Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

CRITICAL PATH MANAGEMENT

UEI: KSNFDT44VSK9

CRITICAL PATH MANAGEMENT is a federal contractor, registered under UEI KSNFDT44VSK9. It has been awarded $155,539 across 9 federal contracts. Primary work spans Other Management Consulting Services, Administrative Management and General Management Consulting Services, and Engineering Services. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

KSNFDT44VSK9

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of Defense$155.5K100%
Awards by NAICS
541618 - Other Management Consulting Services$116.9K75.2%
541611 - Administrative Management and General Management Consulting Services$27.6K17.7%
541330 - Engineering Services$11.0K7.1%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in CRITICAL PATH MANAGEMENT's top NAICS codes and agencies

NAICS: 541618
New
SLED
AI Consulting Services IDIQThe Port of Seattle’s Information and Communications Technology Department is preparing to issue an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for AI consulting services to support the strategic use and implementation of artificial intelligence across its operations. This initiative aims to leverage expert guidance in navigating the evolving AI landscape, ensuring responsible, efficient, and innovative adoption aligned with organizational goals. The contract will provide a flexible framework for procuring specialized consulting support as needed over its term, allowing the agency to scale resources based on evolving priorities and project demands. The North American Industry Classification System code 541618 indicates the focus on other scientific and technical consulting services, underscoring the need for high-level strategic and technical expertise rather than basic support or implementation. Primary point of contact for inquiries is Carol Hassard, with Harold Federow serving as Project Manager, both reachable through Port of Seattle official channels. The opportunity is forecasted for release, with no solicitation number assigned yet, and all performance is expected to be conducted in coordination with the Port's Seattle-based operations. Interested parties should monitor the official portal for the formal solicitation as it becomes available.
ICT Enterprise Infrastructure Services

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 541330
New
SLED
Construction Management Services IDIQThe Port of Seattle is seeking qualified firms to provide Construction Management services under an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract to support major construction projects across various phases including planning, design, construction, and closeout. These services will encompass a range of delivery methods such as Design Build, Progressive Design Build, and other alternative project delivery formats, with the primary goal of ensuring projects adhere to authorized schedules, budgets, and quality standards. The contract is intended to streamline oversight and coordination for the Port’s extensive capital improvement initiatives, requiring technical expertise in managing complex infrastructure developments. Primary point of contact for this opportunity is Hala Rabbo, who can be reached via email or phone, with additional support available from Project Manager Ann Davidson. The solicitation is classified under NAICS code 541330, which designates architectural, engineering, and related services. Although the contract is currently posted as a forecast with no official solicitation number or set-aside details, interested parties are encouraged to monitor the provided UI link for updates and future formal solicitations. The performance location will be at various Port of Seattle facilities and project sites, with no specific city or state specified in the metadata, indicating broad geographic scope across Port operations.
Construction Management

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 541330
New
Engineering Design Services
Solicitation # TPJCO Engineering Design Services 26-17
The contract solicits engineering design services to install a Viking Norsafe E-60 Conventional Lifeboat Davit on Pier 7 at the Tongue Point Job Corps Center in Astoria, Oregon. The work requires a licensed Professional Engineer to produce signed and stamped engineering drawings, structural calculations, material specifications, and a bill of materials, along with electronic PDF copies and one full-size printed drawing set. The solicitation is structured as a fee-for-service subcontracting opportunity under Management & Training Corporation, the operator of the facility, and is classified under NAICS Code 541330 with a small business size standard of $9 million in annual revenue. The acquisition is set aside exclusively for small business concerns including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, with all subcontractors required to self-certify their business category and provide a Unique Entity Identifier and Taxpayer Identification Number. The contract includes compliance with multiple Federal Acquisition Regulation clauses, including 52.219-8 for small business representation, 52.223-41 for Service Contract Labor Standards tied to Wage Determination SCA WD 2015-5577 Rev. 28, and 52.209-6 mandating debarment disclosures for first-tier subcontractors exceeding $30,000. Projects valued at $40,000 or more are subject to FFATA reporting requirements, and all contractors must adhere to DOL data privacy and reporting protocols, including mandatory encryption of personally identifiable information and reporting of any breach within one hour of discovery. The contractor must indemnify MTC against claims arising from their performance, negligence, or contract violations, and is obligated to pay at least the prevailing federal contractor minimum wage. Invoicing must include purchase order number, service dates, itemized pricing with extended and total amounts, invoice number and date, and must be submitted to MTC’s corporate office in Centerville, Utah. Payment is contingent upon delivery and acceptance of all deliverables. The Place of Performance is strictly limited to the Tongue Point Job Corps Center, and while insurance is not required, the contractor must provide immediate written notice of any delays to performance. Proposals must be submitted by email to Elizabeth Williamson by 2:00 PM PST on August 6, 2024, and must include the bid sheet, W-9,
Tongue Point Job Corps

POSTED

about 7 hours ago

DEADLINE

in about 1 hour
View Details
NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project in California, under the project identifier C2305. The work encompasses two phases: Phase 1 includes the preparation of technical specifications, civil site design drawings, and line-bid items for drilling and abandonment of the existing Corydon well in compliance with Riverside County and California State Water Resources Control Board regulations, along with full-time on-site construction management oversight; Phase 2 involves detailed architectural, structural, mechanical, electrical, and instrumentation and controls design drawings, as well as a line-item bid schedule for equipping, testing, and commissioning the new well. Key deliverables include a Preliminary Design Report at up to 30% design depth, review of approximately 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and development of record drawings reflecting field changes, alongside start-up support and operator training. The project requires strict adherence to AWWA potable water well standards, with the new well featuring a 24-inch stainless steel Ful-Flo louvered screen and vertical turbine equipment matching the existing system, and discharge piping tied into the Corydon Blend station and Malaga blending location. All work must comply with SWRCB-DDW, DWR, and EVMWD requirements. The solicitation mandates compliance with federal regulations including the Uniform Administrative Requirements, Governmentwide Debarment and Suspension, Drug-Free Workplace, and the Build America Buy America Act, requiring certified domestic content for iron, steel, and manufactured products with waiver procedures for non-compliant alternatives. Proposers must submit detailed cost proposals broken down by task, including hourly rates and incidental costs, with a not-to-exceed amount to be negotiated post-selection. The evaluation prioritizes demonstrated competence and professional qualifications, with 25% weight assigned to relevant experience and team qualifications, 25% to understanding of the project and technical approach, 20% to schedule and risk mitigation, 10% to innovation, 10% to cost value, and 10% to overall proposal quality, with cost being only one factor in award decisions. Submission is mandatory through the PlanetBids portal by September 1, 2026, with questions due by August 25, 2026, and all proposers must complete mandatory certifications including American Iron and Steel, Lobby
Ardurra Group, Inc.

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project involves the design, construction support, and comprehensive engineering services for a new municipal groundwater production well to replace and permanently abandon the existing Corydon Well located on Elsinore Valley Municipal Water District (EVMWD) property. The project is divided into two phases: Phase 1 focuses on hydrogeological evaluation, aquifer analysis, well design, site civil engineering, and full-time construction management and hydrogeological oversight during drilling and abandonment activities, with technical specifications requiring a 24-inch diameter stainless steel Ful-Flo louvered well screen matching the existing casing depth and adhering to AWWA potable water standards and California and Riverside County regulations. Phase 2 entails detailed architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for well equipping, testing, and commissioning, supported by bidding assistance and ongoing engineering services during construction. The project must comply with the Build America, Buy America Act and 2 CFR Part 184, requiring domestic sourcing of iron, steel, and manufactured products, with full documentation and certification of origin. All work must align with federal funding requirements tied to a $400,000 Bureau of Reclamation grant, triggering compliance with 2 CFR Part 200, including Uniform Administrative Requirements, audit provisions, debarment and suspension restrictions, and the Byrd Anti-Lobbying Act. The successful firm must demonstrate extensive experience in municipal groundwater projects, provide detailed qualifications and resumes of key personnel, hold applicable California professional licenses, and maintain current certifications including the California Air Resources Board Compliance Certificate and Department of Industrial Relations registration for public work. Proposals must include a cost structure broken down by task with hourly rates, travel, and incidental costs, subject to a not-to-exceed limit of $1,000,000, with performance anticipated from November 2026 through May 2028. Evaluation prioritizes demonstrated competence and professional qualifications over cost, with weighted factors for experience, technical approach, schedule, innovation, cost, and proposal quality. Submission through EVMWD’s PlanetBids portal by the September 1, 2026 deadline requires full compliance with Attachment 2 forms, including Conflict of Interest Disclosure, American Iron and Steel Certification, Debarment and Suspension Certification, SAM status, and DBE subconsultant information, along with the executed Professional Services Agreement. Monthly invoicing with progress reports is mandatory, and the District retains audit rights to records for four years after
GEI Consultants, Inc.

POSTED

about 7 hours ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
SLED
Code Compliance and Inspection CoordinationThe contract requires full adherence to all applicable local, state, and national building codes for all work performed, with the contractor responsible for ensuring that every phase of construction or renovation meets regulatory standards. Coordination with government inspectors is mandatory, including scheduling inspections, providing necessary documentation, and promptly addressing any findings or deficiencies identified during inspections. The contractor must manage punch lists efficiently, overseeing the correction of all outstanding items to achieve final approval and project completion without delay. All tasks must be executed with precision and accountability to avoid delays or penalties related to code violations. This subcontract is issued by the City of Smyrna in Georgia under NAICS code 541330, which pertains to architectural services, and is posted for bids with a response deadline of September 4, 2026. The contract does not specify a set-aside classification or target organization type, and details such as the physical location of performance or point of contact are not provided in the available data. Bidders must review the official solicitation link to access full requirements, submission guidelines, and any additional terms not included in the summary data. Failure to comply with code standards or inspection protocols may result in contract termination or financial liability.
City of Smyrna

POSTED

about 8 hours ago

DEADLINE

in 30 days
View Details
NAICS: 541330
New
SLED
Construction, Engineering and Inspection (CEI) Scope of Services for the North 3 Utilities Extension Project (UEP)
Solicitation # 2026-RFP-CP-034-JM
McKim and Creed is serving as the design engineer for the North 3 Utilities Extension Project in the northwest quadrant of Cape Coral, Florida, with the project area bounded by the North Spreader Waterway to the west, Bonefish Canal to the south, Burnt Store Road to the east, and Kismet Parkway West. The project encompasses seven primary contract areas featuring essential infrastructure improvements primarily located west of Burnt Store Road, including the installation and upgrade of utility systems. Additionally, the scope includes the design and reconstruction of major roadways—Tropicana Parkway, Yucatan Parkway, Gulfstream Boulevard, and Kismet Parkway West—along with a segment of Burnt Store Road from 1,000 feet south of Tropicana Parkway to 1,500 feet north of Kismet Parkway. Master Pump Stations 900 and 910 are designated as separate contract components within the broader project. The City is currently in the bidding phase for this effort while the North 1 UEP West is approaching construction completion. The solicitation for Construction, Engineering, and Inspection services is open under number 2026-RFP-CP-034-JM, with responses due by September 3, 2026, and is managed by the City of Cape Coral’s Procurement office through Senior Procurement Specialist Jay Myers.
Procurement

POSTED

about 11 hours ago

DEADLINE

in 29 days
View Details