Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Santa Ana River Trail Project, Segments 2, 2A, and 3A

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Ana River Trail Project, Segments 2, 2A, and 3A, is a construction initiative managed by the Riverside County Regional Park and Open Space District to install a 2.78-mile multi-use trail within the Prado Dam Flood Control Basin in unincorporated Riverside County, California. The project features a Class I asphalt or concrete bicycle path measuring eight to ten feet in width with two-foot shoulders, complemented by decomposed granite paths for pedestrian and equestrian use. Technical specifications include a maximum longitudinal slope of five percent, a two percent maximum cross fall, and a minimum 2:1 slope ratio for cut and fill areas. The scope of work also encompasses the installation of signage and striping, drainage improvements, and the application of native hydro-seed mix on graded slopes. This project is currently classified as a forecast and is contingent upon the availability of funding. Construction is planned in phases, with each individual phase expected to take approximately 12 months to complete. From an environmental standpoint, the project has been granted a Notice of Determination following a Negative Declaration under the California Environmental Quality Act, confirming that the trail will not have a significant environmental effect. Administrative oversight is provided by Gaby Adame-Algrim, Bureau Chief of Planning and Development, with the primary office located in Jurupa Valley, California.

General Info

Constructing 2.78-mile multi-use trail with asphalt, shoulders, drainage, and native seeding in Riverside County.

Agency

California → Riverside County Regional Park and Open Space District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County Regional Park and Open Space District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County Regional Park and Open Space District
Office AddressN/A
Contacts
Gaby Adame-AlgrimBureau Chief, Planning and Development

Full Description

Show more
Installation of a 2.78-mile multi-use trails within the Prado Dam Flood Control Basin in unincorporated Riverside County. This Class I asphalt/concrete bicycle path with decomposed granite pedestrian and equestrian path will include an eight-to-ten-foot bicycle path travel way with two-foot shoulders, five percent maximum slope, two percent maximum cross fall path and shoulder slopes, minimum 2 to 1 foot slope ratio for cut/fill slopes, signage and striping along the trail, implementation of drainage improvements, and application of native hydro-seed mix along graded slope areas of the new trail phases. Construction is expected to take approximately 12 months for each individual trail phase. Construction is dependent upon available funding.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Design, supply, and Installation of Newbiggin Skatepark Extension
Solicitation # NTC/SKATEPARK/2026
Newbiggin Town Council is seeking a specialist principal contractor for a turnkey design-and-build project to upgrade and extend the skatepark facility in Newbiggin-by-the-Sea. The scope of work encompasses the entire project lifecycle, including final structural designs compliant with BS EN 14974 safety standards, excavation, sub-base preparation, drainage alterations, and the installation of sprayed-concrete or modular skatepark features and safety surfacing. Key deliverables include the installation of an 18-metre spectator fence, RoSPA safety certification, and the provision of a comprehensive Operations and Maintenance manual. The successful contractor must provide a 20-year guarantee on the structural integrity of all installations. The contract is valued with an absolute budget ceiling of £96,767.00 excluding VAT, funded through Section 106 developer contributions and Scottish Power funding. Performance is scheduled from January 2027 through March 2027, with a mandatory completion date by the end of the 2026/27 financial year. The project will be executed under the JCT Minor Works Building Contract (2016 Edition) and requires strict adherence to Council Standing Orders. Awarding will be based on the Most Advantageous Tender (MAT) using a weighting of 60% quality and 40% price. Bidders must submit physical proposals via post by November 23, 2026, including fixed-price fee proposals, design concepts, RAMS, and evidence of previous municipal wheeled-sports projects. Mandatory requirements for applicants include current employer and public liability insurance of at least £5 million, which must be maintained for six years post-completion. Evaluation will focus heavily on commercial pricing, design inclusivity, technical competence regarding concrete curing and anchoring, and a proven track record of similar successful schemes.
Newbiggin Town Council

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Cartwright AML Project; 408.26.10.006
Solicitation # SRC000464
The State of North Dakota, through the North Dakota Public Service Commission's Abandoned Mine Lands Division, is soliciting proposals under solicitation SRC000464 for professional engineering and construction services to permanently close and stabilize an abandoned underground coal mine portal near Cartwright, North Dakota. The scope of work encompasses a full project lifecycle, including site investigations of geological and hydrological conditions, the development of engineering designs and technical specifications, execution of excavation and sealing activities, and final site reclamation through grading and revegetation. The contract includes a two-year post-construction warranty and maintenance period. The overall period of performance is expected to run from approximately December 1, 2026, through December 31, 2029, with a specific construction window scheduled between June 1 and August 31, 2027. Award decisions will be based on a 100-point scale, with technical proposals weighted at 80 points and cost proposals at 20 points; technical submissions must score at least 40 points to be considered responsive. Successful offerors must provide performance and payment bonds equal to 100 percent of the contract amount and provide proof of insurance satisfactory to the North Dakota Risk Management Division. Compliance with the Davis-Bacon Act for wage determinations and Buy America preferences for incorporated materials is mandatory. Proposals must be submitted via NDBuys as separate technical and cost documents by the November 17, 2026, deadline.

POSTED

about 18 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS