Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

NAICS 237130: Power and Communication Line and Related Structures Construction

NAICS 237130

NAICS 237130 – Power and Communication Line and Related Structures Construction covers the installation, maintenance, and repair of electrical transmission and distribution lines, telecommunications infrastructure, and associated support structures such as poles, towers, conduits, and right-of-way clearances. This sector includes the construction of overhead and underground power lines, fiber optic cable networks, and related substations or switching stations critical to national energy and communications resilience.

Dotted
NAICS 237130 FAQ

Frequently Asked Questions

NAICS code 237130 covers Power and Communication Line and Related Structures Construction. This industry comprises establishments primarily engaged in the construction of power lines and towers, power plants, and radio, television, and telecommunications transmitting/receiving towers. The work performed may include new work, reconstruction, rehabilitation, and repairs. Specialty trade contractors are included in this industry if they are engaged in activities primarily related to power and communication line and related structures construction. All structures (including buildings) that are integral parts of power and communication networks (e.g., transmitting towers, substations, and power plants) are included. Illustrative Examples: Alternative energy (e.g., geothermal, ocean wave, solar, wind) structure construction Power line stringing Cellular phone tower construction Radio transmitting tower construction Co-generation plant construction Satellite receiving station construction Communication tower construction Nuclear power plant construction Telephone line stringing Electric light and power plant (except hydroelectric) construction Transformer station and substation, electric power, construction Electric power transmission line and tower construction Underground cable (e.g., fiber optic, electricity, telephone, cable television) laying Cross-References. Establishments primarily engaged in--

Recently Posted in Power and Communication Line and Related Structures Construction

NAICS: 237130
New
Federal
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
This contract is for the construction of a concrete test pavement at the William J. Hughes Technical Center for Advanced Aeronautics in Atlantic City, New Jersey, supporting the Federal Aviation Administration's Pavement Research and Development Section. The scope of work includes the controlled demolition of existing pervious runway pavement, minor design adjustments, and the construction of new concrete test slabs and pavement structures. The project involves providing aggregate subbase, updating the asphalt base course to a stabilized drainable base course, and managing a test area of approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. The subcontractor is responsible for procuring materials, removing construction waste, and providing engineering and testing services, including geotechnical design and roadway materials testing. Key performance tests include the California Bearing Ratio, Plate Load, Heavy/Falling Weight Deflectometer, and Dynamic Cone Penetrometer. This is a Small Business set-aside, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. Work is generally scheduled during normal business hours, Monday through Friday, with some flexibility for after-hours and weekend operations.
Parsons Corporation

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
Ffa Last Mile Project Phase 2
Solicitation # IT-FIBER25
The FFA Last Mile Project Phase 2 (IT-FIBER25) is a public works construction project for the City of Indio, California, focused on the installation of a fiber optic network. The scope of work includes the installation of 1” and 2” HDPE roll conduit, vaults, directional boring, micro-trenching, and machine cut open trenching, as well as the installation of underground fiber cable with slack and splicing. The project also requires asphalt and concrete removals and replacements, with final site restoration and cleanup. The contract is awarded to the lowest responsive bidder based on the sum of the Base Bid and Schedule A. To be considered responsive, bidders must hold a valid Class A General Engineering Contractor license and demonstrate at least three consecutive years of experience in fiber optic outside-plant construction using permanent employees. Performance is divided into two phases: material procurement must be completed within 20 calendar days of the first Notice to Proceed, and construction must be completed within 180 working days of the second Notice to Proceed. The project is subject to the Build America, Buy America Act and requires compliance with prevailing wage rates under Labor Code Section 1770. Contractors must provide faithful performance and payment bonds equal to the contract price and maintain required insurance, including Workers’ Compensation. Invoicing is managed through a Leidos Project Coordinator who reconciles monthly preliminary invoices using Daily Production Reports. Payment is contingent upon the City Council appropriating sufficient funds for the fiscal year.
City of Indio

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
SLED
RFP- Fiber to the Home Aerial/Underground Construction
Solicitation # CNSNEXT-FTTH-2026-001
The South Georgia Governmental Services Authority, doing business as CNSNext, is soliciting competitive sealed proposals for the construction of fiber to the home outside plant in the Thomasville service area (OLT 12). This project, conducted under a unit-price construction agreement without federal funding, involves both aerial and underground construction. Key technical requirements include directional boring, the placement of HDPE duct, handholes, and pedestals, as well as the installation of approximately 23,000 feet of fiber in conduit and 298,600 feet of aerial fiber lashed to strand. The scope also encompasses fusion splicing and the installation of splice closures, distribution terminals, and splitters. The contract will be awarded to the responsible and responsive offeror whose proposal is most advantageous to SGGSA, with evaluation factors including price and the qualifications and experience of the firm and key personnel. Proposals must be submitted by December 22, 2026, and must include a bid bond of at least five percent of the total evaluated price, a notarized Contractor Affidavit under O.C.G.A. § 13-10-91, and a Non-Collusion Affidavit. Upon award, the contractor must provide performance and payment bonds at 100 percent of the contract amount. The agreement includes a two-year warranty after final completion, a five percent retainage on progress payments, and a requirement that claims for additional time or money be noticed within 21 days. There is no set-aside status specified for this procurement.
South Georgia Governmental Services Authority

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Win Contracts in Power and Communication Line and Related Structures Construction

Get AI-powered intelligence on NAICS 237130 procurement

Real-time contract opportunities for NAICS 237130 (Power and Communication Line and Related Structures Construction)

AI-powered matching based on your business capabilities and past performance

Competitive analysis of contractors winning awards in this industry

Automated alerts when new opportunities are posted

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS