Prequalification for Design, Construction and Commissioning and related Works (Design & Build) of the Philippine Coast Guard Vessel Support Facility Wharf, Buliluyan Port, Palawan, Philippines Mrs. Akku Sansyzbayeva-Saha, Procurement Officer , UNOV

Open
EOIUNOV24841International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the design, construction, and commissioning of a new wharf at Buliluyan Port in Palawan, Philippines, to provide operational and logistical support for the Philippine Coast Guard. The primary objective is to enable the simultaneous berthing of two 97-meter Multi-Role Response Vessels while minimizing environmental and commercial disruption. The project is structured into six macro phases, ranging from preparatory surveys and design to construction, training, and final demobilization, with a total maximum duration of 902 calendar days. The scope of work includes comprehensive topographic and geotechnical surveys, the installation of precast prestressed concrete piles, and the construction of a pier and trestle equipped with rubber dock fenders, mooring bollards, and solar-powered lighting. To qualify, contractors must hold a PCAB Category AAA General Engineering license or an equivalent international GE-5 certification. Additionally, bidders must demonstrate at least five years of maritime engineering experience, including three projects valued at five million USD or more, and maintain a minimum annual turnover of five million USD for the past three years.

General Info

Design and construction of Buliluyan Port wharf for Philippine Coast Guard in Palawan.

Place of Performance

PHL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUN Secretariat
Contacts1 person available
OfficeN/A

Full Description

Show more
Description Project Scope: Design, Construct and Commission a new wharf to provide additional operational support at the existing Local Government Unit (LGU), Local Government of Bataraza, facility at Buliluyan Port, Palawan, Philippines. It is expected that the total maximum duration of the contract from Letter of Acceptance to Final De-mobilization is nine hundred and two (902) calendar days. Project Phases The contractor shall carry out the works under this contract in three macro phases, as follows: 1. Phase 1 – Preparatory works, Investigations and Design 2. Phase 2 - Mobilization and Preliminaries 3. Phase 3 - Construction Works, Completion & Taking Over 4. Phase 4 - Partial Demobilization, and Training 5. Phase 5 - Defects Notification Period (DNP) 6. Phase 6 - Final Demobilization Preliminary Scope of Works: I. Preparatory works, including: • Topographic and hydrographic survey. • Geotechnical survey, report and design. • Design of the underground, underwater, wharf, access, trestle, appurtenances, electrical and other installations, not to exceed the contract value nor time-frame. • Alterations to the design to obtain the Environmental Compliance Certificate (ECC), which will be secured by consultants appointed by the UNODC, not to exceed the contract value nor time-frame. • Certification by the Designer of Record (DOR) that designs comply with Philippine legislation and regulations, contractual requirements and specifications. • Permitting and approvals. II. Site establishment and management for construction of the pier, trestle and associated works, including: • Mobilization, demobilization and cleaning. • Rental of temporary site office and residence. • Maintain temporary site office and residence. • Provide construction safety and health program. • Provide insurances, guarantees, warranties. • Provide construction management, contract management, reporting, quality assurance, environmental compliance, project and work schedule management to ensure the construction phase does not exceed the contract value nor time-frame. • Other. III. Construction of the pier, trestle and associated works, including: • Supply and deliver 610mm vibrated driven Precast Prestressed Concrete (PSC) piles. • Install 610 mm piles. • Chip/cut and dispose of piles. • Supply and place 5000psi concrete for pile cap. • Supply and place 5000psi concrete Light Pole Foundation. • Supply and place 5000psi concrete for deck (Includes thickened Slab at Fenders). • Supply and place 5000psi concrete for deck curb. • Supply and place reinforcement for above. • Supply and install hot-dipped galvanized 100mmx100mx10mm angle bar. • Supply and deliver rubber dock fender (1250 x 850) . • Install rubber dock fender. • Supply and deliver rubber dock fender 1.4 m width x 4 m Fender Panel. • Install rubber dock fender. • Supply and deliver 70T mooring bollard. • Install mooring bollard. • Supply and deliver 6-bolt dock cleat. • Install dock cleat. • Supply and Deliver Solar Powered Light Poles. • Install Solar Powered Light Pole. • Guardrail at trestle. IV. Post-construction, including: • Operation and maintenance documents. • Operation and maintenance training. • Environmental management training. • As-built drawings. • Certify compliance with Philippine legislation and regulations, contractual requirements and specifications. • Defect liability period. This project seeks to achieve the following objectives: • To support law enforcement by the Philippine Coast Guard; • The construction of the new wharf will provide operational, and logistical support to units of the Philippine Coast Guard’s fleet while minimizing any impacts to the commercial activities at Buliluyan Port, and the environment; and • To ensure provision of berthing berthing to simultaneously support two (2) Philippine Coast Guard 97 meter Multi-Role Response Vessels (MRRV). The Philippines Coast Guard will be the beneficiary of this project. Specific Requirements/Information Prequalification Criteria: Only those vendors meeting all the following pre-qualification criteria will be invited to participate in the anticipated tender exercise: Criteria 1. Vendor (main/prime contractor) shall provide valid company documents showing certificate of Registration at the Philippine Contractors Accreditation Board (PCAB) with PCAB LICENSE Category General Engineering (Port, Harbor and Offshore Engineering) — Category AAA, Size Range: Large B or equivalent certificate for international bidders as an established General Engineering Contractor GE-5 (Ports and Harbors). 1.1. Documents required from Vendors: Copies of certificates (in English or translated into English) Criteria 2. The Vendor must demonstrate proven experience of minimum 05 years as contractor in maritime engineering works. The Vendor must submit a minimum of three (3) and a maximum of six (6) reference projects (the "Reference Projects"). Each Reference Project must be one of the following types: wharf, pier, shipping terminal, dry dock, lock or deep-water berthing basin, and must have been completed within the last ten (10) years. At least one (1) Reference Project must include construction over water. In the case of a JV or consortium, the projects of all members may be combined, provided each member's role and share in each project are stated. 2.1 Documents required from vendors: Vendors are requested to provide a narrative (between 2-5 pages) that details your experience, skills, and knowledge in relation to requirements for this project. Vendors are encouraged to provide all relevant information. The information must contain: Project Name, Client, Description, Role in the Contract, Commencement date and Completion Date. Criteria 3. The Vendor must demonstrate at least three (3) of the Reference Projects submitted under criterion 2 above must each have a construction value of at least USD five (5) million. 3.1. Documents required from vendors: Project Name, Client, Description, Role in the Contract, Commencement date and Completion Date, Total Value per project (in USD). Criteria 4. Vendor shall provide a written statement confirming that for the last three years, their minimum annual turnover for each year is USD five (5) million. 4.1. Documents required from Vendors: Written statement from vendor confirming annual turnover amount for 2025, 2024, 2023 and 2022. A proof of the minimum annual turnover will be required at the next stages of the tender process. Criteria 5. Vendor agrees to abide by the UN Supplier Code of Conduct (https://www.un.org/procurement/about-us/policies-and-regulations#un-supplier-code-of-conduct) Vendors does not have conflict of interest in accordance with UN Procurement Manual (https://www.un.org/Depts/ptd/about-us/procurement-manual) NB: Vendors (Firm, main/prime contractor, member of the Joint Venture or Subsidiary and/or sub-contractor/consultant) will be considered to have a conflict of interest if it is associated, or has been associated in the past, with a firm or any of its affiliates which have been engaged by the Naval Facilities Engineering Systems Command (NAVFAC) directly or through third parties in any capacity (as a consultant in the preparation of the design or technical specifications/ drawings or lended a personnel to firms or organizations or provided inputs when preparing Scope of Work or procurement process. 5.1 A wirtten statement from vendor. For information only: A. All vendors must be regsitered at the Basic Level (as a minimum) in the United Nations Global Market ("UNGM"), at https://www.ungm.org/Account/Registration/Company. Firms which are prequalified and invited to the RFP are encouraged to apply for Level 2 by the time they submit their proposal in response to the upcoming RFP. B. UNOV/ UNODC reserves the right to change or cancel the requirement at any time during the EOI and/or solicitation process. Thus, submitting a reply to this Request for EOI does not automatically guarantee your company will be considered for receipt of the solicitation when issued. Vendors that are deemed qualified upon completion of an objective evaluation of their EOI submission will receive the final tender solicitation documents. Vendor submissions in response to this REOI must meet the following requirements: The subject section of your email submission should state the REOI reference number, title, vendor name and the number of emails. Please see sample below: Subject: EOI/UNOV/xxxx - Design, Construct and Commission (Vendor Name) Email X of Y

