Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

ALL WEST EQUIPMENT CO.

UEI: L8AFH1G9XE39

ALL WEST EQUIPMENT CO. is a federal contractor, registered under UEI L8AFH1G9XE39. It has been awarded $2,800,926 in federal contracts. Primary work spans Other Heavy and Civil Engineering Construction, Industrial Valve Manufacturing, and Fluid Power Cylinder and Actuator Manufacturing. Top awarding agencies include Department Of The Interior (doi) and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

L8AFH1G9XE39

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

12

All time

Active

0

Currently performing

Completed

12

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Compete with ALL WEST EQUIPMENT CO.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ALL WEST EQUIPMENT CO.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ALL WEST EQUIPMENT CO.'s top NAICS codes and agencies

NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers New Orleans District is soliciting bids for the Lake Pontchartrain and Vicinity Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm-fixed-price contract, under NAICS code 237990, has an estimated construction magnitude between $25,000,000 and $100,000,000. The scope of work covers Reaches 1, 2, 3, and 4 and includes demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextile, placing stone, and turf establishment and maintenance. The project requires adherence to EM 385-1-1 safety standards and the MUTCD for traffic control. The bid submission deadline has been extended to October 27, 2026, at 10:00 a.m., with the bid opening scheduled for 11:00 a.m. The contractor must commence work within 10 calendar days of the notice to proceed and complete all base work within 300 calendar days. Key contract terms include liquidated damages of $4,295.00 per calendar day of delay and a requirement for bid, performance, and payment bonds. Award will be made to a single bidder based on price responsiveness and reasonability, with a price evaluation preference for HUBZone small businesses. Invoicing must be processed through Wide Area WorkFlow.
W07V Endist New Orleans

POSTED

about 5 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
Santa Ana River Trail Project, Segments 2, 2A, and 3AThe Santa Ana River Trail Project, Segments 2, 2A, and 3A, is a construction initiative managed by the Riverside County Regional Park and Open Space District to install a 2.78-mile multi-use trail within the Prado Dam Flood Control Basin in unincorporated Riverside County, California. The project features a Class I asphalt or concrete bicycle path measuring eight to ten feet in width with two-foot shoulders, complemented by decomposed granite paths for pedestrian and equestrian use. Technical specifications include a maximum longitudinal slope of five percent, a two percent maximum cross fall, and a minimum 2:1 slope ratio for cut and fill areas. The scope of work also encompasses the installation of signage and striping, drainage improvements, and the application of native hydro-seed mix on graded slopes. This project is currently classified as a forecast and is contingent upon the availability of funding. Construction is planned in phases, with each individual phase expected to take approximately 12 months to complete. From an environmental standpoint, the project has been granted a Notice of Determination following a Negative Declaration under the California Environmental Quality Act, confirming that the trail will not have a significant environmental effect. Administrative oversight is provided by Gaby Adame-Algrim, Bureau Chief of Planning and Development, with the primary office located in Jurupa Valley, California.
Riverside County Regional Park and Open Space District

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB
Solicitation # ITB C-2131
The Jacksonville Port Authority is soliciting bids for contract ITB_C-2131 to perform repairs on existing prestressed concrete piles at the Talleyrand Marine Terminal, specifically within Berth 6. The scope of work includes the underwater installation of non-structural pile jackets and the design, installation, testing, and commissioning of a cathodic protection system consisting of galvanic and bulk anodes. The project must be completed within 270 calendar days from the receipt of the Notice to Proceed, with an additional one-year performance period for final cathodic protection system testing. Award will be granted to the lowest responsive and responsible bidder based on the total bid amount for specified line items. Interested contractors must attend a mandatory pre-bid conference and site visit on October 15, 2026, and submit all questions by October 19, 2026. Sealed bids must be submitted in PDF format via the OpenGov portal by 2:00 PM ET on November 3, 2026. Required submission materials include a bid bond for 5 percent of the bid amount, a signed bid form, and various certifications including Conflict of Interest, Public Entity Crime, and E-Verify forms. The contractor is required to provide performance and payment bonds for 100 percent of the contract value and ensure all personnel complete mandatory security and safety training. All project documentation and payment requests must be managed through the Trimble E-Builder Enterprise system.
Jacksonville Port Authority

POSTED

about 13 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237990
New
SLED
C26863027 GEORGE J. HATFIELD STATE RECREATION AREA - Campground Improvements
Solicitation # C26863027
Solicitation C26863027 is a lump sum contract issued by the California Department of Parks and Recreation to provide comprehensive campground improvements at the George J. Hatfield State Recreation Area in Merced County, California. The project requires the contractor to furnish all labor, materials, tools, and equipment to deliver the improvements complete and ready for use within 365 calendar days from the written notice to commence work. A mandatory job showing is required, and all bids must be submitted in PDF format to the designated email address by November 24, 2026, at 2:00 PM. The contract is awarded using the Low Price Method, with a strict requirement for a minimum of 6% Disabled Veteran Business Enterprise (DVBE) participation to be considered responsive. Evaluation preferences include a 5% Small Business preference and additional incentives for exceeding the DVBE goal, capped at a total of 100,000 dollars. Contractors must be registered with the Department of Industrial Relations per SB 854 and comply with local prevailing wage laws. Quality control measures include the requirement for mockups of landscape metal work and log types, and the state will retain 5% of each monthly progress payment as security. Final acceptance is contingent upon a state-conducted final inspection and the completion of a punch list.
California Department of Parks & Recreation

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details