Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

2CMD, INC.

UEI: FF7VQ1JNQTA5

2CMD, INC. is a federal contractor, registered under UEI FF7VQ1JNQTA5. It has been awarded $12,618,087 across 25 federal contracts. Primary work spans Commercial and Institutional Building Construction, Water and Sewer Line and Related Structures Construction, and Other Heavy and Civil Engineering Construction. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

FF7VQ1JNQTA5

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Defense$12.6M100%
Awards by NAICS
236220 - Commercial and Institutional Building Construction$7.5M59.4%
237110 - Water and Sewer Line and Related Structures Construction$1.8M14.6%
237990 - Other Heavy and Civil Engineering Construction$1.2M9.6%
237310 - Highway, Street, and Bridge Construction$863.3K6.8%
236210 - Industrial Building Construction$759.1K6%
238990 - All Other Specialty Trade Contractors$349.0K2.8%
238210 - Electrical Contractors and Other Wiring Installation Contractors$93.1K0.7%
Others - Other NAICS codes (1 codes, <0.5% each)$7.0K0.1%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in 2CMD, INC.'s top NAICS codes and agencies

NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive modernization and safety enhancement initiative for the airfield infrastructure at the Port of Seattle, targeting critical systems including electrical circuits, pavement, utilities, wildlife hazard mitigation, and fire hydrant access points. It includes the replacement of airfield lighting circuits that exhibit low megger readings with new LED fixtures and signage to improve energy efficiency, reliability, and visibility. Simultaneously, deteriorating pavement sections and essential underground utilities will be removed and replaced to ensure structural integrity and operational continuity. Wildlife hazard management efforts will involve the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and the regrading of surfaces coupled with new storm drainage infrastructure to eliminate ponding and reduce attractants for wildlife. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response personnel. All work is coordinated under the broader Airfield 2028 initiative, aimed at long-term airport safety and compliance, with the Port of Seattle’s Aviation Project Management Group overseeing execution and serving as the primary point of contact.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance with modern aviation standards. Key work includes replacing aging airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility and reduce maintenance costs. Simultaneously, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation is a major component, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter birds, and the regrading of problem areas along with new storm drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, the contract requires the replacement of deteriorating flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency response personnel. All work is coordinated under the project title AIRFIELD 2029 ALL PROJECTS and falls under NAICS code 237990 for other heavy and civil engineering construction. The solicitation was posted on July 27, 2026, by the Aviation Project Management Group, with Yanet Maldonado serving as the primary point of contact for inquiries. While no set-aside details are specified, the scale and complexity of the work indicate a significant investment in airfield modernization aimed at long-term safety and operational continuity.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Checkpoint Security Grill Replacement - DBBThe Port of Seattle through its Aviation Project Management Group is seeking full-service contractor support for the replacement of the Checkpoint 5 security grill, encompassing end-to-end design, permitting, and construction. The project requires compliance with TSA CRPG Section 3-5 standards and includes comprehensive site assessment, development of detailed design drawings and specifications, and submission for all necessary regulatory approvals. The selected contractor will be responsible for the safe removal and proper disposal of the existing grill, fabrication of a new system, and its precise installation while seamlessly integrating with existing structural, electrical, and security badge access infrastructure. All work must be executed with minimal disruption to operational activities and in close coordination with relevant stakeholders to maintain security and operational continuity. The procurement is categorized under NAICS code 236220 for Commercial and Institutional Building Construction, and the opportunity is posted as a forecast with no set-aside designation. Primary point of contact for inquiries is Yanet Maldonado, with Collette Deardorff serving as the project manager. All communications and submissions should be directed through the provided contact information, and further details are available via the official Port of Seattle solicitation portal. Contractors are expected to demonstrate proven experience in security infrastructure projects within aviation environments and to adhere strictly to federal compliance and safety requirements throughout all phases of the endeavor.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Fleet Fast EV Charging - ConstructionThe Port of Seattle’s Aviation Project Management Group has issued a forecast for a fleet fast EV charging construction project, targeting the development of infrastructure to support electric vehicle charging for airport and fleet operations. The project is classified under NAICS code 237310, indicating it involves electrical and other construction work related to utility systems, with no set-aside provisions specified. The anticipated timeline suggests the solicitation will be issued in the near future, with the public notice posted on July 27, 2026. Performance of the work is expected to occur at Port of Seattle facilities, though specific location details are not yet defined. Primary point of contact for inquiries is Angela Peterson, reachable via phone or email, with Katie Techa serving as the project manager for technical coordination. Potential bidders are directed to the official portal for updates and eventual solicitation documents as the project progresses. While this is currently a forecast and not an active solicitation, it signals the Port’s imminent intent to procure construction services for high-capacity electric vehicle charging systems, potentially involving multiple charging stations, power supply upgrades, and integration with existing fleet operations infrastructure. All interested parties are encouraged to monitor the provided link for formal notices and requirements.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the design, permitting, and construction of a new camera system across the Bagwell and North Cargo Operations areas of the Port of Seattle to enhance operational security and enforcement capabilities. The project will replace and expand existing surveillance infrastructure by installing 50 high-resolution cameras at 43 distinct locations, focusing on critical traffic routes such as main terminal drive lanes and entrances that currently lack adequate coverage. These upgrades are intended to improve forensic investigation outcomes and support compliance with the Port’s movement rules and regulations through clearer, more reliable video evidence. In the Bagwell area, camera placement will be optimized to monitor key access points previously overlooked, while the North Cargo operations will benefit from flexible, user-controlled Pan Tilt Zoom units that provide broad surface area monitoring with dynamic viewing capabilities. This approach ensures comprehensive coverage across diverse terrain and operational zones, allowing real-time adaptability for security personnel. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams overseeing execution, and is classified under NAICS code 238210 for electrical and wiring installations.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract entails a comprehensive upgrade of airfield infrastructure at the Port of Seattle, focusing on improving safety, efficiency, and compliance with modern aviation standards. Key work includes replacing aging airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to enhance visibility and reduce maintenance demands. Simultaneously, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation measures will be implemented by eliminating turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signage, and addressing ponding issues through regrading and new storm drainage infrastructure to deter bird activity and improve water management. Additional scope includes the replacement of deteriorated flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency response. The project is cataloged under NAICS code 237990 and is managed by the Aviation Project Management Group under the Port of Seattle, with Moraa Omwega as the primary point of contact and David Neds serving as project manager. While the solicitation is currently listed as a forecast with no formal bidding number, the posting date indicates it is being prepared for future procurement, with work expected to commence ahead of the 2027 timeframe. All activities are designed to enhance airfield safety, regulatory compliance, and long-term operational efficiency.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Rental Car Facility (RCF) Customer Service Building (CSB) Re-DemisingThe Port of Seattle’s Aviation Project Management Group is preparing to revise the Rental Car Facility Customer Service Building to align with a forthcoming Concession Agreement and enable tenant construction beginning June 1, 2027. Key renovations include updating wayfinding signage to reflect new tenant layouts, constructing a new break room and flex space to support transit operations, and renovating existing restrooms within the Customer Service Building. Additional infrastructure upgrades involve replacing outdated car wash equipment in Quick Turn Around areas, installing new expansion joints on the fifth floor plaza, and performing structural repairs to address cracking and repair post-tension cables to ensure building integrity. These modifications are critical to enhancing functionality, safety, and operational efficiency in alignment with future tenant needs. The contract is forecasted under NAICS code 236220 for commercial and institutional building construction and is managed by the Port of Seattle. Primary point of contact is Angela Peterson, reachable via email and phone, with Julia Ruzon serving as Project Manager. While no solicitation number has been assigned yet and the official posting date is July 27, 2026, all activities are planned to support the start of tenant construction in mid-2027. The work will be conducted at the Rental Car Facility in Seattle and is intended to modernize facilities to meet evolving operational demands under the upcoming concession agreement.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle’s Aviation Project Management Group is soliciting bids to replace the existing aqueous film-forming foam (AFFF) fire suppression system at the Rental Car Facility in SeaTac, which contains per- and polyfluoroalkyl substances (PFAS). The project requires complete removal of the contaminated foam and associated components, followed by the design and installation of a new full dry chemical fire suppression system. This includes new storage tanks, valves, pumps, piping, sprinkler heads, and reserve tanks, all of which must be integrated with the facility’s existing fire alarm system. The work is part of a quick turnaround initiative aimed at eliminating hazardous PFAS materials and upgrading safety infrastructure to modern standards. The solicitation, titled Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid), is classified under NAICS code 238210 for fire protection system installation. The project is set for release in July 2026, with primary coordination handled by Todd Rehm and project management led by Pat Nakamura. All work must comply with site-specific safety and environmental protocols, and contractors are expected to manage the safe disposal of contaminated materials while ensuring minimal disruption to facility operations. The exact location for performance is 3150 S 160th Street, SeaTac, and further details are available through the Port of Seattle’s solicitation portal.
Aviation Project Management Group

POSTED

about 12 hours ago

DEADLINE

N/A
View Details