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Bid Ref. #27-041 North T-Hangar Development Project
Solicitation # 27-041
The North T-Hangar Development Project, solicitation number 27-041, is a construction project for the City of Albany located at the Southwest Georgia Regional Airport. The scope of work is divided into a Base Bid and four Additive Bids. The Base Bid covers pavement reconstruction of an existing taxiway and roadway, construction of new asphalt taxilanes, and site improvements including grading, drainage, storm drain pipe installation, pavement marking, chain-link fencing, erosion control, and grassing. The Additive Bids consist of the construction of three separate T-hangar buildings (Hangar No. 1, 2, and 3) and a 4-inch-thick Portland cement concrete mow pad. The project is financed through the City of Albany and the Georgia Department of Transportation. Sealed bids are due by 2:30 p.m. on December 17, 2026. Required submissions include a bid form, addendum acknowledgement, DBE subcontractor participation form, indemnity agreement, governing law and venue form, certificate of non-collusion, drug-free workplace form, and a debarred bidders integrity form. Bidders must provide a bid bond and, upon award, a 100% performance bond and a 100% labor and materials payment bond. The contractor must maintain commercial general liability insurance of at least one million dollars. Performance timelines vary based on the award combination, ranging from 77 calendar days for the Base Bid alone to 204 calendar days for the Base Bid plus all four Additive Bids. Award decisions prioritize local bidders in the event of a tie, provided the project is not federally funded.
City of Albany

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from UN Secretariat

Same awarding agency

NAICS: 541310
New
International
Provision of Urban Study for Integrated Urban Regeneration and Sustainable Waste Management in Homs City, Syria George Njuguna
Solicitation # EOIUNON24906
The United Nations Office at Nairobi, acting for the UN-Habitat Syria Programme, is seeking Expressions of Interest from qualified firms to conduct an integrated urban study for urban regeneration and sustainable waste management in Homs City, Syria. The project focuses on the revitalization of Old Clock Square and its surrounding areas through a multidisciplinary approach. The scope of work includes participatory planning and executive design, market organization and urban management, mobility and safe access improvements, and environmental sustainability initiatives. Key deliverables involve stakeholder consultations, the creation of tender documentation, traffic analysis, and the implementation of community awareness campaigns regarding solid waste and public behavior. This solicitation is an initial request for expressions of interest and not a formal request for bids. To be eligible for the subsequent Request for Proposal stage, interested vendors must be registered with the United Nations Global Marketplace at a minimum of the Basic Registration Level. The UN encourages participation from women-owned businesses, firms promoting the inclusion of persons with disabilities, and businesses from developing countries or economies in transition. Final technical evaluation criteria will be disclosed during the formal proposal stage.
Architectural Services

POSTED

5 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS