Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Zuniga Jetty Shoals Marine Debris Removal

Forecast
2024-021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego Unified Port District

Place of Performance

Zuniga Jetty Shoals (West of Zuniga Jetty), San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Jolie GoblerAssistant Planner

Full Description

Show more
The San Diego Unified Port District (District) proposes the removal of marine debris located east of Zuniga Jetty in the Zuniga Jetty Shoals. Zuniga Jetty Shoals (Shoals) is located in the Pacific Ocean, south of the entrance to San Diego Bay and east of Zuniga Jetty (32.6746, 117.2234). Zuniga Jetty is a rubble-mount structure, built by the Army Corps of Engineers in the 1890’s, which extends approximately 1 mile offshore of Zuniga Point at Naval Air Station North Island. The Shoals consist of a free anchorage area which stretches over 900 acres. In August 2023, a sonar survey was conducted in the Shoals to identify the location of eelgrass and to identify debris. This survey identified 90 items of debris, ranging in size from approximately 5 to 1,300 square feet. Among the 90 identified debris items, 5 were confirmed sunken vessels, 13 were potential sunken vessels, and the remainder were smaller items noted as debris or within debris fields. Attachment 1 is a map of the identified marine debris, the location and approximate object size, including the side scan sonar image of the larger items of debris. Due to the low resolution of the side scan sonar image, 63 of the 90 items of debris were listed as “unknown debris” and 20 items of debris were identified as non-vessel debris. Therefore, a diver survey was conducted to characterize the presence, nature, extent (i.e., quantity/size, position), and condition of the debris. The results of this survey will help the District prioritize debris removal based on factors such as navigational hazards, the presence of hazardous waste, the feasibility of complete removal, and potential impacts on critical habitat. The District intends to remove the marine debris, starting with the debris characterized as “high priority,” before the end of June 2026, however more time may be needed pending the discovery of new debris and the availability of funding and other resources. Caltrans is funding the initial debris removal through a “Funds Transfer Agreement” to address sunken marine debris at the Shoals, and the District is also continuing to pursue other funding opportunities. In addition to debris removal, the Caltrans funding is covering the enforcement of anchoring limits in the area to prevent future marine debris from abandoned vessels. The District is in the process of soliciting a contractor to remove the debris with an anticipated start in Winter 2025. The contractor may use three methods of debris removal for this project. The method used for each debris location would depend on the conditions of the debris, including but not limited to: debris embeddedness, pieces versus whole vessels, and if vessel structural integrity will hold while being removed. The following debris removal methods may be used: 1. Float Bags: The Float Bag method is a buoyancy-based technique used to remove heavy or sunken debris from the seafloor. Divers would attach inflatable lift bags to sunken objects. The bags are then filled with air, creating lift that raises the debris to the surface. Floated debris would then be towed to the demolition area. This removal method is ideal for intact sunken vessels or large, heavy pieces of debris. 2. Basket Pick: The Basket Pick method is a technique that consists of lowering a large basket to the sea floor to allow divers to place small debris pieces into the basket. The basket would then be raised back to the surface, and debris would be placed onto a vessel to be transported for disposal. This removal method is ideal for small and lightweight pieces of debris. 3. Light Crane: The Light Crane method involves using a vessel-mounted crane to lift large or fragmented sunken debris, such as parts of broken-up vessels, from the seafloor. Divers would first secure debris sections with lifting slings or rigging. The crane then hoists each piece individually to the surface and onto the vessel for transport to disposal. This method is ideal for removing large, heavy debris in manageable sections, especially when structural integrity of sunken vessels is poor. The contractor would use 2-3 vessels to support the dive team for sunken debris removal. The contractor personnel would include 1 supervisor, 2 divers, and a number of other top-side crew members to handle the surfaced debris. It is anticipated that once debris removal begins, the contractor team would be on site approximately 3-5 days per week. The frequency of work and number of individuals on-site may vary depending on weather and oceanographic conditions. A boat launch would be used to transport the removed debris to land, then it would be towed off Tidelands to the contractor’s boatyard for dismantling, if necessary, and final disposal. Debris would be disposed per federal and state laws and regulations. Any waste generated would be transferred to storage containers and appropriately disposed of according to the Best Management Practices listed in further detail below. The contractor would identify and photograph each piece of debris removed, then prepare a report on the debris removal operations. The contractor would prepare and abide by a Best Management Practices plan to mitigate any impacts during debris removal operations. Best Management Practices will include: • Having on site and ready to use, petroleum spill equipment, booms, spill containment bins should the contractor encounter any liquids, oils, or chemicals during debris removal. Provider to ensure that wastes are separated, contained, and disposed of properly at a permitted facility. • Contractor shall provide a copy of their "Dive Safety Plan" if they propose to use divers. The "Dive Safety Plan" is to include measures to ensure boats are aware that divers are in the water and otherwise conform with all requirements of OSHA. • Survey results indicate the area of known eelgrass habitat within the project site. The contractor will abide by California Eelgrass Mitigation Policy, Section II.C Avoiding and Minimizing Impacts to Eelgrass. The contractor will be required to avoid anchoring or spudding in the eelgrass beds. Large debris, located within eelgrass habitat and which requires the use of a crane, will be performed by idling vessel (not anchored or spudded) and lift lines will be attached by in-water divers, taking the utmost care to protect eelgrass and benthic habitat. Most locations with eelgrass are shallow and eelgrass can often be seen from the surface, which should aid in the avoidance of damage to existing eelgrass beds • Turbidity resulting from debris removal is anticipated to be minimal and temporary. If surface turbidity is seen during debris removal operations, the contractor shall slow, reduce, or stop work until the turbidity has ceased. • If a sea turtle or marine mammal is seen within 100 meters of the active daily operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 20 meters of a sea turtle or marine mammal. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or marine mammal is seen within a 20-meter radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition or has not been re-sighted for 15 minutes. • The recovery of debris may involve the deployment of equipment that is tethered to the surface via lines or cables. To reduce the risk of entanglement in any lines, the crew will keep lines attached to sunken debris as taunt as possible and remove lines that are not in use. • The project will involve lifting submerged vessels and loose debris up the water column to be removed and disposed of at an appropriate upland location. At this time, the debris removal contractor has not been selected to confirm the methodology or tools involved. It is currently assumed that the debris removal will require the minimal use of underwater hand tools (e.g., drills) to attach crane lines or lift bags to the debris. Due to its nature and limited scope, the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 488390
New
Federal
AFIT/ENG-Cleanroom DI-RO Type I Ultra-Pure Water System
Solicitation # FA860127Q0027
The Air Force Life Cycle Management Center is conducting market research via a Sources Sought notice to identify qualified contractors for the preventative maintenance, service, and repair of the DI-RO Type I Ultra-Pure Water System at the Air Force Institute of Technology, Wright-Patterson Air Force Base, Ohio. The requirement involves providing all necessary personnel and equipment to maintain a system that supplies 18.2 Megohm, Type 1 water for cleaning and processing MEMS wafers. Key technical requirements include a minimum annual service involving the replacement of eight DI-RO water tanks and operational testing after every service call to ensure water quality standards are met. All work must adhere to RS Means 2026 standards and prohibit the use of Class I Ozone Depleting Substances. The anticipated contract will be structured as a Blanket Purchase Agreement consisting of one base year from December 15, 2026, through September 30, 2027, with five subsequent 12-month option years. A 30-day phase-in and phase-out period is required. Interested parties must be registered in the System for Award Management and provide a capability package including their CAGE code, UEI, and socio-economic status under NAICS code 488390. Mandatory requirements include CMMC Level 1 self-certification recorded in the Supplier Performance Risk System. Responses are due by November 23, 2026, at 11:00am Eastern Time. While a set-aside decision has not yet been made, the government is considering a small business set-aside based on the capabilities demonstrated in the responses.
FA8601 Aflcmc Pzio

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 488390
New
International
Provision of a mobile barge system to support a crane and log lifter (approx. 10-ton) to allow PCA to complete the log lifter swap at Dam 11
Solicitation # 5P300-26-0186/A
Parks Canada Agency is soliciting quotations for the provision of a mobile barge system and an appropriately sized crane to facilitate a log lifter swap at Dam 11 in Campbellford, Ontario. The contractor is responsible for providing and assembling the barge in sections at lock 13, transporting a refurbished 10-ton log lifter to the site, installing it on the dam deck rails, and removing the existing unit for transport via a Parks Canada provided truck. The scope includes providing a stamped stability analysis within one week of the project award. There is also an option for identical work at Pretty Channel Dam, subject to written authorization. The contract period extends from the date of award until March 31, 2027. Bids must be submitted by November 10, 2026, exclusively via email to [email hidden] or by fax to [phone hidden], as submissions via SAP Ariba, courier, or in-person will not be accepted. The contract will be awarded to the compliant offer with the lowest evaluated price in Canadian dollars. Requirements include Commercial General Liability Insurance of at least 2 million dollars per accident or occurrence. All work must comply with the National Park Act and industry quality assurance standards. This solicitation is subject to the Policy on Reciprocal Procurement, limiting eligibility to Canadian suppliers and those from applicable trading partners.
Parks Canada Agency

POSTED

6 days ago

DEADLINE

in 2 days
View Details
NAICS: 488390
New
International
Scientific Diving Services
Solicitation # 5000095016
Environment and Climate Change Canada is soliciting proposals for scientific diving services to perform routine annual maintenance, unscheduled repairs, and cleaning of water intakes at six water quality monitoring stations located in the connecting waterways of the Great Lakes. The scope of work includes underwater repairs, equipment recovery, and specialized sampling of algae and mussels at various depths across Lake Erie, Lake Ontario, and Lake Huron. A critical requirement for the Thames River task is the provision of a Transport Canada registered, sea-worthy support vessel equipped with a hoist capable of lifting 800 pounds from a depth of 12 meters. All diving personnel must be certified and medically fit in accordance with Ontario Regulation 629/94 and CSA standards Z275.4 and Z275.2. The contract is structured with an initial term ending March 31, 2027, followed by three optional extension years through March 31, 2030. Selection will be based on a weighted evaluation where technical merit accounts for 60 percent and price accounts for 40 percent of the total score. To be compliant, bidders must meet all mandatory technical criteria and achieve a minimum of 16 points in the point-rated technical evaluation. The solicitation is open to bidders under various international trade agreements and encourages participation from under-represented groups. Following several amendments, the final bid closing date is November 26, 2026, at 15:00 ET, with submissions directed to the designated electronic address.
Department of the Environment (ECCC )

POSTED

6 days ago

DEADLINE

in 18 days
View Details
NAICS: 488390
SLED
Derelict Vessel Removal Service Continuing Contract (Disaster)
Solicitation # 26-067
The City of Fort Myers is soliciting proposals for a continuing contract for derelict vessel removal services to be utilized during disaster response scenarios, such as those following Hurricane Ian. The scope of work requires the contractor to provide all labor, equipment, and materials for the stabilization, towing, lifting, transportation, and lawful disposal of abandoned vessels, including boats, personal watercraft, airboats, barges, and floating docks, as well as associated debris within a 300-foot radius. Operations must adhere to strict environmental and safety standards, including FDEP Best Management Practices to prevent turbidity and ADCI, OSHA, and IMCA standards for commercial diving operations. Contractors are required to maintain comprehensive insurance coverage, including Commercial General Liability, Professional Liability Marine Coverage, and Pollution Liability. Proposals must be submitted electronically via the OpenGov portal by November 10, 2026. Evaluation is based on a points system, with a significant emphasis on relevant experience and past performance, specifically requiring a minimum of two completed hurricane-related projects of similar size and scope. The contract is subject to federal funding guidelines, including compliance with 2 C.F.R. Part 200, the Davis-Bacon Act for construction services exceeding 2,000 dollars, and Build America, Buy America requirements. Pricing is based on a line-item fee schedule featuring a unit price per linear foot for removal and disposal, along with flat-rate mobilization fees for both standard and emergency response windows.
Emergency Management (Fire)

POSTED

10 days ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS