Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Zone 3 And 4 Pump Station Upgrades And Hillsborough Pump Station Electrical Upgrades

Closed
20260908043State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The City of Newport Beach is soliciting bids for Contract No. 8893-2, which encompasses comprehensive upgrades to the Zone 3 and 4 Pump Stations and electrical improvements at the Hillsborough Pump Station. The scope of work for Zone 3 and 4 includes the removal and replacement of variable frequency drives, switchboards, switchgear, and motor control centers, as well as the installation of a new 480V 3-phase standby generator at Zone 4. Additionally, the project involves building modifications such as replacing HVAC systems and doors, rebuilding roofs and siding, and performing site improvements including the construction of CMU retaining walls, paving, and landscape restoration. At the Hillsborough Pump Station, the project focuses on electrical upgrades, including the installation of a new service entrance switchboard, manual transfer switch, 480V MCC, and lighting panel, along with the relocation and equipping of the PLC enclosure. The project requires comprehensive electrical, control, and SCADA programming, fiber optic improvements, and grounding updates. All materials in contact with potable water must strictly adhere to California potable water standards and NSF-61. Bidders must comply with prevailing wage requirements and DIR registration. Sealed electronic bids are due by September 23, 2026, at 10:00 AM. The contract is supported by detailed technical specifications, demolition and construction plans, and special provisions that outline project management, commissioning, and liquidated damages.

General Info

Newport Beach seeks bids for pump station electrical and structural upgrades by September 2026.

Place of Performance

Newport Beach, CA, 92625, USA

Set-Aside

NONE

Documents

7

C-8893-2 Demolition and Construction Plans, Zone 3 and 4

PDF, High priority: read this firstspecifications
High

C-8893-2 Hillsborough Pump Station Electrical Upgrades Plans

PDF, High priority: read this firstspecifications
High

C-8893-2 Notice Inviting Bids

PDF, High priority: read this firstifb
High

C-8893-2 Special Provisions – Project No. 23W14

PDF, High priority: read this firstspecial-provisions
High

C-8893-2 Technical Specifications

PDF, High priority: read this firstsow
High

EA26CNB165 Hillsborough Upgrade Scope of Work v2.0.0

PDF, High priority: read this firstsow
High

EA26CNB165 Zone 3 and Zone 4 Upgrade Scope of Work v2.0.0

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF NEWPORT BEACH
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Daniel Jordan

Full Description

Show more
Bid #8893-2: The project involves comprehensive upgrades to Zone 3 and 4 Pump Stations and electrical upgrades at Hillsborough Pump Station. Work includes removal and replacement of Variable Frequency Drives (VFDs), switchboards, switchgear, motor control centers, and the installation of a new 480V 3-phase standby generator at Zone 4. Building modifications include replacing doors, HVAC systems, and demolishing/rebuilding roofs and siding at Zone 3 and 4 pump stations. Site improvements such as CMU retaining walls, paving, and landscape restoration are also part of the scope. For Hillsborough, the project entails removing existing electrical service components and installing a new service entrance switchboard, manual transfer switch, 480V MCC, lighting panel, and relocating/equipping the PLC enclosure. All electrical, control, and SCADA programming, fiber optic, and grounding improvements are included. All potable water contact materials must comply with California potable water standards and NSF-61.

More opportunities from California → CITY OF NEWPORT BEACH

Same awarding agency

NAICS: 561730
SLED
Landscape Maintenance Services For Parks, Facilities, And The Civic Center
Solicitation # 27-13
The City of Newport Beach is soliciting proposals for a seven-year, time and expense not-to-exceed contract to provide comprehensive landscape maintenance for approximately 100 city parks and facilities, including the Civic Center, covering roughly 300 acres. The scope of work encompasses turf and plant care, minor tree pruning for trees under 15 feet, irrigation system monitoring and repair, and general grounds maintenance such as litter control and synthetic turf care. Contractors are required to maintain an office within a 30-minute response time of the city and adhere to the highest industry standards. Key deliverables include weekly irrigation tracking, monthly chemical use reports, and annual maintenance schedules. Proposals are due by November 2, 2026, via the PlanetBids portal and are evaluated through a two-step process focusing on firm qualifications, key personnel, project approach, and cost. To be considered, bidders must submit a response file, a mandatory cost file, a completed proposer questionnaire, and a signed insurance attestation form. Mandatory insurance includes Workers Compensation, General Liability, Automobile Liability, and Excess/Umbrella Liability, along with Labor and Materials and Faithful Performance bonds each totaling 100 percent of the annual contract amount. The project is subject to California State prevailing wage standards and requires the contractor to certify they are not debarred from public transactions.
Landscaping Services

POSTED

8 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS