Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

ASPHALT SYSTEMS INC

UEI: NEKXRZH1JZN1CAGE: 38TF3

ASPHALT SYSTEMS INC is a federal contractor, registered under UEI NEKXRZH1JZN1 and CAGE code 38TF3. It has been awarded $15,691,468 across 43 federal contracts. Primary work spans Asphalt Paving Mixture and Block Manufacturing, Other Heavy and Civil Engineering Construction, and All Other Petroleum and Coal Products Manufacturing. Top awarding agencies include Department Of The Interior, Department Of Defense, and Department Of Defense (dod).

Contact Information

Registration and classification details

Registration

UEI Code

NEKXRZH1JZN1

CAGE Code

38TF3

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

2XMF

NAICS Codes

324121Asphalt Paving Mixture and Block Manufacturing(Primary)
325510Paint and Coating Manufacturing

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Asphalt Systems Inc specializes in the formulation, supply, and application of specialized asphalt surface sealers and rejuvenators for high-performance pavement maintenance in sensitive federal environments. The company delivers technically refined asphalt products designed to extend pavement life,...

Asphalt Systems Inc specializes in the formulation, supply, and application of specialized asphalt surface sealers and rejuvenators for high-performance pavement maintenance in sensitive federal environments. The company delivers technically refined asphalt products designed to extend pavement life, restore binder integrity, and mitigate weather-related degradation—particularly in national park infrastructure. Their expertise includes the precise application of pass and fog oils, sealant systems, and modified asphalt treatments tailored to extreme climatic conditions and high-traffic heritage sites. Technical differentiation lies in their ability to meet stringent environmental and performance specifications for federally managed roadways, ensuring compliance with NAPA and ASTM standards without compromising ecological sensitivity. The contractor maintains a consistent, long-standing relationship with the Department of the Interior, delivering critical pavement preservation solutions for national park systems including Yellowstone. Their work supports mission-critical transportation networks within protected lands, requiring coordination with park resource management, environmental compliance teams, and infrastructure maintenance divisions. Contract modifications and task order extensions indicate a trusted, repeat partnership rooted in reliability, regulatory adherence, and mission alignment. Asphalt Systems Inc operates exclusively within NAICS 324121, focusing on asphalt paving mixture and block manufacturing with a narrow, high-value specialization in maintenance-grade asphalt chemistries rather than new construction. This positions them as a niche supplier to federal land management agencies requiring durable, eco-compliant pavement rehabilitation products. Their market presence is defined by technical precision in product formulation and application protocols suited for low-volume, high-impact infrastructure. The company is structured as a 2L entity with no federal certifications on record and maintains its operational base in Salt Lake City, Utah. While not certified under any government programs, its consistent performance on sensitive federal projects demonstrates a strong reputation for technical reliability and regulatory compliance within the federal lands infrastructure sector.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of The Interior$11.5M73.5%
Department Of Defense$4.1M26%
Department Of Defense (dod)$84.0K0.5%
Awards by NAICS
Export
324121 - Asphalt Paving Mixture and Block Manufacturing$9.8M62.2%
237990 - Other Heavy and Civil Engineering Construction$2.9M18.6%
324199 - All Other Petroleum and Coal Products Manufacturing$1.7M10.9%
541710 - Research and Development in the Physical, Engineering, and Life Sciences$1.1M7%
422710 - Unknown NAICS$107.0K0.7%
Others - Other NAICS codes (2 codes, <0.5% each)$94.0K0.6%
Awards by Agency Over Time
Awards by Place of Performance

Open opportunities in ASPHALT SYSTEMS INC's top NAICS codes and agencies

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details