Zero Emissions Port Electrification of Operations and Grid Reliability Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Zero Emissions Port Electrification of Operations and Grid Reliability Project, managed by the Los Angeles Department of Water and Power, is designed to expand electrical sub-transmission and distribution capacity at the Port of Los Angeles. This initiative supports the Clean Air Action Plan goals of achieving zero-emission cargo-handling equipment by 2030 and zero-emission trucks by 2035. The scope of work includes installing sixteen new 34.5 kilovolt underground distribution circuits, constructing three new switching stations, and installing a wet cooling tower at the Harbor Generating Station. Additionally, the project will expand the capacity of Receiving Stations Q and C to provide an additional 200 megavolt-amperes to ensure grid reliability and resilience during the transition to clean energy. Project execution is scheduled to occur between April 2026 and December 2030, with phased construction activities including demolition, foundation work, and commissioning across multiple sites such as Terminal Island, Harry Bridges, and the Outer Harbor. The project has undergone environmental review in compliance with the California Environmental Quality Act, resulting in a Negative Declaration stating that the project will not have a significant environmental effect. Coordination involves multiple agencies, including the Los Angeles Harbor Department and Caltrans, to manage permits for state right-of-way and oversized vehicle transportation.

General Info

LADWP expands Port of Los Angeles electrical capacity for zero-emission goals from 2026-2030.

Agency

California Los Angeles Department of Water and Power

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Harry Bridges and Fries Avenue, Los Angeles, CA, 90744

Set-Aside

NONE

Documents

(7)

Zero Emissions Port Electrification Project Draft MND Dec 2025

PDFenvironmental-assessment

Caltrans Comments on Zero Emissions Port Electrification Project MND

PDFcomment

2025120795_DTSC Comment

ZIP

Notice of Determination for Zero Emissions Port Electrification Project

PDFnotice-of-determination

ZEPEO-NOC_MC Zero Emissions Port Electrification Notice of Completion

PDFnotice-of-completion

ES25-0631 Notice of Intent for ZEPEO Project Mitigated Negative Declaration

PDFnotice-of-intent

ZEPEO Environmental Impact Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
Marshall CyrEnvironmental Specialist

Full Description

Show more
In 2017, the City of Los Angeles Harbor Department (LAHD) adopted the Clean Air Action Plan (CAAP) which outlined goals to make the Port of Los Angeles (POLA or Port) a global leader for cleaner air, sustainability, and innovation by electrifying port operations and reducing greenhouse gas emissions below 1990 levels by 40% in 2030 and 80% by 2050. POLA is expected to see increasing levels of electrical load growth and electrification as it adopts the CAAP zero-emission goals, zero-emission cargo-handling equipment (CHE) by 2030, and zero-emission trucks by 2035. CHE includes equipment that moves cargo (including cargo in containers, general cargo, and bulk cargo) to and from marine vessels, railcars, and on-road trucks. To support these goals, the Los Angeles Department of Water and Power (LADWP) proposes to expand the capacity of the electrical sub-transmission and electric distribution system within POLA, known as the Zero Emissions Port Electrification of Operations (ZEPEO) Project. LADWP proposes to increase the capacity of electricity distribution within the POLA by installing sixteen (16) new 34.5 kilovolt (kV) underground distribution circuits. Electricity is currently supplied to POLA through Receiving Station (RS) - Q located at the Harbor Generating Station (HGS); however, RS-Q and RS-C (located in Wilmington) will need to increase their electrical capacity to provide the additional 200 megavolt-amperes (MVA) needed for the established port electrification goals. To accommodate the estimated increase in load, LADWP is proposing to expand the capacity of RS-Q and RS-C , install three new switching stations, and construct a wet cooling tower within HGS to maintain existing generation capacity to ensure the reliability and resilience of the City of Los Angeles’s electrical power system while additional renewable generation, energy storage, distributed generation, and transmission system improvements are implemented, thereby facilitating the transition to a clean energy future. Project construction is anticipated to start in April 2026 and is anticipated to conclude in December 2030.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237130
New
Federal
Sources Sought for the Recapitalization of the Navy’s High Voltage (230kV) Transmission Loop and all Ancillary Equipment at Naval Submarine Base Kings Bay, GA
Solicitation # N69450-26-R-PW20
This sources sought notice seeks to identify qualified offerors for the wholesale recapitalization and cybersecurity hardening of the 230kV high voltage transmission loop and all ancillary equipment at Naval Submarine Base Kings Bay, Georgia. The project is envisioned as a design-build effort with an estimated magnitude between $100 million and $250 million and an anticipated period of performance of approximately 900 calendar days. Key technical requirements include the relocation of the high power loop and crossing tower, replacement of conductors, installation of smart motor-operated disconnects and vacuum/SF6 circuit breakers, and the modernization of substation digital protective relays. All telemetry and relay configurations must comply with NERC CIP standards and DoD Unified Facilities Criteria 4-010-06 for Industrial Control Systems. Due to the critical nature of the nuclear deterrent mission and the requirement for seamless integration with the Georgia Power Company (GPC) macro-grid, the government is considering this procurement under other than full and open competition. Potential sources must demonstrate significant financial capability, including a single project bonding capacity of $200 million, and possess specialized experience in 230kV live cutovers and cryptographic SCADA telemetry interconnection. Security requirements are stringent, requiring U.S. citizenship and at least Tier 3/Secret clearance for key personnel, including project managers and cybersecurity leads, to access restricted areas such as nuclear-support zones and the Defensive Ordnance Support Facility. Responses are due by 2:00 PM EDT on October 6, 2026, under NAICS codes 237130 or 221122.
Navfacsyscom Southeast

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS