Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

INTEGRATED MODULAR SOLUTIONS, LLC

INTEGRATED MODULAR SOLUTIONS, LLC is a federal contractor, registered under UEI MV22KVPV8DT5 and CAGE code 69VG8. It has been awarded $83,324,424 in federal contracts. Primary work spans Prefabricated Wood Building Manufacturing, Lessors of Nonresidential Buildings (except Miniwarehouses), and Other Commercial and Industrial Machinery and Equipment Rental and Leasing. Top awarding agencies include Department Of Defense, Department Of Veterans Affairs, and Department Of Justice.

Contact Information

Registration and classification details

Registration

UEI Code

MV22KVPV8DT5

CAGE Code

69VG8

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationLimited Liability CompanyService-Disabled Veteran-Owned BusinessWoman-Owned BusinessWomen-Owned Small BusinessVeteran-Owned BusinessIndividual or concern, other than one of the proceedingMinority-Owned Business

NAICS Codes

236115New Single-Family Housing Construction (except For-Sale Builders)
236116New Multifamily Housing Construction (except For-Sale Builders)
236210Industrial Building Construction
236220Commercial and Institutional Building Construction
238220Plumbing, Heating, and Air-Conditioning Contractors
+14 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Integrated Modular Solutions, LLC specializes in the design, leasing, and maintenance of temporary and relocatable facilities for mission-critical government operations. The company delivers modular building solutions tailored for secure, high-tempo environments, including SCIFs, swing spaces, and e...

Integrated Modular Solutions, LLC specializes in the design, leasing, and maintenance of temporary and relocatable facilities for mission-critical government operations. The company delivers modular building solutions tailored for secure, high-tempo environments, including SCIFs, swing spaces, and emergency management facilities. Their technical expertise spans the full lifecycle of nonresidential modular infrastructure—from fabrication and delivery to installation, maintenance, and rapid reconfiguration—ensuring operational continuity for defense and homeland security missions. Key differentiators include deep familiarity with DoD security standards, rapid deployment protocols, and the ability to support complex logistical requirements in austere or high-security settings. The contractor maintains a strong, recurring relationship with the Department of Defense, consistently supporting Air Force and special operations units with facility sustainment for intelligence, surveillance, and reconnaissance assets. They also provide mission-critical infrastructure to the Department of Homeland Security and the Department of Justice, delivering secure, compliant modular environments for law enforcement and border operations. Their pattern of repeat engagements indicates trusted, long-term partnerships built on reliability and adherence to stringent federal facility standards. Primary industry focus centers on lessors of nonresidential buildings and prefabricated building manufacturing, with demonstrated capability in both metal and wood modular construction. The firm serves verticals requiring rapid, secure, and scalable infrastructure—particularly defense, intelligence, emergency response, and federal law enforcement. Their market positioning is defined by agility, compliance, and the ability to bridge manufacturing and field deployment for time-sensitive government needs. As a Women-Owned Small Business and Service-Disabled Veteran-Owned Business, Integrated Modular Solutions leverages federal certifications to enhance access and credibility in the government marketplace. Based in Bonham, Texas, the company operates as a small business with a focused, mission-driven footprint, strategically aligned to support national security infrastructure demands across the continental United States.

Key Performance Metrics

Awards Count

69

All time

Active

13

Currently performing

Completed

56

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by Agency Over Time
Awards by Place of Performance

Compete with INTEGRATED MODULAR SOLUTIONS, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for INTEGRATED MODULAR SOLUTIONS, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in INTEGRATED MODULAR SOLUTIONS, LLC's top NAICS codes and agencies

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside, Design-Bid-Build project for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifying equipment and a dry pipe fire suppression system. The facility will also be solar-ready, featuring conduit below the roof structure for future photovoltaic panels. The estimated project magnitude is between 1 million and 5 million dollars, with a statutory limit of 5 million dollars. The contract is a Firm Fixed Price task order awarded based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. Performance must adhere to strict standards, including UFC 3-600-01 and NFPA 13 for fire protection, and the 2021 International Building Code. The period of performance requires work to commence within 10 calendar days of the Notice to Proceed and be completed within 365 calendar days. All invoices are to be processed via Wide Area Workflow, and the project is subject to Davis-Bacon prevailing wage rates for Pierce County.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of mechanical, electrical, and underground stormwater retention systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation governed by Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor and Construction Manager for the Port of Seattle, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport. This solicitation is designated as an 8A set-aside for Small Disadvantaged Businesses and covers ten distinct construction subsystems. The scope of work includes Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2 areas, and the demolition and installation of passenger loading bridges. Additionally, the package encompasses various requirements for the main electrical rooms, including masonry, drywall, doors, frames, hardware, miscellaneous metals, firestopping, joint sealants, and paint and epoxy flooring. Budget ranges for these subsystems vary significantly, with the largest allocations for glass and aluminum systems and vertical transportation. Bidders must adhere to a Project Labor Agreement and provide a bid bond upon submission, with successful contractors required to furnish 100 percent payment and performance bonds and a Workers Compensation Waiver of Subrogation. All subcontracts will be executed using Hensel Phelps standard forms, and successful bidders must provide required Small Business Administration documentation. Bids must be submitted via email using the official bid form provided in the Instructions to Bidders. The solicitation emphasizes the inclusion of disadvantaged, veteran-owned, and HUBZone businesses in the procurement process.
Hensel Phelps

POSTED

about 10 hours ago

DEADLINE

in 1 day
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is managed by C. Overaa & Co. and is scheduled for completion within 915 calendar days. The scope of work is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a Membrane Bioreactor (MBR) system, SCADA, and support buildings; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. A critical requirement of the project is the maintenance of the existing treatment plant's operations during the first two phases of construction. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to reside in Monterey, San Benito, or Santa Cruz counties. Bids are due by October 28, 2026, following a mandatory pre-bid meeting on October 5, 2026. Subcontractors must agree to the standard Overaa agreement, provide a 100 percent performance and labor bond if requested, and comply with specific insurance requirements including a waiver of subrogation. Invoicing and payments will be processed electronically through the Textura system, with associated service fees borne by the subcontractor.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238910
New
Keystone Job Corps Building 14 Demo
Solicitation # keystone-job-corps-building-14-demo
The Keystone Job Corps is soliciting bids for the complete demolition of Building 14, the old security building, and its foundation at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work includes the demolition of an old septic system, removal of debris, trees, and rocks, and the subsequent backfilling, grading, and seeding of the area. Critical infrastructure requirements include capping the sewer line and disconnecting building power while ensuring that power and communications remain operational for the guard shack and the mountain pump house and water tank, which may require the installation of new telephone poles. Additionally, the contractor must replace the water shut-off valve with a straight pipe, a task that must be completed within a single day between 8:30 AM and 3:00 PM to minimize water service disruptions for students. This is a small business set-aside solicitation requiring contractors to be active and registered in SAM.gov. The selected contractor is responsible for providing all necessary permits, dumpsters for haul-off, chain of responsibility letters for debris, and traffic control flaggers on Foothills Drive to manage heavy equipment and local traffic. Bidders must provide separate costs for labor and materials. Compliance with the Davis-Bacon Act is mandatory, requiring the payment of prevailing wages and the submission of certified payroll.
Keystone Job Corps

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site preparation such as clearing, rock excavation, and grading, as well as the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, intrusion detection systems, and grounding and lightning protection. The project also entails the demolition of 18 existing magazines and buildings 524 and 393, along with the installation of access roads, paved loading areas, and full electrical utility infrastructure. Bidders must account for impacts to existing wetlands and required mitigation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to obtain the bid invitation and official documents.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details