Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

NAICS 332410: Power Boiler and Heat Exchanger Manufacturing

NAICS 332410

NAICS 332410 – Power Boiler and Heat Exchanger Manufacturing encompasses the design, fabrication, and assembly of industrial-scale power boilers and heat exchangers used in energy generation, thermal processing, and utility-scale heating systems. These critical components are engineered to transfer heat efficiently under high-pressure and high-temperature conditions, often constructed from alloy steels, stainless steels, and specialized alloys to meet ASME Boiler and Pressure Vessel Code standards.

Dotted
NAICS 332410 FAQ

Frequently Asked Questions

NAICS code 332410 covers Power Boiler and Heat Exchanger Manufacturing. This industry comprises establishments primarily engaged in manufacturing power boilers and heat exchangers. Establishments in this industry may perform installation in addition to manufacturing power boilers and heat exchangers. Cross-References. Establishments primarily engaged in--

Recently Posted in Power Boiler and Heat Exchanger Manufacturing

NAICS: 332410
New
DIBBS
RING, PISTON
Solicitation # SPE8E8-27-T-0862
Solicitation SPE8E8-27-T-0862, issued by the Defense Logistics Agency Troop Support Construction & Equipment, is a request for the procurement of one piston ring (NSN 2825-00-232-6985). The item must be manufactured from Ni-Resist material per Koppres Co. Inc. Spec K6B or a similar material with specific chemical composition tolerances. Technical specifications require a minimum diameter of 12.000 inches and a maximum of 12.005 inches, an outer diameter as compressed on cylinder between 0.380 and 0.390 inches, and a gap between 0.040 and 0.50 inches. The contractor must maintain a calibration system meeting ANSI/NCSL Z540-1-1994 or ISO 10012-1 standards. This acquisition is conducted under full and open competition with no set-aside used. Delivery is required within 20 days after order, with the destination being the USS Harry S Truman CVN 75 at FPO AE 09524. Packaging and marking must comply with MIL-STD-129, MIL-STD-2073-1E, and RP001 requirements. Quality assurance and sampling shall follow MIL-STD-1916 or ASQ H1331, Table 1. The contract prohibits the use of class I ozone-depleting chemicals and the intentional addition of mercury or mercury-containing compounds per NAVSEA 5100-003D. Administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and payment, and compliance with the Berry Amendment and Buy American Act.
Defense Logistics Agency

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Win Contracts in Power Boiler and Heat Exchanger Manufacturing

Get AI-powered intelligence on NAICS 332410 procurement

Real-time contract opportunities for NAICS 332410 (Power Boiler and Heat Exchanger Manufacturing)

AI-powered matching based on your business capabilities and past performance

Competitive analysis of contractors winning awards in this industry

Automated alerts when new opportunities are posted

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS