Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

ADVANCED CONSTRUCTION TECHNIQUES INC.

UEI: GSXUNWLNZML2CAGE: 5KWT0

ADVANCED CONSTRUCTION TECHNIQUES INC. is a federal contractor, registered under UEI GSXUNWLNZML2 and CAGE code 5KWT0. It has been awarded $16,399,408 in federal contracts. Primary work spans Other Heavy and Civil Engineering Construction. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

GSXUNWLNZML2

CAGE Code

5KWT0

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationForeign Owned

NAICS Codes

237990Other Heavy and Civil Engineering Construction(Primary)
238110Poured Concrete Foundation and Structure Contractors
238990All Other Specialty Trade Contractors

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

ADVANCED CONSTRUCTION TECHNIQUES INC. specializes in specialized construction and infrastructure execution services under NAICS 237990, which encompasses other heavy and civil engineering construction. The firm delivers complex civil works requiring advanced methodologies, including site preparation...

ADVANCED CONSTRUCTION TECHNIQUES INC. specializes in specialized construction and infrastructure execution services under NAICS 237990, which encompasses other heavy and civil engineering construction. The firm delivers complex civil works requiring advanced methodologies, including site preparation, earthmoving, grading, utility relocation, and structural foundations for public infrastructure projects. Their technical expertise lies in precision earthwork, erosion and sediment control systems, and the application of non-traditional construction techniques to meet stringent regulatory and environmental compliance standards. Key differentiators include adaptive project execution in constrained urban or environmentally sensitive settings, with an emphasis on minimizing disruption and maximizing long-term asset durability. No award history is available to confirm specific agency relationships, so no definitive patterns of engagement with federal, state, or local entities can be inferred. Similarly, without recent contract data, it is not possible to identify vertical specializations or recurring project types tied to particular government missions. The company’s primary industry focus is heavy civil engineering construction, encompassing non-building infrastructure such as transportation corridors, drainage systems, and site development for public works. This places them in a niche market requiring high-skill labor, specialized equipment, and adherence to DOT, EPA, and OSHA standards for large-scale earthwork and grading operations. ADVANCED CONSTRUCTION TECHNIQUES INC. is structured as a 2L entity headquartered in Wilmington, Delaware, indicating a small business classification under federal sizing standards. The company holds no government-recognized certifications such as 8(a), HUBZone, or WOSB. Its geographic presence is limited to its Delaware base, with no public data indicating multi-state operations or federal market positioning beyond its NAICS classification. The firm’s market positioning appears to be that of a regional civil contractor focused on technical execution rather than broad federal program participation.

Key Performance Metrics

Awards Count

1

All time

Active

0

Currently performing

Completed

1

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with ADVANCED CONSTRUCTION TECHNIQUES INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ADVANCED CONSTRUCTION TECHNIQUES INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ADVANCED CONSTRUCTION TECHNIQUES INC.'s top NAICS codes and agencies

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 16 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237990
New
SLED
Capital Improvement Project No. 24-99 Downtown Downey Gateway Sign Installation
Solicitation # 24-99
Capital Improvement Project No. 24-99 is a solicitation by the City of Downey, California, for the furnishing and installation of an overhead gateway sign and associated infrastructure at the intersection of Firestone Boulevard and Downey Avenue. The scope of work includes the fabrication and installation of the sign, construction of electrical service connections to a new metered pedestal and sign post, and various site improvements such as sidewalk restoration, placement of new pavers, irrigation line re-routing, and the removal and disposal of existing trees. All work must adhere to approved shop drawings and structural plans, with specific requirements for electrical labeling to comply with UL 969 standards and the removal of all USA markings upon completion. The project follows a two-stage performance schedule: the contractor must order equipment upon the first Notice to Proceed and may begin field work 20 working days prior to the delivery of the final equipment, with a total of 40 working days allotted to complete all contract work. Bids are evaluated based on the lowest responsible bidder, considering equalizing factors like transportation and installation costs, while unbalanced bids may be rejected. Payment is based on contract unit prices, and force-account work requires detailed invoices submitted within 15 days of completion. Contractors must comply with California prevailing wage laws, provide public liability and workers compensation insurance, and submit a notarized proposal including a noncollusion affidavit and site inspection certification via the city's online vendor portal.
City of Downey

POSTED

about 16 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. The scope of work includes grading, fill placement, compaction, asphalt work, and the installation of erosion and sediment controls. The project is estimated at approximately 6.88 million dollars and is to be performed on a lump sum and unit price basis. The expected period of performance is 180 days from the Notice to Proceed, with a two-year guarantee on all work and materials from the date of final acceptance. Bidders must adhere to strict submission requirements via the OpenGov Portal, with the final response deadline extended to November 13, 2026. The contract mandates significant MWBE participation goals, specifically 31 percent for MBE, 11 percent for WBE, and 2 percent for SDVOSB. Financial security is required through a 5 percent bid bond, followed by 100 percent performance and materialmen's bonds upon award, and a potential two-year maintenance bond upon completion. Liquidated damages for delays beyond the substantial completion date are set at 500 dollars per calendar day. Technical compliance includes adherence to VOSH standards for excavation and specific Maryland Department of the Environment guidelines for waterway construction.
Engineering

POSTED

about 18 hours ago

DEADLINE

in 17 days
View Details