Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

NO WORRIES REPAIR, LLC

UEI: LLZPLGBLMDD3

NO WORRIES REPAIR, LLC is a federal contractor, registered under UEI LLZPLGBLMDD3. It has been awarded $51,640 in federal contracts. Primary work spans Boat Building and Prefabricated Metal Building and Component Manufacturing. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

LLZPLGBLMDD3

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

3

All time

Active

0

Currently performing

Completed

3

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with NO WORRIES REPAIR, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for NO WORRIES REPAIR, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in NO WORRIES REPAIR, LLC's top NAICS codes and agencies

NAICS: 332311
New
SLED
Bus Shelters and Amenities
Solicitation # 26-15
Ben Franklin Transit (BFT) is soliciting proposals under RFP 26-15 for a contractor to design, fabricate, and deliver prefabricated bus stop shelters for use at individual stops, transit centers, and in partnership with local entities. The project requires shelters to be designed by a Registered Architect and structurally engineered to be weatherproof, vandal-resistant, and maintenance-free, utilizing clear tempered safety glass and anti-graffiti coating. All units must comply with ADA requirements and applicable building codes. The contract includes an initial minimum order of ten shelters, with the option for BFT to purchase additional units of varying sizes over a potential five-year term. Deliverables must be shipped knock-down and individually packaged with comprehensive technical documentation, assembly instructions, and estimated setup times. The initial order must be delivered within 120 calendar days of the Notice to Proceed. Proposals are due by December 8, 2026, and will be evaluated on a best-value basis, focusing on structural integrity, durability, aesthetics, and long-term performance. Applicants must provide a statement of qualifications including three to six projects completed within the last five years and certifications regarding debarment and non-collusion. The contract is governed by Washington State and Federal jurisprudence, with jurisdiction in Benton County, Washington. Payment terms are set at thirty calendar days following the receipt of a proper invoice. BFT also emphasizes equal opportunity and encourages participation from certified Disadvantaged Business Enterprises.
Procurement

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332311
New
Federal
Solicitation_S-280C/G Vehicle Mounted Shelter
Solicitation # W912CH-26-R-A096
The Army Contracting Command - Detroit Arsenal is soliciting proposals for a five-year, Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity contract for the manufacture and delivery of four variants of the S-280C/G Vehicle Mounted Shelter. These tactical military shelters, available in shielded and unshielded versions with or without mobilizer adapter kits, are designed to protect personnel and sensitive electronic equipment from demanding field environments and electromagnetic interference. The contract has a minimum guaranteed value of 100,000 dollars and a maximum estimated ceiling of 4,000,000 dollars. This is a 100 percent small business set-aside under NAICS 332311, with award based on a best-value tradeoff process evaluating technical factors, specifically EMI shielding design and manufacturing processes, and price. The scope of work includes first article testing, production, and the delivery of associated technical and logistics data, including the update of Technical Manual TM 10-5411-207-13&P. Manufacturing must strictly adhere to the Government-owned Technical Data Package and ASTM E1975-22 standards. Key delivery requirements include a first article test report due within 240 calendar days of contract award and a maximum monthly production rate of 20 shelters. Deliveries are FOB Destination, with an estimated distribution of 75 percent to CONUS locations, such as Sierra Army Depot, and 25 percent to OCONUS locations including Germany, Korea, or Japan. Due to the export-controlled nature of the technical data, offerors must possess a valid DD Form 2345 certification.
W6QK Acc- Dta

POSTED

about 19 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
Federal
Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility
Solicitation # W911KB29RWP01-A
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for the design and construction of two critical facilities at JBER-Richardson, Alaska, with a combined estimated value of 182.5 million dollars. The first project, the Pallet Processing Facility (JBR041), will be a 52,000 square foot, all-weather, 24-hour operation serving as the sole hazardous cargo processing point and consolidated alert preparation area, featuring NIPR and SIPR connectivity and specialized loading dock capabilities. The second project, the Rapid Deployment Facility (JBR044), will support a Brigade Combat Team (Airborne) and includes a passenger shed for personnel processing and a joint inspection facility equipped with vehicle inspection lanes, an indoor wash rack with an oil-water separator, and 463L pallet storage. Both facilities require specialized cold climate design practices for Climate Zone 7, cybersecurity for four platforms, and integrated building information systems. The anticipated period of performance spans fiscal years 2029 through 2032, with design starting in the first quarter of 2029 and a 24-month construction period beginning in 2030. This current phase is a sources-sought effort to determine the optimal project delivery method, such as Progressive Design-Build, Design-Build to Budget, or CM at Risk, and to evaluate industry capabilities regarding technical approach, past performance, and team integration.
Department Of Defense

POSTED

about 19 hours ago

DEADLINE

in 7 days
View Details