Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

MW COLE CONSTRUCTION LLC

UEI: DEMAXWPFGJG1CAGE: 6WHW7

MW COLE CONSTRUCTION LLC is a federal contractor, registered under UEI DEMAXWPFGJG1 and CAGE code 6WHW7. It has been awarded $18,959,508 in federal contracts. Primary work spans Commercial and Institutional Building Construction, Site Preparation Contractors, and Water and Sewer Line and Related Structures Construction. Top awarding agencies include Department Of Veterans Affairs, Department Of Justice, and Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

DEMAXWPFGJG1

CAGE Code

6WHW7

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationLimited Liability CompanyService-Disabled Veteran-Owned BusinessVeteran-Owned BusinessSelf Certified Small Disadvantaged Business

NAICS Codes

221310Water Supply and Irrigation Systems
236210Industrial Building Construction
236220Commercial and Institutional Building Construction
237110Water and Sewer Line and Related Structures Construction(Primary)
237310Highway, Street, and Bridge Construction
+17 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

MW COLE CONSTRUCTION LLC specializes in the construction, repair, and maintenance of critical water infrastructure and facility surface systems for federal clients. Their core capabilities include the rehabilitation of elevated water tanks, extension of water tower piping systems, and precision pain...

MW COLE CONSTRUCTION LLC specializes in the construction, repair, and maintenance of critical water infrastructure and facility surface systems for federal clients. Their core capabilities include the rehabilitation of elevated water tanks, extension of water tower piping systems, and precision painting and wall covering applications on industrial water storage structures. The contractor demonstrates technical proficiency in structural waterproofing, corrosion-resistant coating systems, and confined-space work on elevated infrastructure, ensuring compliance with federal safety and environmental standards. Their specialization in maintaining mission-critical water storage assets sets them apart, particularly in environments requiring minimal operational disruption and stringent quality control. The company has delivered services to the Department of Justice and the Department of Defense, consistently supporting infrastructure resilience projects on federal installations. For the Department of Justice, they have performed surface restoration on water towers at correctional and detention facilities, while for the Department of Defense, they have executed structural repairs to elevated water tanks critical to base water supply continuity. These engagements reflect a pattern of trusted, mission-focused execution on high-priority, non-disruptive infrastructure upgrades. Their primary industry focus is in Water and Sewer Line and Related Structures Construction (NAICS 237110), with complementary expertise in Painting and Wall Covering Contractors (NAICS 238320). This dual focus positions them as a niche provider for integrated water infrastructure lifecycle management—combining structural integrity work with protective coating applications on water storage and conveyance assets. MW COLE CONSTRUCTION LLC is a Service-Disabled Veteran-Owned Business operating from The Villages, Florida. Their 2L entity structure reflects a small business model optimized for federal contracting agility. Certified under the SBA’s SDVOSB program, they leverage their veteran-owned status to serve federal agencies requiring certified small business participation, with a geographic footprint aligned to federal infrastructure needs across the southeastern United States.

Key Performance Metrics

Awards Count

27

All time

Active

0

Currently performing

Completed

27

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency Over Time
Awards by Place of Performance

Compete with MW COLE CONSTRUCTION LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for MW COLE CONSTRUCTION LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in MW COLE CONSTRUCTION LLC's top NAICS codes and agencies

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project focuses on constructing improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key technical requirements include civil and site work such as grading, demolition, saw cutting, and trucking, as well as the installation of concrete structures, concrete pipes, fittings, and welding. Additional specialized services required for the project include electrical work, traffic control, construction surveys, and SWPPP implementation. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation process, specifically seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support the project. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as solicitation SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The completed facility will feature mechanical and electrical systems, pumps, a generator, odor control equipment, stormwater facilities, and fencing. Additionally, the project requires the installation of new gravity sewers and manholes. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding requirements, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring the successful contractor to provide performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines and NEMA standards for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Bids are due by November 10, 2026, though some documents indicate a deadline of November 12, 2026.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the modification of sluice gates and installation of new slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, replacement of motor control center components, and the installation or improvement of electrical and instrumentation systems. Site-specific operational needs include the installation and operation of a temporary 11 MGD pumped bypass, excavation, trench work, and surveying of key points around the reactors. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. All subcontractors are strictly required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement by Garney Pacific. Quotes for services and supplies, including lead abatement, rebar, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the official bid date on November 18, 2026. Any exceptions to the standard purchase order and subcontract forms must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 27 days
View Details