Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

3-GIS, LLC

3-GIS, LLC is a federal contractor, registered under UEI TMMQUCM5MTR9. It has been awarded $312,912 in federal contracts. Primary work spans Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) and Software Publishers. Top awarding agencies include Department Of The Interior (doi), Department Of Energy, and Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

TMMQUCM5MTR9

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

5

All time

Active

0

Currently performing

Completed

5

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with 3-GIS, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for 3-GIS, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in 3-GIS, LLC's top NAICS codes and agencies

NAICS: 332999
New
“LOT 2 BUBBLER ASSEMBLIES FOR HANFORD
Solicitation # 390565
Hanford Tank Waste Operations and Closure, LLC (H2C) is soliciting proposals for a Firm Fixed Price subcontract under solicitation 390565 to provide Lot 2 Bubbler Assemblies for the Hanford WTP LAW Melter. This effort supports Prime Contract 89303324DEM000096 with the U.S. Department of Energy, Hanford Field Office. The scope of work is divided into four primary tasks: the fabrication of bubbler assemblies (including leg alignment and revised gaskets), procurement of Alloy 690 and buffer stock, lifting feature adapter assemblies, and modular bubbler assembly stands. Platinum inserts are explicitly excluded from the scope. The expected award date is January 25, 2027, with a desired completion date of October 31, 2028. Award will be granted to the offeror providing the lowest price technically acceptable proposal, based on an evaluation of technical capabilities, qualifications, and pricing. Proposals must be submitted by November 30, 2026, and must include a detailed fabrication plan, personnel resumes, and a comprehensive price proposal with hourly rate breakdowns. Key compliance requirements include registration in the System for Award Management (SAM), adherence to the Buy American Act, and E-Verify enrollment. The contract mandates strict quality standards, including ASME, ASTM, and ANSI specifications, with all welding qualified to AWS or ASME requirements. Items are subject to inspection at the supplier's facility by an H2C representative, and strict packaging and marking protocols are required to prevent corrosion and damage during transit to the Richland, Washington delivery site.
Department Of Energy

POSTED

3 days ago

DEADLINE

in 30 days
View Details
NAICS: 236220
New
Federal
Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility
Solicitation # W911KB29RWP01-A
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for two military construction projects at JBER-Richardson, Alaska, with a combined estimated target budget of approximately 182.5 million dollars. The first project, the Pallet Processing Facility (JBR041), has a target budget of 79.5 million dollars to create a 52,000 square foot, all-weather, 24-hour facility that will serve as the sole hazardous cargo processing point and consolidated alert final preparation and holding area at JBER. The second project, the Rapid Deployment Facility (JBR044), has a target budget of 103 million dollars and consists of a complex to support pre-deployment and redeployment for a Brigade Combat Team (Airborne), featuring a Passenger Shed for personnel processing and a Joint Inspection Facility equipped with vehicle inspection lanes, an indoor wash rack, and a covered defuel point. Both facilities require specialized cold climate design for Climate Zone 7, cybersecurity for four platforms, sustainability measures, and comprehensive site improvements including utilities and storm drainage. The anticipated period of performance spans fiscal years 2029 through 2032, with design starting in the first quarter of FY29 and a 24-month construction period beginning in FY30. This current action is a sources-sought effort to gather industry feedback on the most effective project delivery methods, such as CM@Risk or Design-Build, and to evaluate industry capabilities regarding arctic adaptation and schedule risks.
Department Of Defense

POSTED

3 days ago

DEADLINE

in 5 days
View Details