Paint Assessment West Texas VA Hospital

PDF, High priority: read this first49 pages · addendum
High

Addendum 01 to Section 08 71 00 Door Hardware Specifications

PDF, High priority: read this first28 pages · amendment
High

AE300 Addendum 01 - Door Schedule and Finish Details

PDF, High priority: read this first1 page · amendment
High

Amendment 0001 to Solicitation 36C77626B0001 for EHRM Tier 2 Data Center Construction

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0002 to Solicitation 36C77626B0001 for EHRM Tier 2 Data Center Construction

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0003 to Solicitation 36C77626B0001 for EHRM Tier 2 Data Center Construction

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0004 to Solicitation 36C77626B0001 for EHRM Tier 2 Data Center Construction

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0005 to Solicitation 36C77626B0001 for EHRM Tier 2 Data Center Construction

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0006 to Solicitation 36C77626B0001 for EHRM Tier 2 Data Center Construction

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0007 to Solicitation 36C77626B0001 - Bid Due Date Extension

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0008 to Solicitation 36C77626B0001

PDF, High priority: read this first2 pages · amendment
High

Asbestos Management Plan for VA Medical Center Building 1, Big Spring TX

PDF, High priority: read this first336 pages · management-plan
High

Asbestos Survey Report September 2016 Building 1 VA Medical Center

PDF, High priority: read this first70 pages · survey-report
High

Big Spring EHRM 2-2-26 Contractor Questions Tracker

PDF, High priority: read this first43 pages · q-and-a
High

GC201a Addendum 01 Phasing Plan for VA Big Spring Data Center

PDF, High priority: read this first1 page · amendment
High

Howard County Building Construction Wage Determination TX20250156

PDF, High priority: read this firstwage-determination
High

Howard County Texas Building Construction Wage Determination 01-02-2026

PDF, High priority: read this firstwage-determination
High

Howard County Texas Building Construction Wage Determination 7-18-2025

PDF, High priority: read this first6 pages · wage-determination
High

Justification and Approval for Brand Name Procurement - Big Spring EHRM

PDF, High priority: read this first4 pages · justification-and-authorization
High

Solicitation 36C77626B0001 - EHRM Tier 2 Data Center Construction

DOCX, High priority: read this first54 pages · ifb
High

Tech Questions Tracker - Big Spring EHRM 12-31-2025

PDF, High priority: read this first41 pages · q-and-a
High

VA BSP EHRM Infrastructure Upgrades Contract Drawings 12-23-2022

PDF, High priority: read this first116 pages · contract-document
High

VHA Master Specifications Table of Contents Addendum 01

PDF, High priority: read this first4 pages · specifications
High

Abstract of Bids OF 1419 - Big Spring EHRM Tier 2 Data Center

PDF, Low priorityabstract-of-bids
Low

Asbestos and Lead Based Paint Photolog for Building 1

PDF, Low priority4 pages · photolog
Low

Lead-Based Paint Inspection Report Building 1 VA Medical Center

PDF, Low priority32 pages · inspection-report
Low

PCRA Tier 2 Data Center Construction Risk Assessment Template

PDF, Low priority5 pages · other
Low

Section 01 31 00.01 Project Management and Coordination Specification

DOCX, Low priority2 pages · other
Low

Site Visit Instructions for Scheduled Visit on November 18, 2025

DOCX, Low priority1 page · special-notice
Low

Site Visit Sign-In Sheet 11/18/2025 Big Spring TX

PDF, Low prioritysign-in-sheet
Low

VA Big Spring Data Center Bid Resubmission Drawings

PDF, Low priority78 pages · other
Low

VA BSP Data Center Bid Resubmission Volume 2 - Commissioning and Wet-Pipe Sprinkler Systems

PDF, Low priority543 pages · other
Low

VA Notice of Limitations on Subcontracting Certificate for Construction JAN 2023

DOCX, Low priority2 pages · contract-document
Low

VA Project 519-23-908 Data Center Bid Resubmission Volume 1 Specifications

PDF, Low priority737 pages · other
Low

VHA Infection Control Risk Assessment Template for Construction and Maintenance

PDF, Low priority8 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

11 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Dec 18, 2025 to Dec 11, 2025. The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Deadline changed

Response deadline changed from Dec 11, 2025 to Dec 18, 2025.

Notice updated

The notice title changed.

Notice updated

Response deadline changed from Dec 18, 2025 to Jan 8, 2026. The notice title changed.

Notice updated

Response deadline changed from Jan 8, 2026 to Jan 20, 2026. The point of contact changed.

Notice updated

Response deadline changed from Jan 20, 2026 to Jan 27, 2026. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 27, 2026 to Feb 3, 2026.

Notice updated

Response deadline changed from Feb 3, 2026 to Feb 5, 2026. Set-aside added: Service-Disabled Veteran-Owned Small Business Set Aside.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
Contacts2 people available
OfficeINDEPENDENCE, OH, 44131, USA
Office AddressINDEPENDENCE, OH, 44131, USA
Contacts
Devin RussellContract Specialist
Richelle N. Gray

Full Description

Show more

EHRM Tier 2 Data Center Construction Big Spring

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 236220
New
Federal
542-22-700 | EHRM Construct Infrastructure Upgrade | Coatesville, PA |
Solicitation # 36C77626Q0138
The Department of Veterans Affairs, Veterans Health Administration, is conducting market research via a Sources Sought Notice for the EHRM Infrastructure Upgrades Construction project at the Coatesville VA Medical Center in Pennsylvania. This project involves site preparation, demolition of existing structures, and the installation of critical telecommunications infrastructure, specifically plenum rated OM4 and OS2-10GB fiber and CAT 6A copper cabling. The scope requires all cables to be terminated, labeled, and documented, with an additional 20 percent capacity provided as specified in the project drawings. The anticipated procurement will be a competitive, firm-fixed-price contract using a design-bid-build approach, with solicitation expected in late December 2026. The magnitude of construction is estimated between 20 million and 50 million dollars, falling under NAICS code 236220. The estimated period of performance is 770 calendar days from the Notice to Proceed. The project is currently designated as a Service-Disabled Veteran-Owned Small Business set-aside. Interested respondents must submit a capabilities statement by October 26, 2026, including company details, a statement of interest, and a letter of intent regarding bonding capacity. Technical qualifications must demonstrate experience with projects of at least 20 million dollars in occupied medical facilities, including work with uninterrupted service lines, infection control, and off-hours execution. Additionally, the government is evaluating the use of Project Labor Agreements in accordance with FAR 22.5, requiring respondents to complete a PLA questionnaire.
Commercial and Institutional Building Construction

POSTED

about 21 hours ago

DEADLINE

in 5 days
View Details
NAICS: 541611
New
Federal
Bronx EUL Development Opportunity Sources Sought
Solicitation # 36C77626Q0277
The Department of Veterans Affairs is seeking expressions of interest from qualified developers for an Enhanced-Use Lease opportunity at the James J. Peters VA Medical Center in the Bronx, New York. The project involves the redevelopment of an approximately 1.6-acre parcel to construct, finance, operate, and maintain a parking structure with at least 900 spaces to alleviate significant on-campus parking shortages. Under the terms of the potential lease, which can extend up to 99 years, the developer must provide free parking for Veterans and their families during standard weekday business hours. The government has clarified that due to land and density constraints, mixed-use developments including housing are not anticipated for this specific site. This Sources Sought Notice is intended for market research to determine the best acquisition strategy and is not a formal solicitation for proposals. The VA is particularly interested in the capabilities of Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses, specifically those capable of performing at least 51 percent of the development. Interested respondents must demonstrate a proven track record in real estate development, property management of parking facilities, and the ability to secure non-VA financing. Responses, including company business information, qualification summaries, and answers to a government questionnaire, are due by November 10, 2026.
Administrative Management and General Management Consulting Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
Federal
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation # 36C77626B0011_1
Solicitation 36C77626B0011 is a sealed bid invitation for the Community Living Center (CLC) Phase III Minor Construction project at the West Texas VA Health Care System in Big Spring, Texas. This project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and involves the construction of a new 10-bed CLC Cottage (Building 28). The facility will be a single-story building of approximately 7,500 square feet featuring steel framing with a brick veneer. The estimated contract value ranges between 10 million and 20 million dollars, with a target cost limit of 12 million dollars. Award will be granted to the responsible bidder offering the most advantageous price for the base bid, with several deductive alternates available to reduce scope if the base bid exceeds available funding. The scope of work includes all labor, materials, and equipment for general construction and associated site work, including specific requirements for medical gas systems, resinous urethane flooring, and standardized brand-name systems for security cameras (Motorola Avigilon), physical access control (HID), and fire alarms (Siemens Desigo). Contractors must adhere to strict safety and quality protocols, including Pre-Construction Risk Assessments (PCRA) and VHA Infection Control Risk Assessments (ICRA). The project is subject to Davis-Bacon Act wage determinations for Howard County, Texas, and requires performance and payment bonds. Bids must be submitted electronically, and the final deadline for receipt of offers was extended to October 22, 2026.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS