Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

INTEGRATED ENVIRONMENTAL SOLUTIONS, INC.

Parent1 subsidiaryUEI: US95WNBDCKG7CAGE: 051Z6

INTEGRATED ENVIRONMENTAL SOLUTIONS, INC. is a federal contractor, registered under UEI US95WNBDCKG7 and CAGE code 051Z6. It has been awarded $52,091,156 in federal contracts. Primary work spans Other Heavy and Civil Engineering Construction, Water and Sewer Line and Related Structures Construction, and Electrical Contractors and Other Wiring Installation Contractors. Top awarding agencies include Department Of Defense, Department Of The Interior, and Other agencies (3 agencies, <0.5% each).

Contact Information

Registration and classification details

Registration

UEI Code

US95WNBDCKG7

CAGE Code

051Z6

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSubchapter S CorporationSubcontinent Asian (Asian-Indian) American OwnedMinority-Owned BusinessDOT Certified DBE

NAICS Codes

221310Water Supply and Irrigation Systems
237110Water and Sewer Line and Related Structures Construction
237990Other Heavy and Civil Engineering Construction(Primary)
423390Other Construction Material Merchant Wholesalers
532412Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing
+4 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Integrated Environmental Solutions, Inc. specializes in the design and construction of critical water and sewer infrastructure, including pipeline replacement, confined disposal facility dikes, and related civil works for defense and public utilities. Their technical expertise centers on heavy civil...

Integrated Environmental Solutions, Inc. specializes in the design and construction of critical water and sewer infrastructure, including pipeline replacement, confined disposal facility dikes, and related civil works for defense and public utilities. Their technical expertise centers on heavy civil construction techniques such as trenchless technology, earthwork stabilization, hydraulic structure installation, and confined disposal facility expansion—particularly in sensitive environmental zones. The firm demonstrates proficiency in managing complex utility upgrades under operational constraints, with experience in interim quantity adjustments and schedule extensions that reflect adaptability in dynamic field conditions. Their work on the Indiana Harbor and Canal Dike Expansion underscores advanced competency in sediment management, erosion control, and structural earthwork for environmental containment systems. The contractor maintains a consistent relationship with the Department of Defense, delivering mission-critical water and sewer infrastructure upgrades at military installations, including pipeline replacements and civil engineering enhancements that support base resilience and environmental compliance. Their engagement with MWR Ohio suggests a secondary focus on installation-level utility modernization for military family and recreational facilities. Primary work aligns with NAICS 237110, indicating deep specialization in subsurface water and sewer line construction, with supplementary experience in broader heavy civil engineering under NAICS 237990. This positions them as a niche provider for defense and public-sector agencies requiring durable, code-compliant utility infrastructure in constrained or environmentally sensitive areas. As a small business structured as a 2L entity based in Gary, Indiana, Integrated Environmental Solutions operates with regional focus but serves national defense clients through direct federal contracts. While no formal government certifications are listed, their consistent performance on complex, mission-critical projects demonstrates reliability and technical credibility within the federal construction marketplace.

Key Performance Metrics

Awards Count

98

All time

Active

1

Currently performing

Completed

97

Past period of performance

Total Awards

All time

Award Analytics & Distribution

Awards by Agency
Department Of Defense$50.5M97%Department Of The Interior$1.4M2.6%
Other agencies (3 agencies, <0.5% each)$225.6K0.4%
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Subsidiaries

1 company rolls up into INTEGRATED ENVIRONMENTAL SOLUTIONS, INC., sized by each one's own awards

See all

Compete with INTEGRATED ENVIRONMENTAL SOLUTIONS, INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for INTEGRATED ENVIRONMENTAL SOLUTIONS, INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in INTEGRATED ENVIRONMENTAL SOLUTIONS, INC.'s top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details