Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Zero Emissions Port Electrification of Operations and Grid Reliability Project

Forecast
2025120795State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Zero Emissions Port Electrification of Operations and Grid Reliability Project, managed by the Los Angeles Department of Water and Power, is designed to expand electrical sub-transmission and distribution capacity at the Port of Los Angeles. This initiative supports the Clean Air Action Plan goals of achieving zero-emission cargo-handling equipment by 2030 and zero-emission trucks by 2035. The scope of work includes installing sixteen new 34.5 kilovolt underground distribution circuits, constructing three new switching stations, and installing a wet cooling tower at the Harbor Generating Station. Additionally, the project will expand the capacity of Receiving Stations Q and C to provide an additional 200 megavolt-amperes to ensure grid reliability and resilience during the transition to clean energy. Project execution is scheduled to occur between April 2026 and December 2030, with phased construction activities including demolition, foundation work, and commissioning across multiple sites such as Terminal Island, Harry Bridges, and the Outer Harbor. The project has undergone environmental review in compliance with the California Environmental Quality Act, resulting in a Negative Declaration stating that the project will not have a significant environmental effect. Coordination involves multiple agencies, including the Los Angeles Harbor Department and Caltrans, to manage permits for state right-of-way and oversized vehicle transportation.

General Info

LADWP expands Port of Los Angeles electrical capacity for zero-emission goals from 2026-2030.

Agency

California Los Angeles Department of Water and Power

Place of Performance

Harry Bridges and Fries Avenue, Los Angeles, CA, 90744

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Marshall CyrEnvironmental Specialist

Full Description

Show more
In 2017, the City of Los Angeles Harbor Department (LAHD) adopted the Clean Air Action Plan (CAAP) which outlined goals to make the Port of Los Angeles (POLA or Port) a global leader for cleaner air, sustainability, and innovation by electrifying port operations and reducing greenhouse gas emissions below 1990 levels by 40% in 2030 and 80% by 2050. POLA is expected to see increasing levels of electrical load growth and electrification as it adopts the CAAP zero-emission goals, zero-emission cargo-handling equipment (CHE) by 2030, and zero-emission trucks by 2035. CHE includes equipment that moves cargo (including cargo in containers, general cargo, and bulk cargo) to and from marine vessels, railcars, and on-road trucks. To support these goals, the Los Angeles Department of Water and Power (LADWP) proposes to expand the capacity of the electrical sub-transmission and electric distribution system within POLA, known as the Zero Emissions Port Electrification of Operations (ZEPEO) Project. LADWP proposes to increase the capacity of electricity distribution within the POLA by installing sixteen (16) new 34.5 kilovolt (kV) underground distribution circuits. Electricity is currently supplied to POLA through Receiving Station (RS) - Q located at the Harbor Generating Station (HGS); however, RS-Q and RS-C (located in Wilmington) will need to increase their electrical capacity to provide the additional 200 megavolt-amperes (MVA) needed for the established port electrification goals. To accommodate the estimated increase in load, LADWP is proposing to expand the capacity of RS-Q and RS-C , install three new switching stations, and construct a wet cooling tower within HGS to maintain existing generation capacity to ensure the reliability and resilience of the City of Los Angeles’s electrical power system while additional renewable generation, energy storage, distributed generation, and transmission system improvements are implemented, thereby facilitating the transition to a clean energy future. Project construction is anticipated to start in April 2026 and is anticipated to conclude in December 2030.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. The selected subcontractor will be responsible for providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The project requires the procurement and delivery of all materials, as well as the removal and offsite disposal of all construction waste and debris. Integrated into the construction process are critical material characterization tests, including California Bearing Ratio, Plate Load, Heavy/Falling Weight Deflectometer, and Dynamic Cone Penetrometer tests, necessitating the use of professional testing laboratories and geotechnical engineering services. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 5 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Dalton Utilities

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
Federal
Y1AZ--504-21-703 Training and Admin Support Space Construction
Solicitation # 36C25727B0001
The Amarillo VA Medical Center requires the construction of infrastructure and concrete pad space to support mobile EHRM training and administrative facilities at the Amarillo VA Health Care System in Amarillo, Texas. The scope of work includes providing electrical power, domestic water, sanitary sewer, and telecommunications fiber to three utility pad locations, constructing concrete pads according to specifications, and restoring any landscaping, roads, or sidewalks disturbed during construction. This project, identified as Project No. 504-21-703, is anticipated to be awarded as a Firm-Fixed Price Construction contract via an Invitation for Bid (IFB) in accordance with FAR Parts 14 and 36. The estimated contract value ranges between $0 and $1,000,000, with a period of performance of 183 calendar days following the issuance of the Notice to Proceed. This procurement is a set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 237130, which has a small business size standard of $45.0 million. To be considered responsive, offerors must be certified as an SDVOSB by the U.S. Small Business Administration (SBA) and be listed in the SBA’s Small Business Search (SBS) database prior to submission, adhering to 13 CFR Part 128 and VAAR 819.70. The tentative solicitation period is set for November 30 to December 30, 2026, with a tentative award date of January 20, 2027. Primary points of contact include Contracting Officer Makarim Abdul-Jabbar and Contracting Officer’s Representative Logan Dunn.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 16 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
Federal
Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information
Solicitation # MHMV200009-MHMV120009-MHMV08002
The U.S. Air Force 377th Contracting Division is seeking market intelligence via a Request for Information (RFI) for the demolition and construction of electrical substations at Kirtland Air Force Base, New Mexico. The project involves three primary efforts: the repair of Substation 9 and its feeders, the removal of Substation 23 with load connection to Substation 24A Feeder 5, and the demolition of Substation 3 to facilitate the rebuild of a modern 10,000 KVA consolidated Substation 10. The goal is to modernize the base electrical infrastructure with 12.47 kV distribution systems, eliminate single points of failure, and ensure regulatory compliance. The government is evaluating the feasibility of using a Progressive Design-Build (PDB) delivery method under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. 2808a. The scope of work requires a phased design approach, moving from conceptual design to a final 100% stamped construction document set, with a target completion date of May 2027 or sooner. Technical requirements include compliance with IBC, UFC 3-501-01, NFPA 70, and IEEE C2 standards, as well as strict adherence to Department of Defense cybersecurity protocols for electric meters. Contractors must provide a Critical Path Method schedule and engage an independent testing organization for system calibration. Key administrative requirements include the provision of performance bonds, adherence to Davis-Bacon wage rates, and strict environmental controls regarding hazardous materials and ozone-depleting compounds. Interested firms are requested to provide company profiles, relevant experience, and feedback on the proposed PDB-OTA acquisition strategy.
FA9401 377 Msg Pk

POSTED

about 16 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
Solicitation W91QVN27QA007 is a Firm Fixed Price request for quotations to provide non-personnel maintenance and repair services for 21 C4I Communication Tower sites and related facilities supporting the 41st Signal Battalion in South Korea. The scope of work includes structural integrity assessments, physical inspections for rust and damage, bonding and grounding tests, lighting protection maintenance, LED beacon and side marker light replacement, tower painting, and lead abatement. Specific facility repairs are limited to the interior and exterior of the Osan Bucket C4I Communication Shelter. The period of performance is a 12-month base period running from January 1, 2027, to December 31, 2027, across five primary locations: CP Walker, Highpoint, Osan Bucket, Yongsan, and Papyongsan. Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price technically acceptable offer. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and proof of mandatory ROK business licenses, specifically Information and Communication and Electrical Construction licenses. Key personnel requirements include a Contract Manager, a CQCSM/Safety Manager with an associate degree and five years of relevant experience, and a Lead Technical Engineer. All quotes must be submitted in Korean Won via PIEE by November 18, 2026, and must include both a detailed price breakdown and a completed SF 1449 pricing schedule. Performance will be monitored via a Quality Assurance Surveillance Plan and a Performance Requirements Summary to ensure compliance with NETCOM and Army regulations.
0411 Aq Hq Contract Augmented

POSTED

about 16 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
SLED
80627Y0173-Neighborhood Internet Installation at HPD Bronx Family Living Center
Solicitation # 80627Y0173
The New York City Department of Housing Preservation and Development is soliciting proposals for the Neighborhood Internet pilot project at the Bronx Family Living Center. The project involves installing a hybrid fiber/fixed wireless internet network, which includes retrofitting two neighboring buildings for hotel-style Wi-Fi service and installing rooftop antennas to establish one building as a wireless hub. The selected vendor must provide 1GB+ fiber backhaul service and ongoing network maintenance for a three-year term. Technical requirements specify that the network must be certified for Wi-Fi 6 (802.11ax) or newer and comply with Citywide Privacy Protection Policies and Protocols. This is a M/WBE Noncompetitive Small Purchase, meaning only New York City-Certified M/WBE firms are eligible to apply. The contract is estimated to be valued at or above $200,000, making Local Law 63 applicable. Proposals are evaluated primarily on experience, qualifications, and capacity (75% weight), specifically regarding residential wireless and hybrid fiber/wireless deployments. Subcontracting is limited to 40% of the total contract amount, with non-M/WBE subcontractors capped at 20%, though fiber backhaul providers are exempt from this limit. All submissions, including cost proposals and required affirmations regarding the Iran Divestment Act, Macbride Principles, and tax status, must be completed through the PASSPort system.
Department Of Housing Preservation And Development

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237130
New
SLED
Underground Utility District 38 Overhead-to-Underground Service Conversions
Solicitation # CS 09-26-07
Alameda Municipal Power (AMP) is soliciting bids for the Underground Utility District 38 Overhead-to-Underground Service Conversions project (CS 09-26-07). The primary objective is to safely convert 195 residential electrical services from overhead to underground routing without increasing customer capacity or modernizing existing customer-owned equipment, which will be reused if deemed safe by the City Building Division. The scope includes the installation of approximately 8,389 linear feet of aluminum service conductors across standard and 3-inch lateral locations. The project is expected to start around March 1, 2027, and must be completed within 365 calendar days of the Notice to Proceed. Eligible bidders must possess a valid California C-10 Electrical Contractor license and be registered with the Department of Industrial Relations. A mandatory virtual pre-bid meeting was held on November 5, 2026, and all bids must be submitted via the OpenGov Bid Portal by November 25, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on capacity, experience, and past performance. Required submissions include a 10% bid security, a subcontractor list, and a bid schedule. Once awarded, the contractor must provide performance and payment bonds for 100% of the contract price and adhere to the City of Alameda Project Stabilization Agreement to ensure labor harmony and prevailing wage compliance.
Engineering and Operations

POSTED

1 day ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS