Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

NAICS 221122: Electric Power Distribution

NAICS 221122

NAICS 221122 – Electric Power Distribution covers the delivery of electricity from transmission systems to end-use customers through distribution networks, including the installation, maintenance, and operation of poles, wires, transformers, substations, metering systems, and protective equipment. This sector supports critical infrastructure resilience, ensuring reliable power delivery to federal facilities, military installations, and emergency response sites.

Dotted
NAICS 221122 FAQ

Frequently Asked Questions

NAICS code 221122 covers Electric Power Distribution. This U.S. industry comprises electric power establishments primarily engaged in either (1) operating electric power distribution systems (i.e., consisting of lines, poles, meters, and wiring) or (2) operating as electric power brokers or agents that arrange the sale of electricity via power distribution systems operated by others. Cross-References. Establishments primarily engaged in--

Recently Posted in Electric Power Distribution

NAICS: 221122
New
SLED
Advanced Metering Infrastructure (AMI)
Solicitation # 20261124047
The City of Gridley Electric Department is soliciting proposals for a new Advanced Metering Infrastructure (AMI) system to serve approximately 3,050 electric meters and 2,300 water meters in Gridley, California. The selected supplier will be responsible for system design, network equipment installation, SaaS turn-up, system integration with Tyler, testing, and end-user training. Key technical requirements include AES256 encryption, support for various Home Area Network (HAN) protocols, and compliance with the UL 2735 safety standard for electric utility meters. The project involves a targeted 18-month deployment starting with a project kick-off in April 2027, featuring a phased rollout that includes an Initial System Acceptance Test (ISAT) and a Final System Acceptance Test (FSAT). The estimated total one-time cost for the project is $402,218. Proposals will be evaluated by a cross-departmental team using a weighted scoring system, with the level of perceived risk accounting for 30% of the evaluation. Suppliers must provide comprehensive documentation, including a wireless propagation study, a project schedule, and a Statement of Work. All meters must feature specific factory markings, including serial numbers, barcodes, and the NSF 61 mark. There is no specified set-aside status for this solicitation. Proposals must be submitted via email to Ryan Carlson and Rick Schmidt by the December 7, 2026, deadline.
City of Gridley Electric Department

POSTED

3 days ago

DEADLINE

in 9 days
View Details

Win Contracts in Electric Power Distribution

Get AI-powered intelligence on NAICS 221122 procurement

Real-time contract opportunities for NAICS 221122 (Electric Power Distribution)

AI-powered matching based on your business capabilities and past performance

Competitive analysis of contractors winning awards in this industry

Automated alerts when new opportunities are posted

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS